Change Order
P00032 · Calexico fence replacement settlement agreement
$2,600,000
Change Order
P00031 · Partial claim payment
$173,162
Other Administrative Action
P00030 · To correct about of obligations and deobligations.
$0
Change Order
P00029 · Calexico fence replacement 2 miles 0031 move all access road to the south contractor will provide all time material and equipment to move the all-purpose access…
$196,657
Other Administrative Action
P00028 · The modification is to correct errors from P00022 which removed funds for the incorrect clin. To correct this funds are added back to clin 0002 and removed from…
$0
Change Order
P00027 · Calexico fence replacement 2 miles, contract for border infrastructure fence replacement of ~2.25 MI in calexico, EL centro sector at calexico, CA. Reference…
$0
Change Order
P00024 · Calexico fence replacement 2 miles reference no. R00024 0028 undermined wall panels 0029 removal of temporary fencing 0030 boundary survey a. Scope of work 0028…
$0
Change Order
P00023 · Calexico fence replacement 2 miles. A. Scope of work 0027 temp fence to close gaps 1. West of the repat area a. Remove the existing chain link fence b.…
$0
Change Order
P00022 · DE-obligation of $859,679.00
-$859,679
Change Order
P00021 · Contract for border infrastructure fence replacement of ~2.25 MI in calexico, EL centro sector at calexico, CA. Reference no. R00021 / 0024 extended work…
$0
Change Order
P00020 · Calexico fence replacement 2 miles. 0017 resurvey and restake for road layout provide all materials, labor, and equipment to perform the following change:…
$0
Change Order
P00015 · Calexico fence replacement 2 miles. Redesign cost road. 1. Reduce the buffer zone between the fence and roadway shown on the dwgs from 10 feet to 2 feet and…
$0
Change Order
P00018 · Calexico fence replacement 2 miles. 0020 new northbound and sallyport area provide all materials, labor, and equipment to perform the following work: 1. The…
$0
Change Order
P00019 · Calexico fence replacement 2 miles. 0023 backfill east bank west of n bound lanes provide all materials, labor, and equipment to perform the following work:…
$0
Change Order
P00017 · Calexico fence replacement 2 miles. A. Scope of work 0022 extended stem wall. Provide all materials, labor, and equipment to perform the following work:…
$0
Change Order
P00016 · Calexico fence replacement 2 miles. Redesign cost. Wall foundation. Provide all materials, labor, and equipment to redesign wall foundation and support for…
$0
Change Order
P00013 · Calexico fence replacement 2 miles. R00009 - 0014 elevation changes-revise wall foundation provide all equipment, material, and labor to perform the following…
$0
Change Order
P00014 · Calexico fence replacement 2 miles. R00014 0011 fireworks box at lpoe provide all materials, labor and equipment to perform the following work: dispose of the…
$0
Change Order
P00011 · Calexico fence replacement 2 miles. 0012 additional directional drilling provide material, labor, and equipment for additional directional borings for the fiber…
$0
Change Order
P00004
$0
Change Order
P00010 · Contract for border infrastructure fence replacement of ~2.25 MI in calexico, EL centro sector. At calexico, CA. Reference no. R00010 / 0015 sheet piling…
$0
Change Order
P00012 · IT is understood and agreed that pursuant to the above, the contract time is not affected, and the contract price is increased as stated above, which reflects…
$0
Change Order
P00006 · Calexico fence replacement 2 miles. R00007 - 0006 removal of mexican fill & retaining wall provide all materials, labor and equipment to remove fill and…
$0
Change Order
P00005 · Contract for border infrastructure fence replacement of ~2.25 MI in calexico, EL centro sector. At calexico, CA. Reference no. R00006 / 0005 bridge footing…
$0
Change Order
P00007 · 0008 southbound road protection and ramp provide all materials, labor and equipment to complete the following: composite plates: provide composite plates to…
$0
Change Order
P00008 · Calexico fence replacement 2 miles. R00009 - 0009 pedestrian gate at sallyport the contractor shall provide all labor, material and equipment necessary to…
$0
Change Order
P00003 · Contract for border infrastructure fence replacement of ~2.25 MI in calexico, EL centro sector at calexico CA. Reference no. R00003 / 00004 additional…
$0
Additional Work (new agreement, FAR part 6 applies)
P00002
$322,374
Supplemental Agreement for work within scope
P00001
$7,102,416
Original award
$10,978,795
Show all 30
About this award
Written by GovTribe AI
·
This is a firm-fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE) Fort Worth District to SWF Constructors, a self-certified small disadvantaged business, for the Calexico Fence Replacement 2 Miles project. The contract has a ceiling value of $24,181,802.00 and a completion date of September 23, 2019. The contract is not set aside for any specific program. SWF Constructors was selected to perform this construction work for the USACE, which is a defense agency.
Quick answers
Who was awarded contract W9126G18F0038?
W9126G18F0038 was awarded to SWF Constructors by ENDIST Fort Worth (US Army Corps of Engineers) on November 8, 2017.
How much is contract W9126G18F0038 worth?
The government has obligated $20,513,725 on W9126G18F0038. Its current value, with exercised options, is $22,494,334. Its potential value, with all options, is $24,181,802.
Is contract W9126G18F0038 an order under another contract?
Yes. W9126G18F0038 is a delivery order under W9126G18D0010, an indefinite delivery contract.
Was contract W9126G18F0038 competed?
The extent of competition for W9126G18F0038 was full and open competition after exclusion of sources. The government received 3 offers.