Wright-patterson AFB - bldg. Renovation

Ended Awarded Last action

Contract number
0007
Awardee
Awarding agency
Obligated
$5,526,792

Award facts

Opportunity
Contract value 100% obligated
$5,526,792.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z299 Maint, Rep/Alter/All Other
Set-aside
Service-Disabled Veteran-Owned Small Business
Competition
Full and Open Competition after exclusion of sources · 3 offers Multiple Award, Fair Opportunity
Pricing
Firm Fixed Price
Place of performance
WPAFB, OH 45433, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order 2D $2,039
Supplemental Agreement for work within scope 2C · Case 037 provide service platform for newly installed cooling tower, renovate building 1 for ESG, wright-patterson AFB, OH $20,761
Supplemental Agreement for work within scope 2B · Case 039 shift east side of work group; case 041 install new 3-way light switch adjacent to east door in ESG storage room 499 and reconfigure existing wiring… $9,775
Supplemental Agreement for work within scope 2A · Case 036 north phase wall opening, part 2 final to modification 1N, renovate building 1 for ESG, wright-patterson AFB, OH $378
Supplemental Agreement for work within scope 1Z · Case 008 extend circuits, renovate building 30001 for ESG, wright-patterson AFB, OH $25,143
Supplemental Agreement for work within scope 1Y · Case 038 equitable adjustment for extension of expansion joints above new ceiling height and deletion of requirement to demolish and rebuild wall; case 040… $5,705
Change Order 1X · Wright-patterson AFB - bldg. Renovation, ohio -$2,978
Supplemental Agreement for work within scope 1W · Case 021X reroute cable, part 2 final, renovate building 1 for ESG, wright-patterson AFB, OH $863
Supplemental Agreement for work within scope 1V · Case 024 relocate east office workstation and furniture and remove top row of furniture panels for lower partition height, part 2 final, renovation of… -$511
Supplemental Agreement for work within scope 1U · Case 030 relocate fire alarm circuits, part 2 final to modification 1K, renovate building 30001, wright-patterson AFB, OH -$414
Change Order 1T · Case 027-2 abatement of asbestos floor tile, part 2 final, renovate building 1 for ESG, wright-patterson AFB $1,639
Supplemental Agreement for work within scope 1S · Case 031 equitable adjustment for work associated with power outage, including diagnosing of cause of flickering lights in west end offices; connecting… $3,072
Change Order 1R $4,413
Supplemental Agreement for work within scope 1P · Case 029 install 200% neutral conductor for panels and demolish abandoned circuit at bottom of trainway window, building 1 renovation for ESG,… $3,371
Supplemental Agreement for work within scope 1Q · Case 035 change furniture configuration for source selection rooms and small business area, renovate building 1 for ESG, wright-patterson AFB, OH $79,877
Change Order 1N · Case 36 provide wall opening in wall between north phase rooms 300 and 315 southeast of column 39F, part I notice to proceed, building 1 renovation for ESG,… $1,000
Supplemental Agreement for work within scope 1M · Case 023-2 provide fire sprinkler riser upgrades in specified areas, renovate building 1 for ESG, wright-patterson AFB, OH $3,761
Change Order 1L $18,218
Supplemental Agreement for work within scope 1K · Case 030 relocate fire alarm circuits in north phase, part 1 notice to proceed, wright-patterson AFB $9,000
Supplemental Agreement for work within scope 1J · Case 014 provide standalone card reader; case 017 revise signage at specified locations, renovate building 30001, wright-patterson AFB, OH $8,939
Change Order 1H · Case 028 north phase floor plan changes including revisions to architectural, mechanical and electrical plans, delete requirements to remove materials and… $0
Change Order 1G · Case 027 estend boundary of asbestos tile abatement to include area north of column line G and west of column line 37, part I notice to proceed, building 1… $10,000
Change Order 1F · Case 024 relocate east office work station in room 638, rotate furniture 90 degrees counterclockwise and remove top row of furniture partitions from both… $1,000
Change Order 1E · Case 023 provide fire sprinkler riser upgrades to work areas, part I notice to proceed, building 30001 renovation, wright-patterson AFB, OH $10,000
Change Order 1D · Case 21 delete requirement to remove 150 pair telephone cable and reroute and terminate, and adjust support as required to elevate above ceiling height, part… $8,000
Change Order 1C $116,334
Supplemental Agreement for work within scope 1B · Case 004 provide and install 2 circuit-breaker panels in end wall east of office 628; case 006 replace existing concrete pad with new pad for MCC-B equipment,… $840
Supplemental Agreement for work within scope 1A · Case 001, changes to electrical drawings to reflect changes in feeder sizes for new panels; case 002, reconnect water and sanitary service to sinks, renovate… $14,904
Original award $5,171,663
Show all 29

Quick answers

Who was awarded contract 0007?

0007 was awarded to Calvary Contracting Inc. by ENDIST Louisville (US Army Corps of Engineers) on September 16, 2010.

How much is contract 0007 worth?

The government has obligated $5,526,792 on 0007.

Is contract 0007 an order under another contract?

Yes. 0007 is a delivery order under W912QR09D0042, an indefinite delivery contract.

Was contract 0007 competed?

The extent of competition for 0007 was full and open competition after exclusion of sources. The government received 3 offers. It was set aside: Service-Disabled Veteran-Owned Small Business.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award