Purchase Order 1240BK25P0044
- Not listed
- This firm fixed-price purchase order was awarded by the U.S. Department of Agriculture's Region 6 - Pacific Northwest Region to Permacold Engineering, Inc., a for-profit Subchapter S Corporation based in Portland, Oregon. The $18,760.69 contract is for the supply of parts and the rebuilding of an ammonia compressor. The contract has no set-aside designation and is scheduled for completion by November 30, 2024. Permacold Engineering, Inc. specializes in industrial refrigeration equipment and...
- This federal contract award, AG04N7P120051, was issued by the Region 6 - Pacific Northwest Region of the U.S. government to the prime contractor Permacold Engineering, Inc. The $19,940.00 firm fixed price contract is for the service and maintenance of two MYCOM W-series reciprocating compressors located at a facility in Central Point, Oregon. The contract requires Permacold Engineering to provide all labor, parts, and tools necessary to replace and install components on the compressors. This...
- This is a firm fixed-price purchase order contract awarded by the U.S. Forest Service, Pacific Northwest Region, to Permacold Engineering, Inc. for a refrigeration system upgrade project. The contract has a ceiling value of $70,908.00 and was awarded on June 16, 2016, with a completion date of September 30, 2016. Permacold Engineering is a for-profit, Subchapter S Corporation that specializes in energy-efficient and environmentally friendly industrial refrigeration systems. The contract was...
- This federal contract award, valued at $7,038.00, was issued by the U.S. Forest Service, a civilian agency within the Department of Agriculture, to Permacold Engineering, Inc., a prime contractor. The contract was for the repair of an emergency cooler at the John H. Shenk Nursery (JHSN), located in Central Point, Oregon. The repair involved overhauling a MYCOM compressor that had failed. This was a Firm Fixed Price purchase order, and the contract did not have a set-aside designation....
- This is a firm fixed-price purchase order contract awarded by the U.S. government to Permacold Engineering, Inc., a for-profit Subchapter S Corporation based in Portland, Oregon. The contract is for the replacement of a coil for the #2 air conditioning air handling unit at Walnut facility, with a ceiling value of $3,143.75 and a completion date of June 22, 2005. The contract was not set aside under any socioeconomic programs. Permacold Engineering, Inc. has a demonstrated track record of...
- The U.S. Army Corps of Engineers (USACE) awarded a $34,565.37 firm fixed-price purchase order contract to Permacold Engineering, Inc. for the replacement of the port side 70-ton Bitzer screw air conditioning compressor on the Dredge Essayons, which is home ported in Portland, Oregon. The contract is a sole-source award under the authority of 10 U.S.C. 2304(c)(1) and FAR 13.106-1(b), as Permacold Engineering was the previous contractor that installed and commissioned the original compressor,...
- This federal contract award to Permacold Engineering, Inc. is for emergency cooler maintenance inspection services at a facility operated by the U.S. Forest Service. The contract has a firm fixed price of $3,017.20 and was not set aside. Permacold Engineering is a small business that specializes in industrial refrigeration equipment and services, and has previously provided similar services to federal agencies such as the Army Corps of Engineers. The contract was awarded by the U.S. Forest...
- This firm fixed-price purchase order was awarded by the Bureau of Reclamation, a civilian agency within the U.S. Department of the Interior, to Northwest Pump & Equipment Co., a small business subchapter S corporation based in Portland, Oregon. The contract is for the purchase, delivery, and installation of Canyon Ferry Sullair station service air compressor heat exchanger conversion kits from water-cooled to air-cooled, as well as the reprogramming and recommissioning of the air compressors...
- The U.S. Department of Agriculture's Agricultural Research Service has awarded a $112,877.07 firm fixed-price purchase order to The Sherman Engineering Co, a small disadvantaged business based in Pennsylvania, for the replacement of the main air compressor at the Eastern Regional Research Center in Wyndmoor, PA. The contract, awarded on September 24, 2025, is designated as a Total Small Business set-aside and requires completion by December 23, 2025. The scope of work includes procurement and...
- <p>The U.S. Department of Agriculture's Agricultural Research Service awarded a $24,932.00 Firm Fixed Price Purchase Order to Yakima Mechanical, Inc. for the replacement of an air handler 2 R22 screw compressor #1. This small business set-aside contract has an ultimate completion date of August 30, 2024. The place of performance is Wapato, WA 98951.</p>
The U.S. Department of Agriculture's Region 6 - Pacific Northwest Region awarded a firm fixed-price purchase order valued at $18,064.96 to Permacold Engineering, Inc. for the supply of parts and rebuild of an ammonia compressor. The contract, awarded on August 19, 2025, with an ultimate completion date of November 30, 2025, represents a non-set-aside procurement. Work will be performed in Portland, Oregon, where the contractor is based. Permacold Engineering, a Subchapter S Corporation specializing in industrial refrigeration equipment and services, brings substantial expertise in compressor repair and replacement for federal agencies throughout the Pacific Northwest. Permacold has established a track record of providing specialized technical solutions to federal customers, particularly the U.S. Army Corps of Engineers and USDA agencies, with prior contract awards ranging from approximately $5,900 to $34,600. The company holds sole-source contract authority for certain specialized work, including as the only Bitzer-approved contractor for specific compressor applications. With an active SAM.gov registration through March 2026, Permacold is well-positioned to deliver the precision technical services required for this ammonia compressor rebuild within the specified performance period.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $18.1k | 8/22/25 |