Delivery Order W912PL10D0023-CM01

Award Date 9/11/14
Potential Completion Date 4/30/16
Potential Value $933K
Federal Agency
ENDIST Sacramento
Ultimate Awardee
AECOM
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Piedra, CA 93649, USA
Solicitation Procedures
Architect-Engineer FAR 6.102
Number Of Offers Received
8
Legislative Mandate
Service Contract Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The Department of the Army Corps of Engineers Engineering District Sacramento awarded a $3,571,230.96 firm fixed price contract to Hooker Creek Inc., a HUBZone certified small business, for the Pine Flat Landslide Risk Reduction project. This contract involves the installation of two rock barriers downstream of Pine Flat Dam in Sanger, California to mitigate potential rockfall damage to the dam's facilities from an active landslide. The project also includes minor access road improvements and...
The Department of the Army Corps of Engineers awarded a $456,604.30 firm fixed-price delivery order to AECOM Technical Services, Inc., a subsidiary of the global infrastructure services firm AECOM, to provide plans and specifications to reduce the risk of a landslide at the Pine Flat site in Fresno County, California. This award was issued under the Corps' $110 million South Pacific Geotechnical Engineering 2016-2021 indefinite delivery, indefinite quantity (IDIQ) contract. AECOM has...
This is a firm fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers Engineering District Sacramento to HDR Engineering, Inc. (doing business as HDR) for the Pine Flat Dam and Lake Water Control Manual Update project located in Fresno County, California. The potential value of the contract is $159,119.14. There was no set-aside used for this award. HDR is a for-profit subchapter S corporation that provides engineering, architecture, environmental, and construction...
This federal contract award is for the PL84-99 Sutter-Yolo Levee Repairs project, awarded by the Department of the Army Corps of Engineers Engineering District Sacramento to the prime contractor Four M Contracting, Inc., a self-certified small disadvantaged business. The contract, valued at $738,143.42, is a definitive, firm fixed-price contract for the construction of debris/rockfall barriers on a landslide located on the downstream right abutment of Pine Flat Dam in Piedra, California. The...
The U.S. Army Corps of Engineers (USACE) Sacramento District awarded a $294,499.99 firm-fixed-price purchase order to Wirewrangler LLC, doing business as T W Power Line Construction, for electrical upgrade services at the Pine Flat Dam & Lake Island Park Campground in Piedra, California. The work includes installing infrastructure for a transformer, replacing concrete poles, and installing electrical panels and breakers. This contract is not set aside for any small business program....
The Army Corps of Engineers Engineering District Sacramento awarded Shimmick Construction Company, Inc. a $970,900 firm-fixed-price contract to complete Phase 2 of the Tule River/Success Lake Spillway Enlargement Project in Porterville, California. The scope of work involves constructing a 10-foot high, 350-foot long curved reinforced concrete ogee weir across Success Lake spillway, as well as associated side walls, a downstream apron, spillway widening, excavations using blasting and equipment,...
This federal contract award to Kleinfelder - Stantec USACE A Joint Venture is a $4,717,832.42 firm fixed price delivery order under the U.S. Army Corps of Engineers' Dam and Levee Safety Program Design Services indefinite-delivery/indefinite-quantity (IDIQ) contract. The award is for the Tule River Spillway Enlargement Project Phase 2, which involves geotechnical engineering during construction and concrete testing support for a dam safety project located in Porterville, California. The contract...
This is a $1,337,348.65 firm-fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers to the HDR GEI Joint Venture, a partnership between HDR, Inc. and CH2M. The contract is for the preparation of water control manual update management plans for multiple dams in the Truckee River Basin in Nevada and California, as well as the Pine Flat Dam and Lake on the Kings River and the Buchanan Dam-H.V. Eastman Lake on the Chowchilla River in California. The contract is a task...
This is a firm fixed-price delivery order contract awarded by the U.S. Department of the Interior's Region 5 - Pacific Southwest Region to Pacific Flyway Geotechnical Consultants LLC, a for-profit limited liability company. The contract, valued at $21,981.74, is for a 2D P-wave refraction survey to develop a tomography profile of the soil and rock at the 11 Pines Slide location in Placerville, California. The contract does not have a set-aside designation and is scheduled for completion by...
This is a $457,288.59 firm-fixed price delivery order contract awarded by the U.S. Army Corps of Engineers to Pbi-Cys Civil & Structural Consultants LLC, a small business limited liability company, to provide a geotechnical report for a potential borrow site related to the Lower San Joaquin River Project in Stockton, California. The delivery order contract has a completion date of March 30, 2023 and does not utilize any set-aside designation. Pbi-Cys Civil & Structural Consultants LLC...
  • W912PL10D0023
    Indefinite Delivery Contract
  • W912PL10D0023-CM01
    Delivery Order

PROJECT TITLE AND LOCATION: SLOPE FAILURE INVESTIGATION AND MITIGATION DESIGN, PINE FLAT DAM, PIEDRA, FRESNO COUNTY, CALIFORNIA

Posted 9/11/14, 12:00 AM