Not listed DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE TOWN OF WINTHROP TO IMPLEMENT ITS PROJECT TO REPLACE APPROXIMATELY 700 LINEAR FEET OF 12-INCH WATER MAIN AND EXISTING PIPE SUPPORT STRUCTURES ALONG THE METHOW BRIDGE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE REPLACEMENT OF APPROXIMATELY 700 LINEAR FEET OF EXISTING 8-INCH WATER MAIN WITH NEW 12-INCH WATER MAIN, REPLACEMENT OF THE EXISTING PIPE SUPPORT SYSTEM ALONG THE METHOW RIVER BRIDGE, AND PATCHING OF THE ROADWAY DUE TO EXCAVATIONS TO REPLACE THE EXISTING WATER MAIN ALONG RIVERSIDE AVENUE BETWEEN WHITE AVENUE AND MAIN STREET.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE COMPLETED WATER MAIN REPLACEMENT AND RECORD DRAWINGS COMPLETED FOR THE PROJECT. THIS PROJECT IS EXPECTED TO LEAD TO WATER SYSTEM REDUNDANCY AND IMPROVED SAFETY AND RELIABILITY OF PUBLIC DRINKING WATER SOURCES FOR THE RESIDENTS OF WINTHROP AND REDUCED ENVIRONMENTAL RISKS FROM POTENTIAL CATASTROPHIC FAILURE AND COLLAPSE OF DETERIORATING PIPE IN THE METHOW RIVER. $0 4/13/26 Not listed DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE TOWN OF WINTHROP TO IMPLEMENT ITS PROJECT TO REPLACE APPROXIMATELY 700 LINEAR FEET OF 12-INCH WATER MAIN AND EXISTING PIPE SUPPORT STRUCTURES ALONG THE METHOW BRIDGE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE REPLACEMENT OF APPROXIMATELY 700 LINEAR FEET OF EXISTING 8-INCH WATER MAIN WITH NEW 12-INCH WATER MAIN, REPLACEMENT OF THE EXISTING PIPE SUPPORT SYSTEM ALONG THE METHOW RIVER BRIDGE, AND PATCHING OF THE ROADWAY DUE TO EXCAVATIONS TO REPLACE THE EXISTING WATER MAIN ALONG RIVERSIDE AVENUE BETWEEN WHITE AVENUE AND MAIN STREET.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE COMPLETED WATER MAIN REPLACEMENT AND RECORD DRAWINGS COMPLETED FOR THE PROJECT. THIS PROJECT IS EXPECTED TO LEAD TO WATER SYSTEM REDUNDANCY AND IMPROVED SAFETY AND RELIABILITY OF PUBLIC DRINKING WATER SOURCES FOR THE RESIDENTS OF WINTHROP AND REDUCED ENVIRONMENTAL RISKS FROM POTENTIAL CATASTROPHIC FAILURE AND COLLAPSE OF DETERIORATING PIPE IN THE METHOW RIVER. $0 9/22/25 Not listed DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE TOWN OF WINTHROP TO IMPLEMENT ITS PROJECT TO REPLACE APPROXIMATELY 700 LINEAR FEET OF 12-INCH WATER MAIN AND EXISTING PIPE SUPPORT STRUCTURES ALONG THE METHOW BRIDGE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE REPLACEMENT OF APPROXIMATELY 700 LINEAR FEET OF EXISTING 8-INCH WATER MAIN WITH NEW 12-INCH WATER MAIN, REPLACEMENT OF THE EXISTING PIPE SUPPORT SYSTEM ALONG THE METHOW RIVER BRIDGE, AND PATCHING OF THE ROADWAY DUE TO EXCAVATIONS TO REPLACE THE EXISTING WATER MAIN ALONG RIVERSIDE AVENUE BETWEEN WHITE AVENUE AND MAIN STREET.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE COMPLETED WATER MAIN REPLACEMENT AND RECORD DRAWINGS COMPLETED FOR THE PROJECT. THIS PROJECT IS EXPECTED TO LEAD TO WATER SYSTEM REDUNDANCY AND IMPROVED SAFETY AND RELIABILITY OF PUBLIC DRINKING WATER SOURCES FOR THE RESIDENTS OF WINTHROP AND REDUCED ENVIRONMENTAL RISKS FROM POTENTIAL CATASTROPHIC FAILURE AND COLLAPSE OF DETERIORATING PIPE IN THE METHOW RIVER. $0 1/22/25 Not listed DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE TOWN OF WINTHROP TO IMPLEMENT ITS PROJECT TO REPLACE APPROXIMATELY 700 LINEAR FEET OF 12-INCH WATER MAIN AND EXISTING PIPE SUPPORT STRUCTURES ALONG THE METHOW BRIDGE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE REPLACEMENT OF APPROXIMATELY 700 LINEAR FEET OF EXISTING 8-INCH WATER MAIN WITH NEW 12-INCH WATER MAIN, REPLACEMENT OF THE EXISTING PIPE SUPPORT SYSTEM ALONG THE METHOW RIVER BRIDGE, AND PATCHING OF THE ROADWAY DUE TO EXCAVATIONS TO REPLACE THE EXISTING WATER MAIN ALONG RIVERSIDE AVENUE BETWEEN WHITE AVENUE AND MAIN STREET.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE COMPLETED WATER MAIN REPLACEMENT AND RECORD DRAWINGS COMPLETED FOR THE PROJECT. THIS PROJECT IS EXPECTED TO LEAD TO WATER SYSTEM REDUNDANCY AND IMPROVED SAFETY AND RELIABILITY OF PUBLIC DRINKING WATER SOURCES FOR THE RESIDENTS OF WINTHROP AND REDUCED ENVIRONMENTAL RISKS FROM POTENTIAL CATASTROPHIC FAILURE AND COLLAPSE OF DETERIORATING PIPE IN THE METHOW RIVER. $0 11/5/23 Not listed DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE TOWN OF WINTHROP TO IMPLEMENT ITS PROJECT TO REPLACE APPROXIMATELY 700 LINEAR FEET OF 12-INCH WATER MAIN AND EXISTING PIPE SUPPORT STRUCTURES ALONG THE METHOW BRIDGE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE REPLACEMENT OF APPROXIMATELY 700 LINEAR FEET OF EXISTING 8-INCH WATER MAIN WITH NEW 12-INCH WATER MAIN, REPLACEMENT OF THE EXISTING PIPE SUPPORT SYSTEM ALONG THE METHOW RIVER BRIDGE, AND PATCHING OF THE ROADWAY DUE TO EXCAVATIONS TO REPLACE THE EXISTING WATER MAIN ALONG RIVERSIDE AVENUE BETWEEN WHITE AVENUE AND MAIN STREET.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE COMPLETED WATER MAIN REPLACEMENT AND RECORD DRAWINGS COMPLETED FOR THE PROJECT. THIS PROJECT IS EXPECTED TO LEAD TO WATER SYSTEM REDUNDANCY AND IMPROVED SAFETY AND RELIABILITY OF PUBLIC DRINKING WATER SOURCES FOR THE RESIDENTS OF WINTHROP AND REDUCED ENVIRONMENTAL RISKS FROM POTENTIAL CATASTROPHIC FAILURE AND COLLAPSE OF DETERIORATING PIPE IN THE METHOW RIVER. $667.0k 9/13/23