Sbir phase II: affordable onsite wastewater treatment solution

Active Cooperative Agreement Awarded Last action

Award ID
2321143
Recipient
Awarding agency
Obligated
$1,196,056

Award facts

Completion date 90% complete
Originally
Place of performance
Haleiwa, HI, USA

Award details come from USAspending.gov.

Description

Abstract
The broader/commercial impact of this small business innovation research (SBIR) phase II project addresses the poor performance and unaffordability of existing, onsite, wastewater treatment technologies. In hawaii, the state government has mandated the upgrade of 88,000 cesspools across the state by 2050, but studies have shown that 97% of homeowners will not be able to afford the upgrade. Further, an estimated 55% of hawaiian homeowners will need to install a system other than a conventional septic system due to site sizing, grading, and sensitive receiving environment constraints. The proximity of hawaiian homes to the ocean makes them particularly susceptible to rising sea levels that disrupt soil-based treatment technologies like septic systems. This is a problem in many coastal communities in america, but perhaps most notably in miami-dade county, FL where an estimated 64% of county septic tanks will begin to fail annually by 2040. Existing upgrades to septic systems exist but they take the form of septic system add-ONS or package plants that invariably drive up the cost of treatment systems. This SBIR phase II project is developing a wastewater treatment technology similar in shape and size to a solar hot water heater. The system is designed to operate passively, similar to a septic tank, but utilizing photosynthesis within a symbiotic algal-bacterial biofilm to provide high quality aerobic treatment on PAR with expensive package plants. The aboveground typology of the treatment unit protects the treatment process from high groundwater levels even during extreme flooding events, preventing the spread of disease and pollution. Further, situating the unit aboveground greatly simplifies the installation process to avoid expensive excavation costs and unearthing of homeowner backyards. This team has successfully piloted a proof-of-concept with phase I funding. Moving into phase II, the team will perform design iteration on the key geometric and operational parameters of the treatment unit and subject prototypes to sequential pilot tests in the field. The objective is to identify optimal manufacturing and design criteria for a resilient commercial treatment product that meets industry standards for use in sensitive receiving environments. This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the foundation's intellectual merit and broader impacts review criteria.- subawards are not planned for this award.

Transactions

Action Obligated Date
Amendment $199,339
Original award $996,717

Quick answers

Who received award 2321143?

2321143 was awarded to Waihome LLC by National Science Foundation on September 15, 2023.

How much is award 2321143 worth?

$1,196,056 has been obligated on 2321143.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award