AIT town center repair: per quote dated 4 sept 2018, 4 WKS lead time, 3 WKS to complete, 90 days for custom acrylic covers 1. Membrane repair: a fabric patch will be sewn into place over the…

Ended Purchase Order Awarded Last action

Contract number
FA302018P0127
Awardee
Awarding agency
Obligated
$91,147

Award facts

Opportunity
Contract value 100% obligated
$91,147.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Funding agency
Air Force Department of Defense
Set-aside
8(a) Sole Source
Competition
Not Competed under SAP · 1 offer Simplified Acquisition
Pricing
Firm Fixed Price
Place of performance
Sheppard AFB, TX 76311, USA

Award details come from SAM.gov/FPDS.

About this award

This is a firm fixed-price purchase order awarded by the U.S. Air Force to Warfeather, LLC, a small, minority-owned, veteran-owned, and Native American-owned business based in Coweta, Oklahoma. The $91,147.00 contract is for the repair and maintenance of the AIT Town Center structure at Sheppard Air Force Base in Texas. The work includes membrane repair, main mast pin modifications, replacement of steel carrier plates with turnbuckles, replacement of aluminum fabric hanger straps, installation of new safety pins, and the fabrication, delivery, and installation of custom acrylic covers. The contract has an ultimate completion date of December 31, 2018 and was awarded on a sole-source basis under the Small Business Administration's 8(a) program. Warfeather is an experienced federal contractor, holding multiple Indefinite Delivery Vehicles (IDVs) with various agencies for construction, maintenance, and upgrade services.

Description

AIT town center repair: per quote dated 4 sept 2018, 4 WKS lead time, 3 WKS to complete, 90 days for custom acrylic covers 1. Membrane repair: a fabric patch will be sewn into place over the existing membrane. To accomplish this the structure must have the tension relieved at multiple points and be pretensioned to original specifications after completion of the patch. 2. Main mast pin modifications: weld machined plates to secure pin in lieu of bolted connections. Plates will be welded to pin only allowing intended movement of the structure. 3. Carrier plate replacement: the EOR recommends removal of the steel carrier plates and replacing them with 1X12 jaw-jaw style turnbuckles. Turnbuckles are the current standard construction method for these structures and should be updated. The new turnbuckles will have bolted connections with lock nuts installed in lieu of pins. 4. Replacement of aluminum fabric hanger straps as required. 5. Installation of new safety pins at every connection after RE-tensioning of structure. 6. Provide a letter from the EOR stating all repairs have been made IAW the manufacturers specifications. 7. Annual inspection for the following year and minor adjustments as needed. 8. Custom acrylic covers masthead enclosures to be fabricated, delivered, and installed with structure.

Quick answers

Who was awarded contract FA302018P0127?

FA302018P0127 was awarded to Warfeather, LLC by Air Education and Training Command (Air Force) on September 20, 2018.

How much is contract FA302018P0127 worth?

The government has obligated $91,147 on FA302018P0127.

Which agency awarded contract FA302018P0127?

Air Education and Training Command (Air Force) awarded FA302018P0127, with funding from Air Force (Department of Defense).

Was contract FA302018P0127 competed?

The extent of competition for FA302018P0127 was not competed under sap. The government received 1 offer. It was set aside: 8(a) Sole Source.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award