Purchase Order W911WN24P8002

Award Date 4/9/24
Potential Completion Date 7/11/24
Potential Value $92K
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST Pittsburgh
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Federal Contract Vehicle
Extent Competed
Competed under SAP
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
New Kensington, PA 15068, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
8
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a firm-fixed price purchase order awarded by the U.S. Army Corps of Engineers to Green Build USA LLC, a small business based in Coatesville, Pennsylvania, for the replacement of the operations building roof and cupola roof at the Allegheny River Lock and Dam 7 in Kittanning, Pennsylvania. The $97,711.25 contract involves the removal and disposal of the existing roofing materials and installation of a new EPDM roof system and wood and asphalt shingle roof system. The work must be...
This is a firm fixed-price purchase order awarded by the U.S. Army Corps of Engineers to Green Build USA LLC, a small business contractor, for $112,750.75 to replace the operations building roof at Allegheny River Lock and Dam #8 in Templeton, PA. The contract includes asbestos remediation, installing a new EPDM roofing system with insulation, and replacing the smaller peaked wooden cupola roof with new wood and asphalt shingles. The contract also requires the contractor to reroute...
This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers, Pittsburgh District to A&P Remodeling Co Inc., a small business, to reroof the Allegheny River Lock and Dam No. 2 buildings in Pittsburgh, PA. The contract has a ceiling value of $89,812.50 and a performance period of 120 days after receipt of the notice to proceed. The contract was awarded on August 21, 2019 and is set aside for small businesses. The work involves removing the existing roofing...
The U.S. Army Corps of Engineers, Pittsburgh District, awarded a $203,313.50 firm-fixed-price contract to Green Build USA LLC, a small business based in Coatesville, PA, for the roof replacement of the maintenance building at Crooked Creek Lake in Ford City, PA. The contract has a completion date of April 1, 2025 and was set aside for small businesses. The scope of work includes removing and disposing of the existing roof system components, installing new insulation, cover board, membrane,...
The U.S. Army Corps of Engineers awarded a $107,500.00 firm-fixed price purchase order to Best Choice Construction LLC, a self-certified small disadvantaged business and limited liability company, for the replacement of the roof systems at the Allegheny River Lock and Dam 6 in Freeport, Pennsylvania. The contract was set aside for total small business participation. The requirements included removing and disposing of the existing roofing materials, insulation, vent/drain covers, and conductor...
The Department of the Army Corps of Engineers awarded a $216,113.00 Firm Fixed Price contract to Green Build USA LLC, a small business, to replace the roof on the Maintenance and Operations Building at the Maxwell Lock and Dam in East Millsboro, Pennsylvania. This contract was set aside for small businesses under NAICS code 238160 "Roofing Contractors". The original solicitation was for roof replacements on several buildings at the Maxwell Lock and Dam, with an estimated cost between...
The U.S. Army Corps of Engineers, Pittsburgh District awarded a firm fixed price purchase order valued at $0.00 to Enduren Roofing LLC of Pittsburgh, Pennsylvania. The award is for roof replacements at Emsworth Locks and Dams in Emsworth, Pennsylvania, with a period of performance through August 10, 2023. Per the original solicitation, the contractor will remove and dispose of existing roofing materials, insulation, drain covers, and conductor heads, then install a new roofing system with...
This is a $32,500 firm-fixed-price purchase order awarded by the U.S. Army Corps of Engineers (USACE) to Green Build USA LLC, a small business contractor, for the FE Walter Dam Intake Tower Roof project in White Haven, Pennsylvania. The contract has a completion date of June 21, 2024. Green Build USA LLC is a small business that provides construction, maintenance, and repair services for federal facilities. The company has received over 40 prime contracts since 2020, including multiple blanket...
This is a firm fixed-price contract awarded by the U.S. Army Corps of Engineers to Green Build USA LLC, a small business contractor, for $710,426.06 to perform roofing replacements at the Hannibal Lock and Dam facility in Ohio. The contract requires the removal and replacement of nine machinery house roofs, one middle wall pier roof, and one land wall pier roof at the site. This work is to be completed within 270 calendar days. The original contract opportunity was set aside for total small...
The U.S. Army Corps of Engineers awarded a $37,994.64 firm-fixed-price purchase order contract to Mayointhemix LLC, doing business as Mayo Elite Solutions, a minority-owned, self-certified small disadvantaged business. The contract is for the replacement of the shingle roof, gutters, and downspouts on the Lockmasters Office at Lock 4 on the Allegheny River in Natrona, Pennsylvania. This contract was a total small business set-aside, and the work includes removing and disposing of all existing...

The U.S. Army Corps of Engineers, Pittsburgh District awarded a $91,560 firm-fixed-price purchase order to Green Build USA LLC, a small business contractor, to replace the roof on the Operations Building and Cupola Roof at the C.W. Bill Young Lock and Dam in New Kensington, Pennsylvania. The contract has a period of performance of 270 calendar days from the notice to proceed. This requirement was set aside for small businesses only. The work includes removing the existing roofing materials and installing a new EPDM roofing system with tapered insulation on the Operations Building, as well as demolishing the existing shingle roof and replacing it with a new wood frame, sheathing, and shingle roof system on the Cupola Roof.