Statement of work repair ACC 1210/1207 edwards AFB, CA provide all labor, materials, equipment and supervision to maintain airfield pavements located near bldgs 1207 and 1210 as follows: 1)…

Ended Awarded Last action

Contract number
0070
Awardee
Awarding agency
Obligated
$490,789

Award facts

Contract value 100% obligated
$490,788.50 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Full and Open Competition · 3 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Edwards, Edwards AFB, CA 93523, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope 1 · Contract for RPR a/C between B1207 & B1210 at edwards AFB, CA. Reference no. R70001. 00001 ramp 2. Total contract price is increased by $26,595.00. The contract… $26,595
Original award $464,194

Description

Statement of work repair ACC 1210/1207 edwards AFB, CA provide all labor, materials, equipment and supervision to maintain airfield pavements located near bldgs 1207 and 1210 as follows: 1) pulverize and repave the existing asphalt shoulders surrounding ramp 2, adjacent to hangars 1207 and 1210. A) asphalt is to be polymer-modified 64-28 mix. Use of recycled asphalt (RAP) is not permitted. B) where newly paved ACC lies against PCC, create a joint by saw-cutting the ACC and filling with joint sealant. Please ACC slightly over-height and grind to match PCC elevations. C) note the following clarifications to the drawing: I) do not disturb the PCC located between 1207 and 1210 2) construct four (4) concrete pads, each 35 X 10 , on the edge of the shoulder adjacent to the PCC slab and to each of the blast shields. Relocate the blast shields to the pads and secure them similar to as currently. 3) crack repair and FOG seal, using GSB-88 sealer binder, the apron between bldg 1220 and 1210/1207. 4) provide airfield pavement markings and removal and FOD removal. 5) all WOR4K shall be conducted while in direct radio contact with the control tower and in accordance with an approved airfield construction waiver. The performance period is 60 calendar days from the time the contractor receives the official notice to proceed. Davis bacon wage determination is kern county california, CA120031, effective upon exercise of option year 3 would be used. Liquidated damages are calculated at $1,060.00 per day.

Quick answers

Who was awarded contract 0070?

0070 was awarded to Granite Construction Company by ENDIST Los Angeles (US Army Corps of Engineers) on July 11, 2013.

How much is contract 0070 worth?

The government has obligated $490,789 on 0070.

Is contract 0070 an order under another contract?

Yes. 0070 is a delivery order under W912PL09D0032, an indefinite delivery contract.

Was contract 0070 competed?

The extent of competition for 0070 was full and open competition. The government received 3 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award