DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING FOR THE TOWN OF CUMBERLAND TO IMPLEMENT ITS PROJECT TO UPGRADE STORMWATER INFRASTRUCTURE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A STORM WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF ENGINEERING WORK RELATED TO THE DESIGN, PERMITTING, AND BIDDING OF THE PROJECT, AS WELL AS CONSTRUCTION WORK INCLUDING RELOCATING 390 FEET OF 24 INCH DRAINAGE PIPE, INSTALLATION OF NEW CATCH BASINS, THE INSTALLATION OF A NEW UNDERGROUND DETENTION SYSTEM, AND RESTORATION OF THE ROADWAY TO EXISTING CONDITIONS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE ENGINEERING DESIGN, PERMITTING AND PUTTING OUT TO BID THE CONSTRUCTION PORTION OF THE PROJECT. ADDITIONALLY, THE CONSTRUCTION PORTION OF THE PROJECT INVOLVES THE RELOCATION OF 390 LINEAR FEET OF DRAINAGE PIPE, THE INSTALLATION OF NEW CATCH BASINS, THE INSTALLATION OF A NEW UNDERGROUND DETENTION SYSTEM, AND THE RESTORATION OF THE ROADWAY AND ADJACENT PARKING AREA TO EXISTING SURFACE CONDITIONS. THE EXPECTED OUTCOMES INCLUDE AN IMPROVED DRAINAGE SYSTEM THAT WILL REDUCE STORMWATER FLOODING ON INDUSTRIAL ROAD. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS AND INDUSTRY IN CUMBERLAND, RI THAT HAVE BEEN ADVERSELY IMPACTED BY THE ROADWAY FLOODING CONDITIONS, AS WELL AS THRU TRAFFIC IN THE AREA THAT WILL BETTER BE ABLE TO USE THE ROADWAY.