This firm fixed price purchase order was awarded by the Department of the Army Corps of Engineers to Sanford Federal, Inc. doing business as Far Group to provide lift station repair services at the Williston Resource Office in Williston, North Dakota. The contractor will remove and dispose of old lift station components and install new equipment, including a pump, guide rail system, lifting chain, hatch, vent pipe, valves, pipe, floats and control panel. The solicitation called for removal of...
The National Park Service Southeast Region awarded a $339,000 firm-fixed price construction contract to Utility Service Co. Inc. to replace failing components at Fort Pickens West Lift Station in Gulf Islands National Seashore, Pensacola Beach, Florida. Per the solicitation, the contractor will demolish an existing septic tank, odor control system, and bioxide tank, install a new fiberglass wet well, tie into force mains, and replace the perimeter fence. This total small business set-aside...
The Department of the Navy Naval Supply Systems Command awarded a $690,000 firm fixed price purchase order to Environmental Systems LLC for repair and modification services for a pumping unit, sewage. The solicitation sought proposals for repair and modification of the unit to meet quality assurance requirements and inspection standards, with pricing, repair turnaround time not to exceed 60 days, testing fees if deemed beyond repair, and price reductions for late delivery. The place of...
The Department of the Army Corps of Engineers awarded a $32,900 firm fixed price purchase order to K Franck Enterprises Inc. for the removal and replacement of grinder pumps and piping at a lift station located in Louisville, Kentucky. Per the original solicitation, the contractor will repair the Septic Lift Station at the specified address in accordance with the attached scope of work, furnishing all necessary labor, materials, supplies, tools and equipment. The contract is set aside for...
<p>The U.S. Air Mobility Command awarded a $14,890.00 firm fixed-price purchase order to Carolina Pumpworks LLC for the delivery of GRUNDFOS LIFT STATION PUMP at Joint Base Charleston in North Charleston, South Carolina. The contract has a performance period ending on May 17, 2024 and does not have a set-aside designation.</p>
<p>This is a Firm Fixed Price delivery order awarded by the National Oceanic and Atmospheric Administration (NOAA), a civilian agency, to Lam Services, LLC, an 8(a) certified small business. The contract is for the removal and replacement of two hot water heaters at the Hollings Marine Laboratory in Charleston, South Carolina. The contract has a ceiling value of $92,584.00 and a completion date of September 30, 2016.</p>
The Department of the Navy Naval Supply Systems Command awarded a $575,000 firm fixed price purchase order to Environmental Systems LLC for pumping unit, sewage repair/modification services. The original solicitation sought repair services for a pumping unit, sewage to meet original manufacturer specifications within 37 days turnaround time, and required government source inspection at the contractor's facility. Environmental Systems LLC will perform the repairs at its Stevensville, Maryland...
The Department of the Navy Naval Facilities Engineering Command awarded a $184,873 delivery order contract to Up-Side Management Co., doing business as Crystal Coast Cleaning, to perform emergency main lift station sewer line repairs in New Orleans, Louisiana. The firm fixed price order is being funded by the Navy to provide repair services for wastewater infrastructure at a facility in New Orleans, with work scheduled to be completed by mid-August 2023. Up-Side Management Co. will serve as...
The Department of Homeland Security United States Coast Guard awarded a $22,566.03 firm fixed-price purchase order to Coventina Water, LLC to replace the macerating pump at the main sewage lift station located at Coast Guard Base Miami Beach in Miami, Florida. The solicitation sought replacement of the pump in accordance with the scope of work, requiring the contractor to provide all labor, materials, and equipment to complete the project from June 19, 2023 through September 30, 2023. The...
The General Services Administration Public Buildings Service National Capital Region awarded a firm fixed price delivery order for $3,851.69 to Chimes District of Columbia Inc. to remove a failed sewage ejector pump and its faulty seal at a Washington D.C. facility. The contractor will clean the vault area and replace the pump's mechanical seal and components by September 29, 2023. No set-aside designation was used for this award to remove and replace a failed pump for the GSA's National Capital...