Purchase Order 1333ND22PNB730603

Award Date 10/31/22
Potential Completion Date 4/30/23
Potential Value $273K
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Competed under SAP
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Rockville, MD 20852, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
8
Legislative Mandate
Employment Eligibility Verification
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a $237,810 firm-fixed price and labor hour purchase order awarded by the National Institute of Standards and Technology (NIST) to Fluency Architecture & Design, PLLC, a small disadvantaged business, to develop a 3D Building Information Model (BIM) of the pre-collapse Champlain Towers South condominium in Surfside, Florida. The BIM model will support NIST's technical investigation into the partial collapse of the building under the National Construction Safety Team Act. The 12-month...
This is a $897,000 firm fixed price purchase order awarded by the National Institute of Standards and Technology (NIST) to Geocomp, Inc. for geotechnical investigation support services related to the Champlain Towers South building collapse in Surfside, Florida. The 12-month contract does not have a small business set-aside and requires the contractor to provide project management, site foundation history and design analysis, a geotechnical interpretive report, data for 3-D visualization...
The National Institute of Standards and Technology (NIST) awarded a firm-fixed-price purchase order worth $428,744.00 to Tourney Consulting Group LLC, a small business, to provide corrosion and concrete durability testing services in support of the investigation into the 2021 collapse of the Champlain Towers South condominium in Surfside, Florida. The contract scope includes conducting corrosion potential and rate measurements, concrete transport property testing, accelerated corrosion...
This is a firm fixed price purchase order awarded by the National Institute of Standards and Technology (NIST) to the University of Washington to conduct structural testing of slab-column and slab-beam-column connections for NIST's investigation into the 2021 collapse of the Champlain Towers South condominium in Surfside, Florida. The $1,271,803 contract requires the University of Washington to design, construct, instrument, load, and report on nine full-scale reinforced concrete slab-column...
This $44,381 firm-fixed-price purchase order was awarded by the National Institute of Standards and Technology (NIST) to the University of Florida (UF) Division of Sponsored Research for engineering services to support NIST's investigation into the Champlain Towers South collapse. The contract requires UF to conduct mechanical property tests on concrete cylinders provided by NIST, create new concrete cylinders from two mixtures, and perform additional tests to assess the strength of the material...
This firm-fixed price purchase order for $1,535,195.00 was awarded by the National Institute of Standards and Technology (NIST) to Florida International University (FIU) to provide technical support services for the National Construction Safety Team's (NCST) evidence preservation project investigating the collapse of the Champlain Towers South in Florida. The contract supports subject matter expert services from Dr. Nazife Emel Ganapati, who was appointed to the NCST investigation team for her...
This is a firm fixed-price purchase order awarded by the National Institute of Standards and Technology (NIST) to the University of Illinois at Urbana-Champaign to provide geotechnical support services for the National Construction Safety Team (NCST) investigation of the 2021 Champlain Towers building collapse in Surfside, Florida. The award has a ceiling value of $991,289.50 and a period of performance through September 30, 2026. This contract is not set aside. The University of Illinois was...
<p>The National Institute of Standards and Technology (NIST) awarded a $242,600 firm-fixed-price purchase order to J.R. Harris and Company, a self-certified small disadvantaged business, to provide investigation support services related to the Champlain Towers South partial collapse in Denver, Colorado. The contract has an ultimate completion date of February 2, 2026. This contract award is not associated with a larger contract vehicle and does not have a set-aside designation.</p>
This is a $92,105.41 firm fixed price delivery order contract awarded by the Department of Commerce's National Institute of Standards and Technology (NIST) to Applied Research Associates, Inc. (ARA). The contract is for the collection of invasive testing data to support NIST's Champlain Towers South National Construction Safety Team (NCST) investigation. No set-aside designation was specified. ARA is the prime contractor and has subcontracted a portion of the work to Wiss, Janney, Elstner...
TRE Altamira Inc., a Canadian company specializing in interferometric synthetic aperture radar (InSAR) data acquisition, processing, and reporting, has been awarded a firm fixed price purchase order valued at one hundred forty-nine thousand four hundred dollars ($149,400) by the National Institute of Standards and Technology (NIST). The award is to support NIST's investigation into the 2021 collapse of the Champlain Towers South condominium in Surfside, Florida. Under the contract, TRE...

The Department of Commerce's National Institute of Standards and Technology awarded Cagley & Associates Inc. a $272,800 firm-fixed price purchase order to provide code checks support services for the Champlain Towers South building that collapsed in Surfside, Florida. The analyses will evaluate the building's design under current codes and standards as well as those in effect when originally designed from 1979 to 1980. There was no set-aside designation for this procurement. Cagley & Associates will perform structural analyses and design checks of the Champlain Towers South building to evaluate its design under modern building codes and those in effect at the time of original construction. The work will aid NIST's investigation into the technical causes of the collapse.