<p>This is a $64,705.54 firm-fixed-price definitive contract awarded by the Operations Center East, a civilian U.S. government agency, to Stibbe Excavating And Grading, Inc. for the COLDWATER CREEK CULVERT REPLACEMENT project under the COLDWATER CREEK AT FR2404 CULVERT REPLACEMENT major program. The contract has an ultimate completion date of January 3, 2011 and was awarded on May 25, 2010. This contract does not have a set-aside designation.</p>
This is a firm fixed-price federal contract awarded by the U.S. Department of Agriculture Forest Service to M R Construction, a small disadvantaged and HUBZone certified business, to replace a culvert on Forest Service road 40N39 that crosses Kelly Gulch in the Klamath National Forest near Etna, California. The contract, valued at $475,417.50, involves installing a 15-foot span by 6-foot 7-inch rise multi-plate arch culvert with a simulated streambed to allow for aquatic organism passage. This...
The Department of Agriculture Forest Service awarded a $274,427 firm fixed price definitive contract to Cp&G Construction LLC, doing business as Cp&G, to complete construction of Forest Service Road 404 Cane Creek Culvert Replacement in Georgetown, South Carolina. The solicitation sought replacement of an existing 10'9" x 6'7" x 47' culvert with a new 19' x 8'2" x 46' structural plate aluminum arch culvert. With a period of performance of 180 calendar days, the...
This delivery order, awarded under the Department of Agriculture Forest Service R9-Eastern Region Roads and General Construction Multiple Award IDIQ, calls for the replacement of an existing failing stream crossing with a new larger culvert in Lily Pad Creek. Snow Country Contracting Inc., an SBA-certified HUBZone firm, will replace the culvert for $114,016.98 by May 15, 2022. The work supports the Forest Service's efforts to improve infrastructure and protect water quality in the Great Lakes...
This is a $747,721.55 firm-fixed price definitive contract awarded by the U.S. Department of Agriculture (USDA) Forest Service to Snow Country Contracting Inc., an SBA-certified HUBZone small business. The contract is to replace a culvert on Sidnaw Creek within the Ottawa National Forest in Michigan. The work involves surveying the site, removing an existing 12' x 8' corrugated metal pipe culvert, and installing a new 20' x 10' x 64' precast concrete box culvert to improve aquatic organism...
This is a firm fixed-price delivery order contract awarded by the U.S. Department of Agriculture (USDA) Forest Service to Paraclete Maintenance & Design, LLC, a minority-owned, small disadvantaged, woman-owned, veteran-owned, and Asian-Pacific American-owned limited liability company based in Woodworth, Louisiana. The contract, valued at $94,604.00, is for the excavation and replacement of a 36-inch reinforced concrete culvert on National Forest System Road 145. Paraclete Maintenance &...
This firm-fixed-price delivery order, awarded to Snow Country Contracting Inc., a certified HUBZone small business, is for the replacement of culverts on two forest routes in Wisconsin to improve aquatic organism passage. The $301,345.75 contract was issued by the U.S. Forest Service's Eastern Region under a multiple-award IDIQ vehicle for roads and general construction services. The work involves replacing undersized culverts with concrete box structures on Forest Routes 2174 and 2452A to...
This is a $60,056,297.67 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers to Archer Western Construction LLC for the construction of the Deep Creek Bridge Replacement project in Chesapeake, Virginia. The contract does not have a set-aside designation. The project involves replacing an existing two-lane bascule bridge with a new five-lane bascule bridge over the Dismal Swamp Canal portion of the Atlantic Intracoastal Waterway. The contract requires the construction of deep...
This is a firm fixed-price contract awarded by the U.S. Department of Agriculture Forest Service to Neil H. Daniels, Inc., a small business concern, for the replacement of two culverts on Forest Road 10 in the Green Mountain National Forest in Vermont. The contract, valued at $1,307,180.00, includes the removal of existing structures and the installation of new metal and precast culverts, as well as associated site work such as backfilling, embankment construction, and guardrail installation....
This firm fixed price contract valued at two hundred eighty-nine thousand six hundred nine dollars and ninety cents ($289,609.90) was awarded by the United States Department of Agriculture Forest Service Rocky Mountain Region to RPM Excavating & Pumping LLC, doing business as RPM Excavating & Pumping, to replace a culvert on Red Sandstone Creek within the White River National Forest in Glenwood Springs, Colorado. The solicitation sought proposals to remove an existing sixty-two foot...