This agreement provides funding to the kearns improvement district to implement its drinking water supply repair and resiliency project as directed in the 2024 consolidated appropriations act or as…

Active Cooperative Agreement Awarded

Award ID
00I13101
Recipient
Awarding agency
Obligated
$1,250,000

Award facts

Assistance listing
66.202 Congressionally Mandated Projects
Completion date 33% complete
Funding
  • $1,000,000.00 Federal
  • $250,000.00 Non-federal
Place of performance
Salt Lake City, UT 84118, USA

Award details come from USAspending.gov.

About this award

The Environmental Protection Agency Region 8 awarded Cooperative Agreement 00I13101 to Kearns Improvement District on May 13, 2026, obligating $1.25 million under the Congressionally Mandated Projects program (CFDA 66.202). The program funds special congressionally mandated spending identified in EPA's appropriations act or related statutes, and this award implements the district's drinking water supply repair and resiliency project.

The recipient will construct approximately 2,240 linear feet of new 12-inch C-900 pipe along Sams Boulevard (4320-4015 West). The work includes connections to existing 12-inch supply lines at 4320 West and 5215 South and to the existing 8-inch line at 4015 West, plus installation of 8 fire hydrants and related appurtenances. The existing undersized 6-inch asbestos concrete line will be abandoned in place. The source states that the existing pipe does not meet Utah Division of Drinking Water requirements for supplying water to the area, and the project is intended to provide an adequate supply that meets drinking water standards and required capacity for district residents.

Place of performance is Salt Lake City, UT 84118. The ultimate completion date is December 31, 2027. The agreement includes no subawards.

Description

This agreement provides funding to the kearns improvement district to implement its drinking water supply repair and resiliency project as directed in the 2024 consolidated appropriations act or as identified in an approved technical correction if one has been approved for this project. Activities:the activities to be performed include the execution and implementation of a drinking water infrastructure construction project. Workplan activities consist of the construction of approximately 2,240 linear feet of new 12-inch diameter C-900 pipe along sams boulevard (4320-4015 west), with connections to existing 12-inch supply lines at 4320 west and 5215 south and to the existing 8-inch line at 4015 west, as well as the installation of 8 fire hydrants and related appurtenances. The existing undersized 6-inch asbestos concrete line will be abandoned in place. Subrecipient:no subawards are included in this assistance agreement.outcomes:the existing water pipe does not meet the utah division of drinking water requirements for supply of water to this area. The anticipated deliverables include replacement of an undersized 6-inch asbestos concrete water supply line with a new 12-inch C-900 water supply line. This project will provide an adequate supply of water that meets the drinking water standards and required capacity for kearns improvement district residents.

Quick answers

Who received award 00I13101?

00I13101 was awarded to Kearns Improvement District by EPA Region 8 (Regional Offices) on May 13, 2026.

How much is award 00I13101 worth?

$1,250,000 has been obligated on 00I13101: $1,000,000 in federal funding and $250,000 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award