Delivery Order W912HN08D0026-DH03
Award Date 5/20/10
Potential Completion Date 12/21/12
Potential Value $5M
Federal Agency
Awardee
Ultimate Awardee
Not listed PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
Competitive 8(a)
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Fort Riley, KS 66442, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The U.S. Army Corps of Engineers, Kansas City District awarded a $14.2 million firm fixed-price design-build contract to Blinderman Construction Co Inc. for the renovation of Building 223 barracks at Fort Riley, Kansas. The project scope encompasses a comprehensive whole-building renovation of the historic barracks structure, including replacement of all building systems, architectural revisions to meet current standards, and historic restoration of exterior elements. The work is scheduled for...
- This firm-fixed-price contract was awarded by the U.S. Army Corps of Engineers (USACE), Kansas City District to Blinderman Construction Co Inc. for the renovation of Building 404 at Fort Riley, Kansas. The $14,177,344.00 contract, which has no set-aside designation, includes replacing the building's mechanical, electrical, communications, security, and fire/life safety systems, as well as architectural revisions to meet current barracks standards for E-1 through E-5 personnel. This contract...
- The U.S. Army Corps of Engineers, Kansas City District awarded a $35,011,674 firm fixed price Design-Bid-Build construction contract to Cerris Builders, Inc. for the renovation of Barracks 7081 A, B, E, and F at Fort Riley, Kansas. The scope of work includes repairing and renovating the four barracks buildings to convert them into single room apartments with shared living spaces and kitchenettes. This contract is not set aside for any specific business category. Cerris Builders, Inc. is a...
- The U.S. Army Corps of Engineers, Kansas City District awarded a firm fixed price design-build construction contract valued at $34,074,909.00 to MW Builders, Inc. to renovate three 48-year-old barracks buildings at Fort Riley in Kansas. The contract, which has no set-aside designation, involves reconfiguring the existing "Jack and Jill" style barracks to single room apartment units with private baths and kitchenettes. The scope includes walls, insulation, utilities, interior...
- This is a firm-fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE) Kansas City District to Milcon Construction, LLC, a HUBZone small disadvantaged business. The contract, valued at $4,346,918.00, is for the historical renovation of Building 206 located at Fort Riley, Kansas. The contract is a task order issued under the USACE Kansas City HUBZone Construction 2014-2017 indefinite-delivery, indefinite-quantity (IDIQ) contract vehicle. Milcon Construction, LLC is...
- The U.S. Army Corps of Engineers, Kansas City District awarded a $36,254,221 definitive, firm fixed-price contract to MW Builders, Inc., a for-profit subchapter S corporation, for the renovation of three barracks buildings (7614, 7616, and 7648) at Fort Riley, Kansas. The scope of work includes reconfiguring the buildings from open bay to single occupancy rooms with private baths and kitchenettes. This design-build contract was issued as a full and open competition with no set-aside designation,...
- This is a delivery order contract awarded by the U.S. Army Corps of Engineers (USACE), Kansas City District, to Milcon Construction, LLC, a HUBZone small disadvantaged business based in San Antonio, Texas. The contract, which has a total ceiling value of $8,332,707.00, is for the repurposing of fiscal year 2015 company operations facilities (COFs) and tactical equipment maintenance facilities (TEMFs) at Fort Riley, Kansas. The contract was awarded on a firm-fixed-price basis and has an...
- <p>The Department of the Army Installation Management Command Southwest Region awarded a $1,003,680.03 firm fixed price delivery order contract to Olgoonik Enterprises LLC to repair the roof of Building 1950 at Fort Riley in Junction City, Kansas. The contract has a period of performance starting on March 28, 2022 and ending on January 23, 2023. No subcontractors were identified.</p>
- The Department of the Army Installation Management Command Southwest Region awarded a $1.91 million firm fixed price delivery order to Olgoonik Diversified Services, LLC Ods / FLW Division for PROJECT F2-00030-8J to repair and convert Building 7604 at Junction City, Kansas. Under this contract, Olgoonik Diversified Services will provide repair and conversion services for the specified building located at Fort Riley in Junction City, Kansas. The work is to be completed between May 2020 and...
- <p>This is a firm fixed-price delivery order awarded by the U.S. Army Medical Command (MEDCOM) to Gkkworks Construction Services, a for-profit organization, for the renovation of the second floor of the Irwin Army Community Hospital at Fort Riley, Kansas. The contract has a ceiling value of $2,441,712.08 and a completion date of May 22, 2011. The work is being performed in Junction City, Kansas. This award is not associated with a set-aside program.</p>
- W912HN08D0026Indefinite Delivery Contract
- W912HN08D0026-DH03Delivery Order
8710 BATTALION HEADQUARTERS BUILDING AT FORT RILEY, KS.
Posted 5/20/10
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Multiple Award Task Order Contract (MATOC) for Construction and/or Design/ Build of Battalion and Brigade Headquarters (Bn/Bde HQ) for the Northwest Region | W912HN-07-R-0098 | Department of the Army Corps of Engineers Engineering District Savannah | Award Notice 1/1 | 8/24/07, 12:00 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 23 | Change Order | $5.3k | 11/29/12 | |
| 22 | Change Order | $36.5k | 8/10/12 | |
| 21 | Change Order | $17.9k | 11/15/11 | |
| 20 | Change Order | $11.7k | 10/19/11 | |
| 19 | Change Order | $2.2k | 9/16/11 |