This is a firm fixed price definitive contract awarded by the Operations Center Southwest, a civilian agency, to JC Palomar Construction, Inc., an 8(a) sole source small disadvantaged business concern. The $76,642.18 contract is for the removal of a 10,000 gallon reinforced concrete potable water storage tank and replacement with a 14,000 gallon bolted steel water tank at the Vista Grande Station. The work includes construction of the tank foundation, supply and installation of the tank and...
WCA Construction, LLC was awarded a definitive contract valued at approximately $2 million by the National Park Service to replace the water tank at Mesa Verde National Park in Colorado. As a sole source 8(a) set aside awarded under the Department of the Interior, the firm fixed price contract calls for WCA Construction to demolish the existing Chapin Mesa water tank and replace it with a new tank by March 2022. The prime contractor is a subsidiary of Weeminuche Construction Authority and will...
The Department of the Interior Bureau of Reclamation awarded a $551,814 firm fixed price purchase order to Pipestone Equipment, LLC. The purchase order is to provide three new surge protection pressure vessel tanks and appurtenances to expand the Bureau's 242 well field located in Golden, Colorado. Per the Special Notice solicitation, the Bureau required additional surge tanks that are consistent with their existing Charlatte America brand system to properly operate and communicate with other...
This firm fixed-price delivery order contract, valued at $1,004,439.55, was awarded by the National Park Service Intermountain Region to Ridgway Valley Enterprises Inc., a small business commercial general contractor. The contract is for the replacement of the Rio Grande Village water tank and water line at Big Bend National Park in Texas. The work includes the installation of approximately 1,000 linear feet of 4-inch and 6-inch HDPE water lines, demolition of a 400,000-gallon steel water...
The USDA Forest Service awarded a firm fixed price definitive contract valued at $XXX,XXX to Construction Solutions Group, LLC. The contract calls for the contractor to remove two existing 5,000 gallon fiberglass water tanks, accessories, and associated drain and supply lines at the Mimbres Administrative Site in Silver City, New Mexico. The contractor will then install a new 11,000 gallon steel water tank, required foundation, safety features, and connect new water valves and lines to the...
<p>This is a $5,062.20 firm fixed-price definitive contract awarded by the U.S. Forest Service's Region 8 - Southern Region to Burleson Plumbing And Heating Company, a self-certified small disadvantaged business, to install and test a backflow preventer on a new water line supplying potable water at the Black Mountain Campground dump station. The contract has a completion date of July 31, 2015 and does not have a set-aside designation.</p>
This is a $193,521.02 firm-fixed-price definitive contract awarded by the Department of the Interior Fish and Wildlife Service Region 2 to Texas Plumbing Solutions LLC, a small business subchapter S corporation, to replace water valves at the San Marcos Pond Yard in San Marcos, Texas. The contract was set aside for small businesses. Texas Plumbing Solutions has experience providing grounds maintenance, plumbing repair, and HVAC services to various federal agencies, including the Department of...
This federal contract award is for the replacement of Tank 820 at the Naval Station Great Bridge (NSGB) facility in Denver, Colorado. The $1,372,247.00 firm fixed-price delivery order was awarded to the Rq-Aecom JV prime contractor by the U.S. Navy Installations Command (NAVFAC). The prime contractor will use subcontractors Consolidated Pipe & Supply Co Inc. (DBA Vulcan Plastics) to provide pipe spools and fittings, and Fluid Solutions LLC to deliver a 201,880 gallon glass fused steel bolted...
The National Park Service Pacific West Region awarded a $370,046 firm fixed-price contract to Bad Quail Bad Quail Division for the removal and replacement of a septic tank at Pinnacles National Park in San Benito County, California. The contract calls for the contractor to demolish an existing 1,500 gallon concrete septic tank and associated infrastructure, and to install a new 15,000 gallon fiberglass holding tank to service campground restrooms at the Eastside Campground. Funded by the...
This firm-fixed-price definitive contract was awarded by the U.S. Geological Survey (USGS), a civilian agency within the Department of the Interior, to Rountree Plumbing And Heating Inc. for $25,241.00. The contract is for water conservation plumbing and restroom fixtures replacement at the USGS facility in Menlo Park, California, and was funded through the American Recovery and Reinvestment Act (ARRA). The contract does not have a set-aside designation and is scheduled for completion by...