Delivery Order W912DW10D1011-0002
Award Date 1/25/11
Potential Completion Date 1/21/12
Potential Value $1.6M
Funding Federal Agency
Contracting Federal Agency
Awardee
Ultimate Awardee
Not listed PSC Category
Set-Aside Type
8(a) Sole Source
Federal Contract Vehicle
- Not listed
Extent Competed
Not Available for Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Stevensville, MT 59870, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The Federal Highway Administration awarded a $22.57M Firm Fixed Price definitive contract to S & L Landscaping & Excavation Inc. for the Mill Creek Canyon Road Construction project in Bingham Canyon, Utah, with completion targeted for November 2026. This project involves comprehensive road reconstruction and widening within the Uinta-Wasatch-Cache National Forest, including timber removal, rock and soil excavation, profile adjustments, curve widening, ditch reconstruction, retaining wall...
- <p>This is a $1,388,639.12 firm fixed-price contract awarded by the U.S. Department of Agriculture's Central Region to Jay Mills Contracting Inc. for a recovery-funded project to repair slope slides on Trinity Chambers Creek Watershed Sites 32 and 38 using a lime-treatment process. The contract does not have a set-aside designation and has an ultimate completion date of November 12, 2010. The contract is a definitive contract and was awarded on January 5, 2010.</p>
- The federal contract award was issued by the Department of Transportation Federal Highway Administration (DOT FHWA) to Construction Solutions Group, LLC for slope stabilization repairs on sections of the Blue Ridge Parkway located in North Carolina. The project, valued at $4.06 million, involves fill slope stabilization with reinforced soil slopes and cut slope stabilization with rock bolts and ground anchors along with minor asphalt and pavement work. It was awarded through a total small...
- This firm fixed price contract for $11,981 awarded by the Department of the Army Corps of Engineers Engineering District New England calls for Stone Construction Company, Inc. to regrade slopes on the east side of Northfield Brook Lake in Thomaston, Connecticut. The project is designated for total small business participation and must be completed by October 10, 2021. As the awarding agency, the Corps of Engineers Engineering District oversees civil works and military construction projects in...
- This no-cost administrative modification finalizes a $485,143.10 firm fixed-price delivery order awarded to Bryant's Land and Development Industries, Inc. for slope stabilization repairs along a 0.17-mile segment of Halls Top Road (FS-207) in Pelham, Tennessee. The project scope includes construction of rock-filled gabion wall systems, drain dip construction, and aggregate roadway resurfacing. The contract was awarded on August 11, 2022, with an ultimate completion date of March 23, 2023, and is...
- This contract was awarded by the U.S. Army Corps of Engineers to Uphill Construction LLC, a Small Business Administration (SBA) certified Economically Disadvantaged Women-Owned Small Business (EDWOSB), 8(a) Program Participant, Women-Owned Small Business (WOSB), and HUBZone firm. The $3,052,306.80 firm fixed price contract is for furnishing compacted impervious fill as part of a levee repair and slope flattening project along the Little River Headwater Diversion Levee in Cape Girardeau,...
- This firm fixed price contract valued at two million eleven thousand seven hundred twenty-nine dollars and forty-eight cents ($2,011,729.48) was awarded by the Department of the Army Corps of Engineers (USACE) to Lund Randy M Engineering Division doing business as Lund Engineering. The place of performance is Milan, Illinois and Rock Island, Illinois. The work includes clearing, grubbing, stripping, levee reshaping, stone placement and gate repairs for the Milan, Illinois Flood Control Project...
- The Federal Highway Administration awarded a $3.52 million firm fixed-price definitive contract to Granite Construction Company on January 7, 2025, for the OR FLAP Umatilla 582(1) Mill Creek Road construction project in Walla Walla, Washington. The project involves comprehensive road rehabilitation work on a 2.91-mile stretch of Mill Creek Road, including chip seal application, crushed aggregate placement, grading, repair of soldier pile walls with anchored wire mesh, signing, traffic control,...
- <p>This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers, New England District (ENDIST New England) to Granite State Lawn Care, a small business, for $140,891.78 to perform slope repair work at the Union Village Dam in East Thetford, Vermont. The contract has a completion date of November 6, 2015 and was set aside for small businesses. No additional details about larger contract vehicles or subcontractors were provided.</p>
- The U.S. Army Corps of Engineers, Philadelphia District awarded a $113.5 million firm fixed-price definitive contract to Great Lakes Dredge & Dock Co, LLC on October 28, 2024, for the Manasquan Beach Fill project in Ocean County, New Jersey. The contract requires the placement of approximately 2.1 million cubic yards of beach fill material along 13 miles of coastline between Manasquan Inlet and Barnegat Inlet to support coastal restoration and storm risk management objectives. The work...
- W912DW10D1011Indefinite Delivery Contract
- W912DW10D1011-0002Delivery Order
MILLTOWN SLOPE REPAIR & FINAL GRADING
Posted 2/10/11
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 2 | Supplemental Agreement for work within scope | $29.6k | 8/4/11 | |
| 1 | Change Order | $90.0k | 5/24/11 | |
| Not listed | Not listed | $1.5m | 2/10/11 |