Purchase Order W912P524P0066

Award Date 9/27/24
Potential Completion Date 9/15/27
Potential Value $6.5M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST Nashville
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Federal Contract Vehicle
Extent Competed
Competed under SAP
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Grand Rivers, KY 42045, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
4
Legislative Mandate
Employment Eligibility Verification
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a $274,135.53 firm fixed-price purchase order contract awarded to Greisen Aerospace, LLC, a small business located in Brunswick, Maine, by the U.S. Army Corps of Engineers. The contract is for the fabrication of two gate lifting chains, including all necessary components for assembly and installation, for the Orwell Dam. The contract has a total small business set-aside. Greisen Aerospace is a HUBZone small business that specializes in fabricating specialized equipment and components...
The U.S. Army Corps of Engineers awarded a $13,972,405.45 firm fixed-price contract to BCI Construction USA, Inc. for the mechanical and electrical rehabilitation of 12 spillway gates at the Barkley Dam in Grand Rivers, Kentucky. This contract is a follow-on to a previous pre-solicitation and is not set aside. BCI Construction USA, Inc. is a Veteran-Owned Small Business and Service-Disabled Veteran-Owned Small Business that has been awarded over $130 million in definitive contracts with the U.S....
This is a firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Jeffrey Chain, L.P., a small business, for the TAS Recovery - Spillway Gate Chains project. The contract has a ceiling value of $1,194,780.17 and an ultimate completion date of January 17, 2010. The contract was set aside for small businesses. The project involves the recovery and repair of spillway gate chains, likely related to the USACE's water resource management and flood control...
This $428,000 firm fixed-price purchase order was awarded by the U.S. Army Corps of Engineers (USACE) to Johnson Machine Works, Inc., a small business manufacturer, to fabricate and deliver one new spillway bulkhead section for Barkley Dam in Kentucky. The contract is set aside for total small business concerns under NAICS code 332312 for Fabricated Structural Metal Manufacturing. The original pre-solicitation notice specified that the bulkhead section must be approximately 58 feet long, 8...
<p>The Department of the Army Corps of Engineers Engineering District Rock Island has awarded a Definitive Contract to Lemke Industrial Machine LLC, a for-profit limited liability company, for the base bid and option A for Tainter gate chains, connection and turnbuckle assemblies, and repair links, with delivery to Lock and Dam 11. The contract has a firm fixed price of $1,153,404.00 and a completion date of April 30, 2018. The contract was not set aside for any specific business type.</p>
This federal contract award, valued at $828,925.00, was issued by the U.S. Army Corps of Engineers to Steward Machine Co Inc., doing business as Earle Reducers, a small business manufacturer based in Birmingham, Alabama. The contract is for the fabrication and delivery of JPP spillway gate chains, which are critical components for locks and dams maintained by the U.S. Army Corps of Engineers. The contract is a delivery order issued under the Metal Fabrication, Refurbishment, and Installation...
This federal contract award, identified as W912P908D0519|0002, was issued by the U.S. Army Corps of Engineers (USACE) to Lemke Industrial Machine, Inc. The $4,838,763.00 firm-fixed-price delivery order is for the fabrication and delivery of Tainter gate pocket chain machinery, shaft gears, and spare parts for Lock and Dam 24 in Clarksville, Missouri and Lock and Dam 25 in Winfield, Missouri. This contract is part of the American Recovery and Reinvestment Act (ARRA) and has an ultimate completion...
This federal contract was awarded by the Department of the Army Corps of Engineers to BCI Construction USA Inc., a Service Disabled Veteran Owned Small Business. The $2,212,174.25 firm-fixed-price contract is for the emergency rehabilitation of gates at the Barkley Lock and Dam in Grand Rivers, Kentucky. The contract does not have a small business set-aside designation. BCI Construction USA Inc. has been awarded over $130 million in federal contracts since 2019 to perform infrastructure...
The U.S. Army Corps of Engineers has awarded a $18,216,838.00 firm-fixed-price contract to G &amp; G Steel Inc., a small business manufacturer based in Russellville, Alabama, for the fabrication and delivery of replacement miter gates and associated ancillary equipment for Lock and Dam (LD) 3, 4, and 5 on the Upper Mississippi River. The work includes fabricating, testing, painting, prestressing, and delivering new lock chamber miter gate assemblies, as well as providing options for anchorage...
The U.S. Department of the Army Corps of Engineers awarded a $244,302.84 firm-fixed price contract to Edwards Enterprises LLC, a self-certified small disadvantaged business, for a requirement of steel alloy link chain assemblies to replace existing tainter gate hoist chains. This contract was a competitive acquisition with no set-aside designation. The 30 individual chains, along with master links and fabricated gate connection hardware, will be manufactured to the Corps' specifications and...

The U.S. Army Corps of Engineers, Nashville District, awarded a $6,533,711.53 firm-fixed-price purchase order contract to Greisen Aerospace, LLC, a small business manufacturer located in Brunswick, Maine, for the fabrication, assembly, and delivery of new spillway gate lifting chains for the Lake Barkley Dam. The contract has a base requirement for three gates (6 total chain lengths) and options for up to 24 total chain lengths, depending on funding availability. The contractor will be responsible for fabricating the various metallic components that make up the spillway gate chains, which are approximately 80 feet in length. The contract has a total small business set-aside designation and a period of performance through September 15, 2027.