Statement of work repair 5TH street fort irwin, CA aapb: cafi-1211 the contractor shall provide all labor, material and equipment necessary to repair 5TH street at FT. Irwin, CA per the following…

Ended Awarded Last action

Contract number
0052
Awardee
Awarding agency
Obligated
$442,321

Award facts

Opportunity
Contract value 100% obligated
$442,320.50 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z2LB Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Set-aside
No set-aside
Competition
Full and Open Competition · 3 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Fort Irwin, CA 92310, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Description

Statement of work repair 5TH street fort irwin, CA aapb: cafi-1211 the contractor shall provide all labor, material and equipment necessary to repair 5TH street at FT. Irwin, CA per the following statement of work: - supply traffic control manpower and signage for traffic and personnel safety. - install construction signage on all surrounding streets and intersections. - saw cut and demo asphalt at all intersections and have a smooth asphalt transition. - repair failed, depressed and alligatored asphalt areas. Broken asphalt will be hauled off post to an approved disposal site or be pulverized to less than 1 DIA and stock pile per government directions. - place cold mix asphalt at conformed areas and intersections for smooth traffic access during asphalt repair progress. - sweep and clean all asphalt areas to accept new asphalt reinforcement fabric if required. - pulverize existing and repave with 3 asphalt. - verify 24 wide road. - compact sub grade to 90% or higher if required at new asphalt areas. - adjust all manholes and valves to new paving height. - repair and RE-grade existing drainage swales. - RE-grade and compact 10 dirt shoulders each side of roadway. - installation of stripping to match the existing with thermoplastic stripping and markings. Markings shall conform to CAL trans standards. The performance period is 45 calendar days from the time the contractor receives the official notice to proceed from the contracting officer S representative at the fort irwin resident office. Contractor is required to use davis bacon wage determination CA120037, MOD 9. Liquidated damages are $1,060.00 per day.

Quick answers

Who was awarded contract 0052?

0052 was awarded to Granite Construction Company by ENDIST Los Angeles (US Army Corps of Engineers) on August 29, 2012.

How much is contract 0052 worth?

The government has obligated $442,321 on 0052.

Is contract 0052 an order under another contract?

Yes. 0052 is a delivery order under W912PL09D0032, an indefinite delivery contract.

Was contract 0052 competed?

The extent of competition for 0052 was full and open competition. The government received 3 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award