This agreement provides funding to the city of pharr, texas, to implement its project to relocate lift station number 23 and associated wastewater conveyance facilities to improve wastewater system…

Active Cooperative Agreement Awarded

Award ID
03F10501
Recipient
Awarding agency
Obligated
$1,000,000

Award facts

Assistance listing
66.202 Congressionally Mandated Projects
Completion date 30% complete
Place of performance
Pharr, TX 78577, USA

Award details come from USAspending.gov.

About this award

The U.S. Environmental Protection Agency Region 6 awarded Cooperative Agreement 03F10501 to the City of Pharr, Texas, with $1 million obligated on July 30, 2026, under Assistance Listing 66.202, Congressionally Mandated Projects. The agreement funds the city's project to relocate Lift Station Number 23 and associated wastewater conveyance facilities to improve system reliability, reduce maintenance requirements, and enhance overall performance, as directed in the 2024 Consolidated Appropriations Act or as identified in an approved technical correction if one has been approved for this project.

The work includes installing approximately 2,642 linear feet of 24-inch SDR PVC gravity sewer with 9 manholes from existing Lift Station Number 23 to a relocated lift station east of the intersection of Owassa Road and North Sugar Road. It also includes constructing the relocated lift station on a tract with a minimum site area of 75 by 75 feet and installing approximately 5,090 linear feet of 8-inch DR-18 PVC force main to an existing 48-inch sanitary sewer manhole south of the intersection of Minnesota Road and Sugar Road. The existing lift station will be decommissioned by removing above-ground appurtenances to 5 feet below finished grade and filling the existing wet well with cement-stabilized sand. The city retains ownership of the existing property, and the existing 8-inch force main will be abandoned in place.

The ultimate completion date is August 31, 2027, and the place of performance is Pharr, Texas 78577.

Description

This agreement provides funding to the city of pharr, texas, to implement its project to relocate lift station number 23 and associated wastewater conveyance facilities to improve wastewater system reliability, reduce maintenance requirements, and enhance overall performance, as directed in the 2024 consolidated appropriations act or as identified in an approved technical correction if one has been approved for this project. The project includes installing approximately 2,642 linear feet of 24-inch standard dimension ratio (SDR) polyvinyl chloride (PVC) gravity sewer with 9 manholes extending from the existing lift station number 23 to a relocated lift station situated east of the intersection of owassa road and north sugar road; constructing the relocated lift station on a tract of land with a minimum site area of 75 by 75 feet; and installing approximately 5,090 linear feet of 8-inch dimension ratio 18 (DR-18) PVC force main to an existing 48-inch sanitary sewer manhole located south of the intersection of minnesota road and sugar road. The existing lift station will be decommissioned by removing above-ground appurtenances to a depth of 5 feet below finished grade and filling the existing wet well with cement-stabilized sand. The city will retain ownership of the existing property. The existing receiving manhole will remain in service to reroute flow to the relocated lift station, and the existing 8-inch force main will be abandoned in place. Activities:the activities to be performed include the execution and implementation of a wastewater infrastructure construction project. Work plan activities consist of installing the gravity sewer extension with 9 manholes to connect the existing and relocated lift station receiving manholes; constructing the relocated lift station number 23 on the conveyed site; installing the PVC force main to the existing downstream sanitary sewer manhole; decommissioning the existing lift station by removing above-ground appurtenances and filling the wet well with cement-stabilized sand; retaining the existing parcel; keeping the existing receiving manhole in service to reroute flow; and abandoning the existing force main in place. Subrecipient:no subawards are included in this assistance agreement.outcomes:the anticipated deliverables include installation of approximately 2,642 linear feet of 24-inch standard dimension ratio (SDR) polyvinyl chloride (PVC) sanitary sewer and approximately 5,090 linear feet of 8-inch dimension ratio 18 (DR-18) PVC force main; construction and relocation of lift station number 23; installation of 9 manholes with associated connections, valves, and bends; completion of 1 street crossing; and decommissioning of the existing lift station and abandonment in place of the existing 8-inch force main. The expected outcomes include reduced risk of sewage overflows and environmental contamination; improved public health by preventing untreated sewage from entering surface water and groundwater; increased system reliability and reduced maintenance requirements; long-term operations and maintenance (OANDM) cost reductions due to the use of durable PVC materials; and improved infrastructure strength during flooding and storm events. The intended beneficiaries include residents and businesses in the city of pharr, texas, served by lift station number 23; the city's utility and operations staff; and the wider community and environment, due to improved system performance and reduced pollution risks.

Quick answers

Who received award 03F10501?

03F10501 was awarded to City Of Pharr by EPA Region 6 (Regional Offices) on July 30, 2026.

How much is award 03F10501 worth?

$1,000,000 has been obligated on 03F10501.