Purchase Order DJBTHAIVPZ400044NH
Award Date 12/10/08
Potential Completion Date 12/22/08
Potential Value $23K
Funding Federal Agency
Not listed Contracting Federal Agency
Awardee
Ultimate Awardee
Not listed NAICS Category
PSC Category
Not listed Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
- Not listed
Extent Competed
Not Competed
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Terre Haute, IN, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
Not listed
Legislative Mandate
Not listed National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The U.S. Army Corps of Engineers awarded a $32.4 million firm fixed-price definitive contract to Forgen LLC on March 15, 2022, for bank stabilization and erosion repair work along the Lower American River in Sacramento, California, with completion targeted for April 9, 2023. The project addresses erosion control along approximately 5,500 feet of riverbank through placement of riprap and bedding material, installation of instream structures, erosion control measures, and vegetation plantings....
- The U.S. Army Corps of Engineers (USACE) awarded a $26.3 million firm fixed-price definitive contract to Tktmj, Inc., a certified HUBZone small business, for emergency bank stabilization work on the Ouachita River in Ouachita Parish, Louisiana. The contract was awarded on August 27, 2025, with an ultimate completion date of August 26, 2028, and is designated as a Total Small Business set-aside. The work encompasses stabilization activities at five sites (Sites 2, 11, 12, 16, and 22) near Monroe,...
- This is a firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Eagle Eye Electric LLC, a subsidiary of the Alaskan Native Corporation Bering Straits Native Corporation, for a bank stabilization project along 4,000 linear feet of the Big River in Desoto, Missouri. The $2,487,053.80 contract is for services including excavation, grading, embankment construction, and biotechnical bank stabilization. The project aims to reduce terrestrial lead contamination...
- The Department of the Army Corps of Engineers awarded a $378,630 firm fixed price contract to Fenton Construction Inc. to stabilize approximately 1,000 linear feet of riverbank along the Missouri River in Yankton County, South Dakota. The solicitation sought placement of approximately 2,500 tons of riprap to address erosion concerns. Awarded under a total small business set aside, the contract calls for Fenton Construction to deliver the requested bank stabilization services between April 2021...
- The U.S. Army Corps of Engineers Engineering District Sacramento awarded a $3.7 million firm fixed price contract to Camenzind Dutra JV LLC to address erosion along 1,150 feet of the Sacramento River. The contract was awarded under Solicitation Sacramento River Erosion Contract 1 to install erosion protection including clearing, quarry stone placement, soil installation, in-stream wood placement, grass seeding, fencing and signage. The work will be performed in North Highlands, California from...
- The U.S. Army Corps of Engineers Engineering District Sacramento awarded Nordic Industries, Inc. a $44 million firm-fixed price contract to construct approximately 1.8 miles of various types of seepage cutoff walls along segments of the Sacramento River East Levee in Sacramento, California. Under the terms of the Sacramento River East Levee Contract 2, Nordic Industries will perform work including constructing soil-bentonite, slag cement-cement-bentonite, deep mix method, and jet grout walls...
- This contract was awarded by the U.S. Department of Agriculture's (USDA) Natural Resources Conservation Service (NRCS) Northeast Region to Mountaineer Infrastructure LLC, a small business contractor, for streambank stabilization work in Harman, West Virginia. The $186,541.00 firm-fixed-price contract was awarded under the USDA's Emergency Watershed Protection Program to address damage from severe storms that impacted the area on June 30, 2019. The work involves stabilizing a section of...
- Cornerstone Engineering, Inc. was awarded a $988,683 firm fixed price definitive contract by the U.S. Army Corps of Engineers Louisville District to perform tailwater bank stabilization work in Glasgow, Kentucky. The contract was awarded under the Department of Defense and specifically supports the Army Corps of Engineers' civil works mission. No subcontractors or set aside designations were identified. The one-year, three-month contract is expected to be completed by January 2022 and will...
- This definitive contract from the Department of the Army Corps of Engineers Omaha District awards $856,862.50 to Steve Lehrkamp Enterprises Inc. to provide bank stabilization at the Oahe Dam Outlet Works Channel in Fort Pierre, South Dakota. The scope of work includes furnishing approximately 2,000 cubic yards of earth embankment, 5,000 square yards of geotextile, and 10,000 tons of riprap stone protection, as well as incidental work such as temporary access roads. The solicitation was set aside...
- This contract was awarded by the U.S. Department of Agriculture (USDA) National Resources Conservation Service (NRCS) Northeast Region to Select Excavating Services LLC, a self-certified small disadvantaged business, for streambank stabilization work under the Emergency Watershed Protection (EWP) Program. The $155,887.09 firm-fixed price contract was set aside for small businesses and involves stabilizing a section of streambank along Horsecamp Run in Harman, West Virginia that was impacted by...
EMERGENCY RIVERBANK STABILIZATION
Posted 12/10/08