This Cooperative Agreement award from the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) provides $2,000,000 in funding to the City of Parsons, West Virginia to implement a sanitary sewer improvement project. The key activities include the removal and replacement of approximately 11,050 linear feet of sanitary sewer lines, the installation of 35 manholes and 130 service connections, as well as the purchase of a new vacuum tanker...
The U.S. Environmental Protection Agency (EPA) awarded the City of Streator a $800,000 Cooperative Agreement under the Congressionally Mandated Projects program (CFDA 66.202) to implement a project separating the city's combined storm and sanitary sewer systems in the Leroy/Milner area. The anticipated deliverables include: Installation of new storm sewer infrastructure, including storm inlets and manholes Pavement and landscape restoration following the sewer work Traffic control measures...
This $1,645,900 Cooperative Agreement awarded by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) provides funding to the Metropolitan Water Reclamation District of Greater Chicago (MWRD) to assess and rehabilitate high-risk sanitary sewer systems in several municipalities within Cook County, Illinois. The project will be executed in two phases. Phase I will involve conducting a condition assessment of the high-risk sewer system...
This Cooperative Agreement, awarded by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), provides $3,000,000 in funding to the Sacramento Area Sewer District to replace failing septic tanks and provide sanitary sewer service to the communities of Franklin and Hood in Sacramento County, CA. The project activities include abandoning septic systems and constructing approximately 43,000 feet of new sewer mainline, lower laterals, and...
This Cooperative Agreement award from the U.S. Environmental Protection Agency (EPA) Region 5 provides $1,690,000 in funding to the City of Birmingham, Michigan to implement its Combined Sewer System Critical Rehabilitation Program. The activities to be performed under this project include the removal of accumulated debris or sediment, root mass removals, mineral deposit removals, full-length or spot sewer lining, and installation of internal sleeves. The anticipated outcomes are reduced...
This Cooperative Agreement award, provided by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), will provide $430,621 in funding to the City of Wilson, North Carolina to implement a project to resolve sanitary sewer overflows (SSOs) along an 18-inch gravity sewer line. The project activities will involve the replacement of approximately 5,600 linear feet of the 18-inch sewer line and associated manholes. The expected outcomes...
This EPA Region 5 Cooperative Agreement award of $241,572 provides funding to the City of Mount Vernon, Illinois to implement a project to rehabilitate the city's sanitary sewer system. The project will be completed in three phases: Phase 1 - Condition assessment of approximately 67,770 linear feet of 8 to 21-inch sanitary sewer mains through cleaning, investigation, and grading. Phase 2 - NEPA environmental review for areas where sewer point repairs or main replacements will be conducted. Phase...
This $760,000 Cooperative Agreement awarded by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) provides funding to the City of New Brunswick, New Jersey, to rehabilitate and replace the sanitary sewer system on Lee Avenue and Reservoir Avenue. The project activities include removing existing manholes and piping, and installing new manholes and associated piping to eliminate recurring sewage backups and infiltration issues impacting...
This Cooperative Agreement award, provided by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), provides $988,750.00 in funding to El Paso County, Texas to design approximately 568 first-time sanitary sewer and yardline connections. The project aims to create a 30,000 linear foot wastewater collection system to serve the Ponderosa, Shuman Estates, Western Village, and Serene Acres Road communities, with an estimated 2,000 direct...
This $800,000 Cooperative Agreement, awarded by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), provides funding to the City of Show Low, Arizona to implement a sewer line replacement project. The main activities to be performed include the final design of the sewer line replacement pipeline, obtaining necessary permits, construction procurement, and completing the replacement construction. The anticipated deliverables are: 1) a...

DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF SESSER TO IMPLEMENT ITS PROJECT TO REPLACE APPROXIMATELY 5,600 FEET SANITARY SEWER LINE AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:THE CITY OF SESSER WILL BE REPLACING THE SANITARY SEWER MAIN LOCATED BETWEEN SOUTH COCKRUM STREET AND BROADWAY STREET ON THE EAST AND WEST, AND ESPY STREET AND COAL AVENUE ON THE NORTH AND SOUTH. THE WORK WILL INCLUDE EXCAVATION AND REMOVAL OF THE EXISTING VITRIFIED CLAY PIPE SANITARY SEWER TRUNKLINE, REPLACEMENT WITH NEW 8', 10', AND 12' SDR 26 PVC PIPE, PROPER BEDDING, HAUNCHING, AND BACKFILL TO ENSURE LONGEVITY, AND RECLAMATION OF THE DISTURBED GROUND AREA. OTHER WORK ASSOCIATED WITH THE REPLACEMENT OF THE SANITARY SEWER LINE INCLUDES REMOVAL AND REPLACEMENT OF APPROXIMATELY 14 SANITARY MANHOLES, RECONNECTION OF SEWER SERVICE LINES, POTENTIAL ROCK EXCAVATION, AND PAVEMENT AND SIDEWALK REMOVAL AND REPLACEMENT.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE SIGNIFICANT IMPROVEMENT OF THE CITY'S SANITARY SEWER INFRASTRUCTURE. THIS INFRASTRUCTURE IMPROVEMENT ALIGNS WITH STATED GOALS WITHIN EPA'S OBJECTIVE 5.1 WHICH ARE EXPECTED TO LEAD TO REDUCED CHANCE OF SEWAGE OVERFLOWS AND SEWERMAIN COLLAPSES, BOTH OF WHICH ARE DIRECT THREATS TO COMMUNITY AND ENVIRONMENTAL HEALTH. THE INTENDED BENEFICIARIES ARE THE CITY OF SESSER RESIDENTS.

Posted 3/13/23, 12:00 AM