Recovery--17TH street closure - flood protection structural improvements to the existing flood protection measures in the washington DC are planned in and around the national mall area. The…

Ended Awarded

Contract number
0004
Awardee
Awarding agency
Obligated
$54,472

Award facts

Contract value 100% obligated
$54,472.29 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
541330 Engineering Services
Set-aside
No set-aside
Competition
Full and Open Competition · 46 offers Architect-Engineer FAR 6.102
Pricing
Firm Fixed Price
Place of performance
Washington, DC 20551, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

About this award

This contract award is for the Recovery--17th Street Closure - Flood Protection Structural Improvements project, which is intended to construct a 380-foot flood protection closure across 17th Street, south of Constitution Avenue NW in Washington, D.C. The project involves constructing a 140-foot long removable post and panel system, as well as two 120-foot long permanent reinforced concrete floodwalls. The optional work includes stone veneering the floodwalls and landscaping the disturbed areas. The contract was awarded to Berger / Smith Group on a firm fixed-price basis by the U.S. Army Corps of Engineers Baltimore District, a defense agency, for a ceiling value of $54,472.29. The project has an ultimate completion date of August 15, 2010 and does not utilize a set-aside designation.

Description

Recovery--17TH street closure - flood protection structural improvements to the existing flood protection measures in the washington DC are planned in and around the national mall area. The improvements consist of constructing a 380 flood protection closure across 17TH ST., south of constitution AVE. NW. The closure consists of a 140 long removable post and panel system and two (2) 120 long permanent reinforced concrete floodwalls located on both sides of the post and panel system. In the optional work, the floodwalls will be stone veneered to blend in with the site settings and to minimize visual impacts and all disturbed areas will be landscaped.

Quick answers

Who was awarded contract 0004?

0004 was awarded to Berger / Smith Group by ENDIST Baltimore (US Army Corps of Engineers) on July 1, 2010.

How much is contract 0004 worth?

The government has obligated $54,472 on 0004.

Is contract 0004 an order under another contract?

Yes. 0004 is a delivery order under W912DR07D0021, an indefinite delivery contract.

Was contract 0004 competed?

The extent of competition for 0004 was full and open competition. The government received 46 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award