Arra::yes::arra recoveryproject#::099990::RP# project 600-09-205 recovery B126 replace electrical equipment, phase II provide all labor, materials, tools and equipment, and design-build services…
Ended Awarded Last action
- Contract number
- 0001
- Awardee
-
DWG & Associates, Inc. UEI XBCGMT6FM4M8 Part of DWG & Associates, Inc.
- Awarding agency
-
ENDIST Los Angeles
US Army Corps of Engineers, Department of Defense
- Obligated
- $1,396,758
Award facts
- Opportunity
-
- W912PL09R0045 Solicitation number
- Recovery--z--VA project no. 600-09-205 B126 replace electrical equipment phase II, veterans affairs long beach healthcare system, LOS angeles county, CA Award Notice · Posted Oct 1, 2010
- Indefinite delivery indefinite quantity multiple award task order contract in support of vertical design-build projects primarily in the LOS angeles district and projects within the south pacific division, u. S. Army corps of engineers Award Notice · Posted Jul 23, 2009
- Contract value 100% obligated
- $1,396,758.02 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- Funding agency
- Veterans Integrated Service Network 22 Veterans Health Administration, Department of Veterans Affairs
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Z299 Maint, Rep/Alter/All Other
- Set-aside
- Competitive 8(a)
- Competition
- Full and Open Competition after exclusion of sources · 39 offers Negotiated Proposal / Quote
- Pricing
- Firm Fixed Price
- Place of performance
- Long Beach, CA 90801, USA
- Legislative mandates
-
- Walsh-Healey Public Contracts Act FAR subpart 22.6
- Davis-Bacon Act FAR subpart 22.4
- Economy Act FAR subpart 17.5
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Supplemental Agreement for work within scope | $0 | |
| Original award | $1,396,758 |
About this award
This is a firm fixed-price delivery order contract awarded by the Department of Veterans Affairs (VA) Veterans Integrated Service Network 22 for the design-build construction of the Recovery B126 Replace Electrical Equipment, Phase II project at the Long Beach Veterans Medical Center in Long Beach, California. The contract, valued at $1,396,758.02, was set aside for competition among 8(a) small businesses and awarded to the service-disabled veteran-owned small business DWG & Associates, Inc. The project involves the replacement of electrical equipment including switchboards, motor control centers, panel boards, transformers, and circuit breakers, as well as the provision of temporary power and structural support. The contract has a completion date of June 20, 2012 and was awarded on October 1, 2010.
Description
Arra::yes::arra recoveryproject#::099990::RP# project 600-09-205 recovery B126 replace electrical equipment, phase II provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of recovery B126 replace electrical equipment, phase II and modifications per design drawings and specifications at the long beach veterans medical center, long beach, california. B. Project specific requirements for: 1.project 600-09-205 recovery B126 replace electrical equipment, phase II a. The design build contractor is to provide labor, materials, tools, equipment, and design-build services necessary for design build of project 600-09-205 recovery B126 replace electrical equipment, phase II and modifications per design drawings and specifications at the long beach veterans medical center, long beach, california. Include all design, drawing, specifications, engineering, construction and administration required to satisfy the requirements stated in the RFP. Scope of work is limited to building 126 and includes but not limited to the following: 1. Provide 100% construction documents (plans and specifications) based on the 65% construction documents in the RFP. 2. Replace switchboards indicated in the RFP. 3. Replace motor control centers indicated in the RFP. 4. Replace distribution panel boards indicated in the RFP. 5. Replace branch circuit panel boards indicated in the RFP. 6. Replace dry-type transformers indicated in the RFP. 7. Replace enclosed circuit breakers indicated in the RFP. 8. Provide temporary power to feed the loads of the switchboards, MCC, panel boards and transformers being replaced. Any power outage shall be minimized and carefully coordinated with valb project manager and corps of engineers resident engineer. 9. Relocate electrical equipment to meet required NEC clearance requirements. Extend feeder and branch circuit wiring to the new locations as required. 10. Provide structural support for the electrical equipment designed by structural engineer. 11. Provide a construction phasing plan to be coordinated and approved by valb and corps of engineer resident engineer. 12. General requirements: 12.1 construction work shall be performed within the hours of 5:00 PM and 3:00 am. 12.2 provide a minimum 14-day notice to the government before any electrical outage. Maximum outage of 8 hours is acceptable when replacing a transformer. 12.3 provide an adequate number of temporary panels to avoid work stoppage and delays. 12.4 in areas where the temporary panels have to be located outside the electrical rooms because of space restrictions, work has to be performed on weekends. 12.5 replace equipment on normal power prior to replacing equipment on emergency power. Start work on the top floor. 12.5.1 contractor can work on only one panel per floor at a time, on as many floors as possible. 12.6 contractor shall comply with all the safety requirements of OSHA and VHA directive 2006-056. B. Provide for and maintain all necessary protection of building systems and services during construction. Provide cover to any equipment in construction areas to protect from dust buildup while performing work. Perform touch-up painting of all affected areas as needed. C. Contractor shall prepare and submit for approval shop drawings and product data of intended equipment and materials to be used. Provide manufacturer information, catalog cuts, and shop drawings to clearly indicate construction work. Do not start construction until all materials, submittals, and equipment are on hand.
Quick answers
Who was awarded contract 0001?
0001 was awarded to DWG & Associates, Inc. by ENDIST Los Angeles (US Army Corps of Engineers) on October 1, 2010.
How much is contract 0001 worth?
The government has obligated $1,396,758 on 0001.
Which agency awarded contract 0001?
ENDIST Los Angeles (US Army Corps of Engineers) awarded 0001, with funding from Veterans Integrated Service Network 22 (Veterans Health Administration).
Is contract 0001 an order under another contract?
Yes. 0001 is a delivery order under W912PL10D0008, an indefinite delivery contract.
Was contract 0001 competed?
The extent of competition for 0001 was full and open competition after exclusion of sources. The government received 39 offers. It was set aside: Competitive 8(a).
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award