- Federal Cooperative Agreement Award Summary The U.S. Environmental Protection Agency (EPA) Region 1 awarded York Sewer District a Cooperative Agreement valued at $1.2 million under the Congressionally Mandated Projects program (CFDA 66.202) on May 1, 2025, to optimize key operational areas of its wastewater treatment facility (WWTF). The primary deliverables include basis of design documents for headworks screening equipment and aeration tank modifications, with completion targeted for...
- Federal Cooperative Agreement Summary The City of Bath received a $3.97 million Cooperative Agreement from the U.S. Environmental Protection Agency (EPA) Region 1 under the Congressionally Mandated Projects program (CFDA 66.202), awarded May 1, 2025, with a completion deadline of June 30, 2026. The award funds the design and construction of wastewater infrastructure improvements in Bath, Maine, specifically including a new force main and conveyance system upgrades to the city's wastewater...
- Federal Cooperative Agreement Summary The Environmental Protection Agency (EPA) Region 1 awarded the Town of Hampden, Maine a $2.5 million Cooperative Agreement under the Congressionally Mandated Projects program (CFDA 66.202) on January 15, 2026, with an ultimate completion date of July 30, 2027. This award, authorized through the 2023 Consolidated Appropriations Act, funds the complete decommissioning and replacement of the existing Souadabscook Pump Station with a new submersible pump station...
- The Maine School Administrative District #52 (MSAD52) received a $750,000 Cooperative Agreement from the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) to replace its wastewater treatment facility. The key activities to be performed under this award include the purchase and installation of a new Bioclere package wastewater treatment system, as well as the installation of new manholes and sewer lines to connect the facility to the...
- This Cooperative Agreement award, provided by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), provides $1,252,950.00 in funding to the City of Aumsville, Oregon to implement wastewater system improvements. The key activities to be performed include the installation of a Sequencing Batch Reactor (SBR) system and upgrades to the existing gravity-fed wastewater collection system. The anticipated deliverables are a new wastewater...
- Federal Cooperative Agreement Summary The Town of Winslow received a $3.0 million Cooperative Agreement award from the U.S. Environmental Protection Agency (EPA) Region 1 under the Congressionally Mandated Projects program (CFDA 66.202), effective September 1, 2025, with an ultimate completion date of September 30, 2027. This award, mandated through the 2024 Consolidated Appropriations Act, funds the Water and Sewer Infrastructure Upgrades Project in the Sunset Heights neighborhood of Winslow,...
- Federal Cooperative Agreement Summary The City of Dover, New Hampshire received an $8.14 million Cooperative Agreement from the Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), awarded October 1, 2025, with an ultimate completion date of October 2, 2026. The project involves the replacement of 6,000 feet of existing cast iron water mains extending from the 4-million-gallon Garrison Hill Water Storage Tank to Broadway. Phase 1 will upgrade...
- Federal Cooperative Agreement Award Summary The Environmental Protection Agency (EPA) Region 1 awarded a $2.0 million Cooperative Agreement to Mechanic Falls Sanitary District under the Congressionally Mandated Projects program (CFDA 66.202) on March 1, 2026, with a completion date of June 30, 2028. The funding supports a wastewater infrastructure improvements project that will replace leaking sewers on Clifford, First, Third, Fourth, and Fifth Streets in Mechanic Falls, Maine, with select...
- Federal Grant Award Summary The U.S. Environmental Protection Agency (EPA) Region 1 awarded $14.74 million to the Maine Department of Environmental Protection on October 1, 2025, under the Clean Water State Revolving Fund (CWSRF) program (CFDA 66.458). This capitalization grant funds Maine's establishment and maintenance of a long-term, self-sustaining state revolving loan fund that provides low-interest financing to municipalities and utilities for water infrastructure projects. The grant...
- This Cooperative Agreement award, funded by the Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), provides $3,060,000 to the City of Wilmington, Delaware to rehabilitate the Price's Run sewer interceptor and associated combined sewer overflow (CSO) facilities. The key activities to be performed include repairing invert voids, correcting structural issues, and rehabilitating approximately 4,000 linear feet of the most deteriorated sections of...
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF SACO, MAINE TO IMPLEMENT ITS PROJECT TO COMPLETE A FULL FACILITY UPGRADE OF THE SACO, MAINE WATER RESOURCE RECOVERY PROJECT AS DIRECTED IN THE FY2022 AND FY2023 CONSOLIDATED APPROPRIATIONS ACT. THE ANTICIPATED DELIVERABLE IS A NEWLY UPGRADED WASTEWATER TREATMENT FACILITY, WHICH WILL LEAD TO AN IMPROVED, RELIABLE AND EFFICIENT WASTEWATER TREATMENT FACILITY. THE WASTEWATER TREATMENT FACILITY WILL RESULT IN IMPROVED WATER QUALITY AND ENVIRONMENTAL CONDITIONS WHICH WILL BENEFIT THE CUSTOMERS AND USERS OF THE SACO WWTP (THE INTENDED BENEFICIARIES).ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE TO FULLY UPGRADE THE SACO WATER RESOURCE RECOVERY FACILITY (WRRF) BY CONSTRUCTING A NEW BIOLOGICAL WASTEWATER TREATMENT SYSTEM, WHICH PROJECT WILL MAKE THE FACILITY RESILIENT TO SEA LEVEL RISE, FLOODING, AND INCREASED WET WEATHER EVENTS. THE PROJECT WILL ALSO REPLACE AGING EQUIPMENT AND TANKS, AND WILL INCREASE THE TREATED PEAK FLOW CAPACITY FROM 8 TO 12 MILLION GALLONS PER DAY (AVERAGE) AND A PEAK HOURLY FLOW OF 14 MILLION GALLONS PER DAY. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE LISTED BELOW FOR THE THREE (3) PHASES OF THE PROJECT. THESE THREE PHASES ARE EXPECTED TO LEAD TO IMPROVED WATER QUALITY IN THE ATLANTIC OCEAN AND SERVE THE RESIDENTS OF SACO AND BIDDEFORD, MAINE WITH IMPROVED WASTEWATER TREATMENT SERVICE. DELIVERABLES WILL BE AVAILABLE IN THREE PHASES, PHASE 1 INCLUDES: #61623; DEMOLITION OF THE EXISTING FRONT STREET GARAGE, #61623; EXCAVATION FOR THE BUILDING SLAB AND FOUNDATION, #61623; DRIVEN STEEL PILES TO SUPPORT THE BUILDING FOUNDATION, #61623; NEW SITE PIPING, #61623; SITE GRADING AND FRONT STREET GRADING TO ADDRESS TIDAL FLOODING, #61623; SELECTIVE DEMOLITION OF AGING STRUCTURES, #61623; REPURPOSING OF EXISTING TANKS FOR WET WEATHER STORAGE AND REDUCTION OF CSOS, #61623; PLANT ACCESS ROAD REMOVAL AND REPLACEMENT AT HIGHER ELEVATION THROUGH THE MIDDLE OF THE SITE, #61623; ADDITION OF PUBLIC BATHROOM FACILITIES, #61623; IMPROVEMENTS TO THE RIVERWALK AND GREENSPACE PHASE 2: HEADWORKS DELIVERABLES WILL INCLUDE: THE HEADWORKS SCREENS LARGE OBJECTS AND INERT GRIT MATERIAL FROM INCOMING WASTEWATER TO PROTECT DOWNSTREAM EQUIPMENT. THE HEADWORKS WILL BE CONSTRUCTED IN PARALLEL WITH THE PROJECT'S INITIAL PHASE (ABOVE). THE SCOPE OF THE PROPOSED HEADWORKS IMPROVEMENTS INCLUDES: #61623; NEW HEADWORKS BUILDING TO HOUSE NEW EQUIPMENT, #61623; NEW INFLUENT FLOW METERING, #61623; NEW INFLUENT SCREENING AHEAD OF THE NEW SECONDARY TREATMENT SYSTEM, #61623; NEW SCREENINGS WASHER COMPACTER AND STORAGE SYSTEM, #61623; NEW GRIT REMOVAL SYSTEM, AND #61623; STORMWATER DRAINAGE IMPROVEMENTS AROUND THE HEADWORKS BUILDING. PHASE 3 WILL INCLUDE ELECTRICAL EQUIPMENT COMPONENTS AS DELIVERABLES SUCH AS: #61623; NEW ELECTRICAL MOTOR CONTROL CENTER EQUIPMENT AND CONTROLS LOCATED AT A HIGHER ELEVATION, #61623; REPLACE THE ELECTRICAL HANDHOLE NORTH OF THE BUILDING THAT IS SUBJECT TO FLOODING, #61623; NEW UNDERGROUND PRIMARY ELECTRICAL SERVICE, UTILITY TRANSFORMER (AT A HIGHER ELEVATION), STANDBY GENERATOR, GROUNDING, AND #61623; A DEDICATED BUILDING TO HOUSE ELECTRICAL AND CONTROL EQUIPMENT
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $9.0m | 7/10/24 |