Design and renovate buildings 613, 606, 605, 606B, and 607B at fort SAM houston, SAN antonio texas

Ended Awarded Last action

Contract number
0002
Awardee
Awarding agency
Obligated
$25,766,814

Award facts

Opportunity
Contract value 100% obligated
$25,766,814.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y299 Contruct/All Other Non-Bldg Facs
Set-aside
No set-aside
Competition
Full and Open Competition · 10 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
JBSA FT SAM HOUSTON, TX 78234, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Other Administrative Action 20 · Design renovate 613,606,605,606B,607B modification to add/update davis-bacon wage determination rates. $0
Supplemental Agreement for work within scope 19 · Design renovate 613,606,605,606B,607B scope of work MJ038 sidewalk change sidewalks between small buildings as shown on IFC drawing sheet C-2.00 shall not be… $0
Supplemental Agreement for work within scope 18 · 1. Floor control valves for fire sprinkler: provide (2) add¿L floor control valves for the fire sprinkler system. RFP requires a control valve per floor;… $72,250
Supplemental Agreement for work within scope 17 · The existing CPS energy three-phase, overhead primary electrical distribution system running north & south along the east side of area 600 buildings-long… $559,676
Supplemental Agreement for work within scope 16 · Remove & replace existing sidewalks between bldgs a & B that connect the parking lot to the parallel sidewalk behind the long barracks. Reason-the existing… $88,025
Supplemental Agreement for work within scope 15 · Remove & replace existing storm & sewer lines with SDR 26 pipe as noted on civil plan C-4.00. Work to include removal of existing pipe. Connect new pipe to… $410,518
Supplemental Agreement for work within scope 14 · (1)construct a system of curb inlets & underground piping to pick up the runoff from the buildings, areas around the buildings & large parking lot area. Reason:… $458,192
Supplemental Agreement for work within scope 13 · Reason for added toilet- the RFP indicated only one toilet fixture per gender/floor. The revised plan indicates two fixtures (to accommodate the occupancy which… $189,265
Other Administrative Action 12 · This modification extends the time for performance allowed under specification section 01 10 01 for delays caused by adverse weather in excess of anticipated… $0
Supplemental Agreement for work within scope 11 · Item 1¿fire detectors @ annunciator panels:provide fire detectors @ annunciator panels & fire alarm panels.the 2010 version of the nfpa requires a detector to… -$591
Other Administrative Action 10 · Corrects 000209 - $140,000 more than the modification was added to PD2 on MOD 000209 and the funding was removed due to close of the fiscal year. This MOD… -$140,000
Change Order 9 · Design renovate 613,606,605,606B,607B $280,000
Supplemental Agreement for work within scope 8 · Item 1. Load /bearing walls @ south end of each typical bldg remove load bearing wall framing & replace with engineered beam & columns. Item 2. Load bearing… $41,820
Supplemental Agreement for work within scope 7 · User requested change: delete two folding accordion partitions & in their place provide one, approximately 22' wide, operable partition with vinyl finish… -$2,345
Supplemental Agreement for work within scope 6 · Engineering change: delete 50KW standby generator & automatic transfer switch @ bldg. 606B. Delete associated conduit, wiring, housekeeping pad & masonry… -$39,792
Supplemental Agreement for work within scope 5 · Engineering change to remove the existing brick enclosure on the east side of the building that is approximately 9' X 13'X 7' tall that appears to have been a… $3,200
Supplemental Agreement for work within scope 4 · Reason:differing site conditions original scope of work called for removal of one layer of VAT flooring. This was typical for all bldgs except 603 & 610. Remove… $23,479
Supplemental Agreement for work within scope 3 · Necessity of change: a survey of bldg 606B & 607B was not included with the regulated materials inspection report, 600 block bldgs, FT. SAM houston, dated… $22,784
Supplemental Agreement for work within scope 2 · Value engineering change to delete the government field office called for under the contract specification paragraph 01 52 00.00 44. Reason: not needed -$7,500
Supplemental Agreement for work within scope 1 · Delete bid item #38/option #7 (additional cost to base to execute the project without a construction bubble. The construction bubble requirement is preferred,… -$50,000
Original award $23,857,833
Show all 21

Quick answers

Who was awarded contract 0002?

0002 was awarded to RKJ Construction Inc. by ENDIST Fort Worth (US Army Corps of Engineers) on September 30, 2009.

How much is contract 0002 worth?

The government has obligated $25,766,814 on 0002.

Is contract 0002 an order under another contract?

Yes. 0002 is a delivery order under W9126G08D0084, an indefinite delivery contract.

Was contract 0002 competed?

The extent of competition for 0002 was full and open competition. The government received 10 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award