Delivery Order W91QF518G0001-W91QF519F0096
Award Date 8/29/19
Potential Completion Date 1/21/20
Potential Value $58K
Funding Federal Agency
Contracting Federal Agency
Awardee
Ultimate Awardee
Not listed Set-Aside Type
8(a) Sole Source
Federal Contract Vehicle
- Not listed
Extent Competed
Not Available for Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Petersburg, VA 23801, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This firm fixed price purchase order was awarded by the Department of the Army Corps of Engineers to Temple & Temple Excavating & Paving Inc., doing business as Quality Concrete, for $144,240. The contract involves the rehabilitation of an 84-inch diameter, 75-foot long culvert located near Burnsville Dam in Burnsville, West Virginia. Per the solicitation, the contractor will line the deteriorated culvert using the slip lining method and will provide all necessary labor, materials and...
- The Department of Agriculture Forest Service awarded a $152,710 firm fixed price contract to Rock-N-Road Construction, Inc. to replace a 48-inch diameter corrugated metal pipe culvert on Road 6265 at milepost 0.313 in Wrangell, Alaska. The new aquatic organism passage will consist of a 142-inch by 91-inch by 66-foot corrugated metal pipe arch with stream simulation rock, streambanks, and stream. The contract was awarded under the agency's Blanket Purchase Agreement call and has a total small...
- The Department of the Army Corps of Engineers awarded a $443,930 firm fixed price contract to Tag Contracting, Inc. to complete the Warrior Creek Park Roadway Repair project in Wilkesboro, North Carolina. The solicitation sought a contractor to remove a collapsed 24-inch corrugated metal pipe culvert approximately 25 feet below a roadway that is 130 linear feet in length, and replace it with a similarly sized reinforced concrete pipe. The contractor will also perform associated work including...
- The U.S. Department of Agriculture Forest Service awarded a $98,117.80 firm fixed price delivery order contract to Jack Bowen Excavating of Mt Tabor, Vermont. The contract calls for the replacement of an existing five-foot diameter culvert with a new seven-foot, three-inch wide by five-foot, three-inch high by seventy-eight-foot long aluminized steel pipe arch culvert. Additional work includes removal of an existing temporary bridge and its relocation. The contract was awarded on April 26,...
- This definitive contract was awarded by the Department of Transportation Federal Highway Administration to Meridian Engineering Co for $860,324.40 to complete aquatic organism passage improvements on Stone Creek in Alpine, Arizona. The solicitation sought a contractor to replace two deteriorated culverts with a larger 14'2" x 9'10" structural plate pipe arch culvert approximately 48 feet in length, including concrete headwalls and wingwalls as well as a 100-foot-long low water...
- The U.S. Army Corps of Engineers (USACE) awarded a $203,380 firm fixed-price purchase order contract to Temple & Temple Excavating & Paving Inc., operating as Quality Concrete, to reline culverts at Patoka Lake in Dubois, Indiana. This small business set-aside contract was issued on August 12, 2024 and has a completion date of January 17, 2025. The contractor will provide all personnel, equipment, supplies, and materials necessary to plan, manage, and execute the culvert relining work in...
- Walters Construction Company, Incorporated, a small disadvantaged business based in Laurel, Mississippi, was awarded a delivery order valued at $148,297.65 by the U.S. Department of Agriculture Forest Service's Southern Region under the Great American Outdoors Act (GAOA) program. The project involves the removal and replacement of a failed 24-foot by 50-foot, 16-gauge polymer-coated corrugated metal culvert (PCCMP) on Road 232A at the Turkey Fork Recreation Area. The existing culvert has...
- Rickabaugh Construction LLC was awarded a $242,000 firm fixed price delivery order against the Department of the Interior Bureau of Land Management's Horizontal Repair and Construction Services Multiple Award Task Order Contract (MATOC) to complete the Sandy Creek Culvert Replacement project in North Bend, Oregon. Under this delivery order issued by the BLM Oregon-Washington office, Rickabaugh Construction will replace an existing culvert as part of the agency's infrastructure maintenance and...
- This firm fixed price call against a blanket purchase agreement (BPA) was awarded by the U.S. Department of Agriculture Forest Service Pacific Northwest Region to Walker's Excavation Incorporated, doing business as Walkers Excavation Inc., for $28,198 to replace a culvert located in Tiller, Oregon. The contract is set aside for total small businesses and has an anticipated completion date of October 31, 2022. Under the terms of the award, the prime contractor will deliver the requested culvert...
- This firm-fixed-price delivery order, awarded to Snow Country Contracting Inc., a certified HUBZone small business, is for the replacement of culverts on two forest routes in Wisconsin to improve aquatic organism passage. The $301,345.75 contract was issued by the U.S. Forest Service's Eastern Region under a multiple-award IDIQ vehicle for roads and general construction services. The work involves replacing undersized culverts with concrete box structures on Forest Routes 2174 and 2452A to...
- W91QF518G0001Basic Ordering Agreement
- W91QF518G0001-W91QF519F0096Delivery Order
REPAIR CULVERT TA-1
Posted 8/14/19
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00002 | Other Administrative Action | $0 | 11/25/20 | |
| P00001 | Funding Only Action | $3.1k | 11/21/19 | |
| Not listed | Not listed | $55.0k | 8/14/19 |