Arra::yes::arra recoveryproject#016350::RP# santa paula creek, CA the architect-engineer (a-e) shall prepare a hydrology, hydraulics, and sedimentation appendix, a geotechnical field investigation and…

Ended Awarded Last action

Contract number
0015
Awardee
Awarding agency
Obligated
$1,143,799

Award facts

Contract value 100% obligated
$1,143,799.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Contracting staff
NAICS code
541330 Engineering Services
Set-aside
No set-aside
Competition
Full and Open Competition · 1 offer Multiple Award, Fair Opportunity
Pricing
Firm Fixed Price
Place of performance
Santa Paula, CA 93060, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Other Administrative Action 3 · Design documentation report, santa paula creek, ventura county, CA $0
Supplemental Agreement for work within scope 2 · Final design documentation report and final plans & specs, fish passage, santa paula creek project, ventura county, CA $36,299
Supplemental Agreement for work within scope 1 · Recoveryproject#::016350::RP# santa paula creek flood control project, city of santa paula, ventura county, CA. Design documentation report (DDR), modeling,… -$235,498
Original award $1,342,998

About this award

This federal contract award, W912PL09D0033|0015, was issued by the U.S. Army Corps of Engineers (USACE) to the prime contractor HDR-CDM, a Joint Venture. The $1,143,799.00 firm fixed price contract is for the preparation of various engineering and environmental documentation to support design solutions for addressing scour and overtopping issues on the Santa Paula Creek Flood Control Project in Santa Paula, California. This work includes a hydrology, hydraulics, and sedimentation appendix, a geotechnical field investigation and report, an environmental assessment (EA), a biological assessment (BA), and the development of 90% construction drawings and specifications. The contract is not associated with a set-aside and has an ultimate completion date of April 1, 2013.

Description

Arra::yes::arra recoveryproject#016350::RP# santa paula creek, CA the architect-engineer (a-e) shall prepare a hydrology, hydraulics, and sedimentation appendix, a geotechnical field investigation and report, and an environmental assessment (EA) to support design solutions for scour and overtopping issues, prepare a design documentation report (DDR), and prepare a biological assessment (BA) in support of 90% construction drawings and specifications for the santa paula creek flood control project located in the city of santa paula. The a-e shall incorporate proposed project inlet and fish ladder design, as described in the field change report, and develop design solutions resolving both the TOE protection (scour) issue through the upper reaches of the project, as well as the downstream overtopping issues that were identified in the prior work. The scour problem extends from immediately below the project inlet to upstream of the railroad bridge. The overtopping issue for the 28,000 CFS event extends from the vicinity of the highway 126 bridges to the downstream end of the project on both sides of the channel. Final design material will consist of contract drawings, specifications, design backup/calculations, cost estimate, quantity estimates, and engineering considerations and instructions for field personnel (ecifp). The above design material shall be prepared in accordance with sound engineering judgment, engineering criteria (federal, state and local), US army corps of engineers (USACE, corps) policy, and shall follow procedures outlined in this scope of work. In addition, the work and services shall include all management and documentation of coordination activities required to successfully produce all work in accordance with this scope.

Quick answers

Who was awarded contract 0015?

0015 was awarded to Hdr-Cdm, A Joint Venture by ENDIST Los Angeles (US Army Corps of Engineers) on September 20, 2010.

How much is contract 0015 worth?

The government has obligated $1,143,799 on 0015.

Is contract 0015 an order under another contract?

Yes. 0015 is a delivery order under W912PL09D0033, an indefinite delivery contract.

Was contract 0015 competed?

The extent of competition for 0015 was full and open competition. The government received 1 offer.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award