Nixon admin site log cabin refurb - mohave county, AZ this contract requires personnel to inspect, uncover and repair any dry ROT or insect damage, prepare, stain and seal exterior log and log-sided…

Ended Purchase Order Awarded

Contract number
INL17PX01776
Awardee
Awarding agency
Obligated
$75,563

Award facts

Opportunity
Contract value 100% obligated
$75,562.50 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
Total Small Business
Competition
Competed under SAP · 4 offers Simplified Acquisition
Pricing
Firm Fixed Price
Place of performance
Fredonia, AZ 86022, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

About this award

This is a firm fixed-price purchase order contract awarded by the Bureau of Land Management (BLM) to Miracle Maintenance Inc., a self-certified small disadvantaged business, to refurbish the Nixon Administration Site log cabin located 65 miles southeast of St. George, Utah. The contract requires personnel to inspect, uncover and repair any dry rot or insect damage, and prepare, stain and seal exterior log and log-sided surfaces on the 9 buildings, 2 horseshoe pits, volleyball court, and other structures within the 7.7-acre remote administrative site. The contract has a ceiling value of $75,562.50 and a completion date of May 31, 2018. This contract was set aside for small businesses.

Description

Nixon admin site log cabin refurb - mohave county, AZ this contract requires personnel to inspect, uncover and repair any dry ROT or insect damage, prepare, stain and seal exterior log and log-sided surfaces. This is a remote admin site located 65 miles SE of ST. George, UT near the MT. Trumbull and MT. Logan wilderness areas. Travel time from ST. George, UT is estimated to be 2.5-3 hours one way on unimproved county maintained dirt/gravel roads, depending on the size and number of vehicles and trailers/equipment in tow. The site is approximately 7.7 acres and contains 9 buildings, 2 horseshoe pits, a volleyball court, 2 camp units with fire rings, 1 camp unit with utility hookups, a group picnic unit with outdoor grills and tables, an off-grid solar system with batteries and backup generator and electrical distribution system, 3 septic systems, 3 sanitary sewer collection systems, 3 parking lots, a fence, a potable water system supplied from a spring (nixon spring) on MT. Trumbull, 220,000 gallon water storage tanks, a communications tower, a propane distribution system and site roads. The conference center and research cabin are full log construction. The fire station and its garage, plus the research cabin's storage shed are log-sided. There is also a log ramada. Project activities will occur in and around the log ramada and full log and log-sided structures within the fenced and gated admin site. A majority of the exposed log and log-sided surfaces are weathered and in need of RE-sealing. The purpose of this project is to restore, prepare and preserve all exposed log and log-sided surfaces at nixon ad min site to prevent damage and maximize the useful life of the buildings.

Quick answers

Who was awarded contract INL17PX01776?

INL17PX01776 was awarded to Miracle Maintenance, Inc. by Arizona Region (Bureau of Land Management) on September 20, 2017.

How much is contract INL17PX01776 worth?

The government has obligated $75,563 on INL17PX01776.

Was contract INL17PX01776 competed?

The extent of competition for INL17PX01776 was competed under sap. The government received 4 offers. It was set aside: Total Small Business.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award