Multiple Award Task Order Contract (MATOC) for Maintenance, Repair, and Restoration (MRR), Lake Office Projects and Civil Works Within the Tulsa District Boundaries; POC: Susie Mall
Added: Jan 15, 2009 8:24 am THIS SOLICITATION IS 100% HUB-ZONE SET-ASIDE. Efforts include but are not limited to the following: maintenance, repair and rehabilitation of roads, paved surfaces, and small inhabitable structures, and slope and shoreline protection on various lakes and civil works projects within the geographical boundaries of the Tulsa District. The first task order, inclusive in the RFP consists of repairing erosion and providing slope stabilization at Arcadia and Keystone Lakes, Oklahoma. Estimated cost range is $25M to $100M for all contracts awarded under this solicitation, over the base year and four option year period. All technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunites site, fbo.gov. Issue date on or about 3 February 2009. For questions, please contact Ms. Susie Mall, Contracting Organization, 918-669-7273. W912BV-09-R-1008 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 1/8 1/15/09, 8:24 AM RECOVERY--Z--PROJECT NUMBER 74945, Lake Texoma, Denison Dam, TX
Added: Apr 05, 2011 2:50 pm RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Silver Spur Construction Co., W912BV-09-D-1002, Task Order 0004, Multiple Award Task Order Contract (MATOC)As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Silver Spur Construction Co., to extend the contract completion date for the following reason: During the completion of the permits for the work on this contract it was not indentified by the Corps of Engineers that separate dredging would be required for the completion of the Treasure Isle site. The contractor was thereby delayed, at no fault of their own, 120 days for the completion, review, and release of the dredging permits required for the completion of the work. W912BV-09-R-1008 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 8/8 4/5/11, 2:50 PM RECOVERY--Z--PROJECT NUMBER 13370, Optima Lake, OK
Added: Jan 15, 2010 12:06 pm RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): SILVER SPUR CONSTRUCTION, W912BV-09-D-1002; HDB CONSTRUCTION, W912BV-09-D-1003;TREND CONSTRUCTION, W912BV-09-D-1004; AND TRI-CITY SEAL, W912BV-09-D-1005 INCLUDED IN THE MAINTENANCE, REPAIR, AND RESTORATION (MRR), LAKE OFFICE PROJECTS AND CIVIL WORKS WITHIN TULSA DISTRICT BOUNDARIES INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT, HUBZONE SMALL BUSINESS MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) POOL. THE INTENT OF THIS ARRA PROJECT IS TO DEMOLISH THE STRUCTURES AT THE FIVE LAKE RECREATION SITES AND INSTALL A GATE TO CLOSE THE ROAD OVER TH DAM. WORK INCLUDES DEMOLISH CAMPSITES. ANY ABOVE GROUND STRUCTURES AT CAMPSITES SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. STRUCTURES MAY INCLUDE BUT ARE NOT LIMITED TO PICNIC TABLES, AWNINGS, AND WALLS. DEMOLISH RESTROOMS. ABOVE GROUND STRUCTURES SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEPTIC TANKS SHALL BE PUMPED FREE OF ALL LIQUID WASTE AND LARGE DEBRIS SHALL BE REMOVED. HOLES SHALL BE PUNCHED IN THE BOTTOM OF THE SEPTIC TANK TO ALLOW PROPER DRAINAGE OF FUTURE RAIN WATER WHICH MAY ENTER THE TANK. THE SEPTIC TANK SHALL THEN BE FILLED WITH SAND. THE TANK SHALL THEN BE FLOODED WITH WATER TO COMPACT THE SAND AND CHECK THE DRAINAGE OF THE TANK. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS NECESSARY TO PERFORM THIS WORK AND ENSURING THAT THE WORK COMPLIES WITH ANY APPLICABLE REGULATIONS AND STANDARDS. TRAILER DUMP STATIONS. ANY ABOVE GROUND STRUCTURES AT THE TRAILER DUMP STATIONS SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEPTIC TANKS SHALL BE PUMPED FREE OF ALL LIQUID WASTE AND LARGE DEBRIS SHALL BE REMOVED. HOLES SHALL BE PUNCHED IN THE BOTTOM OF THE SEPTIC TANK TO ALLOW PROPER DRAINAGE OF FUTURE RAIN WATER WHICH MAY ENTER THE TANK. THE SEPTIC TANK SHALL THEN BE FILLED WITH SAND. THE TANK SHALL THEN BE FLOODED WITH WATER TO COMPACT THE SAND AND CHECK THE DRAINAGE OF THE TANK. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS NECESSARY TO PERFORM THIS WORK AND ENSURING THAT THE WORK COMPLIES WITH ANY APPLICABLE REGULATIONS AND STANDARDS. OTHER ABOVE GROUND STRUCTURES EXIST AT THE LAKE WHICH SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF ACCORDING TO THE CONTRACT DOCUMENTS. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 237990. THE CONTRACT SPECIALIST FOR THIS ACTION WILL BE DANIEL FOYIL, (918)669-7045, E-MAIL DANIEL.A.FOYIL@USACE.ARMY.MIL. W912BV-09-R-1008 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 4/8 1/15/10, 12:06 PM RECOVERY--Z--PROJECT NUMBER 20120, Wister Lake, OK, PROJECT NUMBER 5650, Eufaula Lake, OK, PROJECT NUMBER 8790, Kaw Lake, OK
Added: Nov 04, 2010 5:52 pm RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Multiple Award Task Order Contract (MATOC)As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Silver Spur Construction, Co., to extend the contract as follows: This modification is issued to extend the contract completion date 52 calendar days for all work under this task order as the result of delays caused by high water levels at Kaw, Eufaula, Wister, and Ft. Gibson Lakes and inclement weather as described in the Default Section of the contract, 52.249-10. These delays occurred during the period between 23 April 2010 and 31 August 2010. These delays were not due to any fault or negligence on the part of the Contractor. W912BV-09-R-1008 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 7/8 11/4/10, 5:52 PM RECOVERY--Z--PROJECT NUMBER 1450, Pearson - Skubitz Big Hill Lake, KS
Added: May 19, 2010 11:39 am RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): HDB Construction, Inc., W912BV-09-D-1003, TO 0004, Performance Oriented Construction Activity (POCA)As part of Operations and Maintenance, Army, Recovery Act, modification has been issued to HDB Construction, Inc., to perform the following work: Excavate 418 sy from the center of the gate house east approx 100 feet and west approx 72 feet including the north driving lane next to the gate house. Remove material to a depth of 12 inches and replace with 6 inches of aggregate base material (AB-3) compacted to 95 percent modified proctor. Supply tee (3) drainage areas, 1 to be located approx 40 feet west of the gate shack, 1 at the west corner of the gate shack, and 1 approx 75 feet east of the gate shack. The drainage areas will consist of the use of clean drainage rock, approx 20 feet in length by 3 feet wide by 6 inches deep, draining from the centerline to the north ditch. Then place 6 inches of asphalt over the top of the aggregate base, in 2 inch lifts, compacted per MATCO specifications. W912BV-09-R-1008 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 6/8 5/19/10, 11:39 AM