Hydro Partners Joint Venture has been awarded a $1,080,126.54 firm fixed price small business set-aside contract by the U.S. Army Corps of Engineers to replace the sluiceway gate at Bonneville Dam near Cascade Locks, Oregon. The contract calls for Hydro Partners Joint Venture to fabricate and deliver a lower gate leaf, upper gate leaf, lifting arms, sheaves, wire rope, and four tensiometers to the dam site, as originally solicited through a sources sought notice. Under the contract, Hydro...
This is a firm-fixed-price delivery order awarded to HDR Engineering Inc. by the U.S. Army Corps of Engineers (USACE) for spillway gate modeling and engineering analysis at the Howard A. Hanson Dam in Portland, Oregon. The $199,574 contract has an ultimate completion date of April 25, 2016. This task order was issued under a larger indefinite delivery vehicle (IDV) contract the USACE has with HDR for civil and military project studies and designs. The contract did not utilize any small...
The U.S. Army Corps of Engineers awarded a $522,327 firm fixed price definitive contract to JCJ Chavez Construction Inc. to replace low flow slide gates at Warm Springs Dam in Geyserville, California. The contract is funded by the Corps of Engineers and supports dam infrastructure maintenance work. Performance will take place from August 2020 through March 2021. No set aside designation or subcontractor information was provided. The award provides necessary gate replacement services at the dam...
The U.S. Army Corps of Engineers awarded a $173,719 firm fixed price delivery order to Ecs-Gec JV for hydropower maintenance and repair services at multiple lock and dam sites in West Virginia. Under this contract, the prime contractor Ecs-Gec JV will provide hydropower maintenance and repair parts (HPMPS) for facilities located in Winfield, Marmet, and London Locks and Dam through September 2024. The funding agency, the Army Corps of Engineers, is responsible for maintaining and operating the...
This is a federal contract award to Andritz Hydro Corp, an Austrian-owned company that specializes in hydropower equipment and services, for work on the Lower Monumental Dam located in Kahlotus, Washington. The $16,960,762.60 Firm Fixed Price contract, awarded by the U.S. Army Corps of Engineers, covers the rewind of Generator Unit 1, repairs to the linkage and cavitation on Generator Unit 1, and cavitation repair on Generator Unit 2. The contract does not utilize a small business set-aside...
The U.S. Army Corps of Engineers awarded a firm-fixed-price delivery order contract in the amount of $565,671.00 to the INCA & Ch2M Hill Joint Venture for the development of plans and specifications for the fabrication and installation of two spillway gate hoists at the Bonneville Lock & Dam. The purpose of this American Recovery and Reinvestment Act (ARRA) project is to enable the existing unsplit spillway gates to be raised fully out of the water during a maximum flood event. This...
This federal contract award to Tetra Tech, Inc. is for revisions to the water control manual for the Grand Coulee Dam, a large hydroelectric dam in Washington state. The $292,283.31 firm fixed-price delivery order was issued by the U.S. Army Corps of Engineers and has a completion date of December 30, 2022. As the prime contractor, Tetra Tech will be responsible for tasks such as determining the manual's scope, developing an outline, preparing draft sections, assembling the full draft and...
The United States Army Corps of Engineers awarded a $0 firm fixed price delivery order to HDR-Gannett Fleming JV under an indefinite-delivery indefinite-quantity contract vehicle for National Dam Safety Engineering and Design Services. This order represents Option 1 for dam safety modification engineering and design support to the Corps' Dam Safety Modification Mandatory Center of Expertise. Performance will take place in Huntington, West Virginia. The prime contractor is a joint venture between...
This is a federal contract award to Andritz Hydro Corp, an Austrian-owned company that specializes in hydropower equipment and services for U.S. government agencies. The contract, valued at $31,948,612.00, was awarded by the U.S. Army Corps of Engineers for the John Day BLH Turbine Hub Upgrades project. The contract is a definitive, firm fixed-price contract with a completion date of November 14, 2025. Andritz Hydro Corp is a large, specialized contractor that has established itself as a...
This firm-fixed price purchase order, valued at $215,426.00, was awarded by the U.S. Army Corps of Engineers (USACE) to Warm Springs GEO Visions, a tribally owned firm and Indian economic enterprise, for site condition monitoring services to assist the Corps with compliance under Sections 106 and 110 of the National Historic Preservation Act. Warm Springs GEO Visions has extensive knowledge of the Confederated Tribes of the Warm Springs Reservation of Oregon's (CTWSRO) ancestral artifacts,...