James webb space telescope (jwst) electrical cable protection nesc activity 07-062-e introduction/background: the testing described by this statement of work (SOW) is in support of a risk assessment…

Ended Purchase Order Awarded Last action

Contract number
NNL08AC47P
Awardee
Awarding agency
Obligated
$5,700

Award facts

Contract value 100% obligated
$5,700.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Not Competed under SAP · 1 offer Simplified Acquisition
Pricing
Firm Fixed Price
Place of performance
Spokane, WA 99217, USA

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope 1 $0
Original award $5,700

Description

James webb space telescope (jwst) electrical cable protection nesc activity 07-062-e introduction/background: the testing described by this statement of work (SOW) is in support of a risk assessment commissioned by the NASA engineering and safety center (nesc). The described failure analyses shall be performed on meteoroid impact sites in six ribbon cable harness segments supplied by the nesc. This device type is used in the james webb space telescope. Testing shall be performed in a manner similar to that performed in february, 2008 for the nesc by the contractor. Description of tasks to be performed: the contractor shall provide the necessary manpower and expertise to perform the following: multiple damage sites shall be inspected and analyzed by the contractor, on each of 5 harness segments, created by hypervelocity meteoroid impacts of single projectiles fragmented by an external meteoroid shield. The contractor shall provide the following inspection and analysis: 1. Perform overall optical and major surface damage area(s) scanning electron microscope (SEM) studies of damage sites selected in item 4 below. 2. Assess the condition of the harness segment electrical shield and the shield relative distance to exposed wires at major impact site(s) e.g. by fein focus x-RAY. (quantify the threat of shield shorting to wire) 3. Assess the condition of the wire at major impact site(s), (quantify the risk of severed wire) 4. Photograph a total of five major impact site damages (no more than two on any one sample) by sectioning to assess the depth of penetration and damage for the one through shot harness segment, the contractor shall provide the following information: 1. Document the condition of the electrical shield at the impact site (does the electrical shield deformation outward or inward towards the wires as a result of the hypervelocity impact) and the condition of the wires. Deliverables: failure analysis reports for the meteoroid impact sites in the harness segments as described, due no later than april 4, 2008 or two weeks after receipt of the harness for testing. Deliverables address: a. The failure analysis report deliverable shall be sent via email to the following: mitchell davis

Quick answers

Who was awarded contract NNL08AC47P?

NNL08AC47P was awarded to Hi-Rel Laboratories Inc. by Langley Research Center (National Aeronautics and Space Administration) on March 27, 2008.

How much is contract NNL08AC47P worth?

The government has obligated $5,700 on NNL08AC47P.

Was contract NNL08AC47P competed?

The extent of competition for NNL08AC47P was not competed under sap. The government received 1 offer.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award