The U.S. Army Corps of Engineers Engineering District Sacramento awarded Nordic Industries, Inc. a $44 million firm-fixed price contract to construct approximately 1.8 miles of various types of seepage cutoff walls along segments of the Sacramento River East Levee in Sacramento, California. Under the terms of the Sacramento River East Levee Contract 2, Nordic Industries will perform work including constructing soil-bentonite, slag cement-cement-bentonite, deep mix method, and jet grout walls...
This federal contract was awarded by the U.S. Army Corps of Engineers to Kovilic Construction Co Inc., a for-profit small business organization, to perform concrete repair work on the damaged portions of the ogee spillway structure. The $243,000.00 firm fixed-price contract will involve cutting and preparing a clean surface in order to place new concrete, with a completion date of January 10, 2021. This contract award appears to be a standalone project and not part of a larger contract...
<p>This is a $12,790,320.00 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE), Little Rock District, to the Bencor-Recon Joint Venture for the construction of a cutoff wall at the Clearwater Dam in Piedmont, Missouri. The contract has a completion date of February 28, 2015 and does not have a set-aside designation. The USACE is responsible for the oversight and management of this construction project.</p>
The Army Corps of Engineers Engineering District Sacramento awarded Shimmick Construction Company, Inc. a $970,900 firm-fixed-price contract to complete Phase 2 of the Tule River/Success Lake Spillway Enlargement Project in Porterville, California. The scope of work involves constructing a 10-foot high, 350-foot long curved reinforced concrete ogee weir across Success Lake spillway, as well as associated side walls, a downstream apron, spillway widening, excavations using blasting and equipment,...
This is a $4,014,987.96 definitive firm-fixed-price contract awarded by the U.S. Army Corps of Engineers to Civil Constructors, Inc. for the LOCK 17 SHEETPILE REPAIR project. The contract includes lead paint abatement, concrete demolition and replacement, sheet piling repairs, horizontal and vertical concrete work, handrail replacement, painting, trenching for electrical work, providing kevel rail and checkpost systems, procuring and stockpiling riprap, and site restoration. This requirement was...
The U.S. Army Corps of Engineers Engineering District Sacramento awarded a $3.7 million firm fixed price contract to Camenzind Dutra JV LLC to address erosion along 1,150 feet of the Sacramento River. The contract was awarded under Solicitation Sacramento River Erosion Contract 1 to install erosion protection including clearing, quarry stone placement, soil installation, in-stream wood placement, grass seeding, fencing and signage. The work will be performed in North Highlands, California from...
The U.S. Army Corps of Engineers, Pittsburgh District awarded a $952,195 firm fixed price contract to Coastal Drilling East, LLC Geotechnical Division for the Pike Island Monolith R33 and R34 River Wall Crack Stabilization project. Under the contract, Coastal Drilling East will perform repairs and stabilization of cracks within two concrete river wall monoliths at the U.S. Army Corps of Engineers' Pike Island Locks and Dam on the Ohio River in Wheeling, West Virginia. Work will include...
The U.S. Army Corps of Engineers, Engineering District Sacramento awarded a $70.3 million firm fixed price contract to Maloney-Odin JV on February 14, 2020. The contract is for improvements to approximately three miles of the Sacramento River East Levee in Sacramento, California under the American River Common Features, Sacramento River East Levee, Contract 1 project. Work will involve degrading and reconstructing over two miles of levee, constructing cutoff walls and berms totaling around...
The Department of the Interior Bureau of Reclamation awarded a $533,608 firm fixed price contract to Harrison Western Construction Corporation for concrete repair work on the spillway of the East Portal Diversion Dam in Colorado. The solicitation sought proposals to repair concrete and install reinforced concrete overlays and rubber flaps on the spillway, which is part of the Colorado-Big Thompson Project. As a total small business set-aside, the contract responds to a solicitation offering an...
The U.S. Army Corps of Engineers, New Orleans District awarded a $24.3 million firm fixed price delivery order to Eft Diversified Inc. under an indefinite-delivery/indefinite-quantity contract to repair stone foreshore dikes and jetties along 20 miles of the Mississippi River between Baton Rouge and the Gulf of Mexico in Plaquemines Parish, Louisiana. As part of its civil works mission, the Corps maintains navigation channels and flood risk reduction infrastructure on the lower Mississippi...