Statement of work repair slabs, ramp 1 edwards AFB, CA the contractor shall provide all labor, materials & equipment necessary to complete the following repairs at ramp 1, edwards AFB, CA: a. Remove…

Ended Awarded

Contract number
0071
Awardee
Awarding agency
Obligated
$280,944

Award facts

Opportunity
Contract value 100% obligated
$280,944.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z2BD Repair Or Alteration Of Airport Runways And Taxiways
Set-aside
No set-aside
Competition
Full and Open Competition · 3 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Edwards, Edwards AFB, CA 93523, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Description

Statement of work repair slabs, ramp 1 edwards AFB, CA the contractor shall provide all labor, materials & equipment necessary to complete the following repairs at ramp 1, edwards AFB, CA: a. Remove cracked areas, 12 inline across six (6) PCC slabs located south of building 1600 (see figure 1), confirm/prepare base, and replace with new. Dowel all slabs to match existing. Note that concrete is 18 (+/-) thick. Provide PCC with confirmed 650 PSI flexural strength, non ASR mix design must be specifically approved by COE. Finish to match surrounding slabs. Area of pad removal and replacement is 1750 SF. B. Remove 1,600 LF of existing, compromised joint sealant in a length of wide joints as shown in figure 2 and marked on ground. Clean joint of all foreign material and confirm integrity of the existing base. Fill joint from base to near grade surface with fine-mix ACC. Seal with silicone joint sealant over a backer bar. C. Remove and replace 4,000 LF (TOTAL) of existing, compromised joint sealant as indicated in figure 3 and marked on ground. D. Repair spalls adjacent and near joint repair areas. Locations have been identified and marked on ground, 900 SF TOTAL. Performance period is ninety (90) calendar days from the time the contractor receives the formal notice to proceed. Davis bacon wage determination is CA120031 DTD 08.03.2012. Liquidated damages are calculated at $1,350.00 per day. Option year 3 - line items 3001AA - 3031AJ granite construction CO. EA13027 repair slabs, ramp 1 at edwards AFB, CA line item description UOM TOTAL qnty TOTAL 3001AO subgrade prep assume 6 thick SY $3.00 210 $630.00 3011AH new reinforced concrete roadway pad CY $450.00 143 $64,350.00 3016 select fill material CY $8.00 210 $1,680.00 3021AA excavation of unsuitable material CY $5.50 210 $1,155.00 3021AB hauling if unsuitable material CY $8.00 315 $2,520.00 3021AC landfill disposal CY $4.00 315 $1,260.00 3022AB mechanical foreign object removal HR $70.00 336 $23,520.00 3026AB jet fuel resistant LF $6.00 4388 $26,328.00 3027AA spall repair SF $120.00 625 $75,000.00 3027AB rout and seal cracks SF $20.00 1600 $32,000.00 3028AC demo concrete CY $30.00 143 $4,290.00 3031AE equipment pool per to 1 $6,720.00 3031AF material pool per to 1 $15,219.00 3031AG laborer HR $90.00 48 $4,320.00 3031AJ operator, light equip HR $98.00 224 $21,952.00 TOTAL $280,944.00

Quick answers

Who was awarded contract 0071?

0071 was awarded to Granite Construction Company by ENDIST Los Angeles (US Army Corps of Engineers) on July 24, 2013.

How much is contract 0071 worth?

The government has obligated $280,944 on 0071.

Is contract 0071 an order under another contract?

Yes. 0071 is a delivery order under W912PL09D0032, an indefinite delivery contract.

Was contract 0071 competed?

The extent of competition for 0071 was full and open competition. The government received 3 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award