The Forest Products Laboratory awarded a purchase order to USA Construction Co for $19,700 to replace a fire hydrant damaged by snow removal at its Madison, Wisconsin facility, with award dated September 21, 2026. This is a Total Small Business Set-Aside. Work is performed at Madison, WI 53726. The contractor furnishes and installs a new Waterous Pacer 5-1/4" fire hydrant compliant with City of Madison specifications, including excavation, hydro vac labor, standpipe and breakaway linkage replacement below the frost line, and site restoration with clear stone backfill, topsoil, grass seed, and straw blankets. Construction is limited to 6 a.m. to 6 p.m., Monday through Friday. Performance is due by December 21, 2026. Davis-Bacon prevailing wage rates apply per Dane County General Decision WI20260005 (effective May 18, 2026), with hourly rates ranging from $13.89 to $65.17 base wage plus fringe benefits of $3.28 to $38.44. The originating solicitation (posted August 27, 2026) required quotations by September 10, 2026.