The Air Force issued a purchase order to Walden Consulting, LLC on September 22, 2026, for six replacement turbopumps for mass spectrometers, valued at $73,213.20, under a Total Small Business set-aside. Performance concludes November 30, 2026.
Work is performed in Orlando, Florida. The order requires three pump configurations (67 L/s, 260 L/s, and 685 L/s units) fully interoperable with Ametek Cameca secondary ion mass spectrometers, each including integrated controller with RS-485 serial communication, power cables, air cooling, and operations manual. The solicitation, posted August 18 with due date September 21, was amended on September 17 to extend delivery to 20 weeks from award.