Delivery Order W9126G07D0045-0014
Award Date 9/10/08
Potential Completion Date 10/25/08
Potential Value $14K
Federal Agency
Awardee
Ultimate Awardee
Not listed NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Jasper, TX 75951, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
5
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The U.S. Army Corps of Engineers awarded a firm fixed price, definitive contract to The Penna Group, LLC, a minority-owned small disadvantaged business, to replace a 48-inch low-flow butterfly gate at the Ray Roberts Dam in Pilot Point, Texas. The $521,069.47 contract includes the installation of a motorized gate that can be controlled from the vault or outlet works tower, as well as the construction of new concrete equipment pads and a sunshield. This contract was awarded as an 8(a) sole...
- This federal contract was awarded by the U.S. Army Corps of Engineers to Kovilic Construction Co Inc., a for-profit small business organization, to perform concrete repair work on the damaged portions of the ogee spillway structure. The $243,000.00 firm fixed-price contract will involve cutting and preparing a clean surface in order to place new concrete, with a completion date of January 10, 2021. This contract award appears to be a standalone project and not part of a larger contract...
- The Army Corps of Engineers Engineering District Sacramento awarded Shimmick Construction Company, Inc. a $970,900 firm-fixed-price contract to complete Phase 2 of the Tule River/Success Lake Spillway Enlargement Project in Porterville, California. The scope of work involves constructing a 10-foot high, 350-foot long curved reinforced concrete ogee weir across Success Lake spillway, as well as associated side walls, a downstream apron, spillway widening, excavations using blasting and equipment,...
- The U.S. Army Corps of Engineers Engineering District New Orleans awarded a $2.01 million firm fixed price contract to Tarpan Construction, LLC for painting spillway bays 124 through 153. The work will be performed in Laplace, Louisiana under an 8(a) sole source set aside designation. As part of its civil works mission, the Army Corps maintains flood control infrastructure such as spillways. This contract supports spillway maintenance and is expected to be completed by April 2023. No major...
- The Department of the Interior Bureau of Reclamation awarded a $3.8 million firm fixed price contract to NW Construction, Inc. to repair concrete at the Alcova Dam spillway in Casper, Wyoming. The work involves restoring damaged concrete surfaces at the spillway, as outlined in Solicitation ALCOVA DAM SPILLWAY CONCRETE REPAIR. The Bureau of Reclamation seeks these repairs to maintain the integrity of the spillway. The contract has a period of performance through December 2021. It is set aside...
- The U.S. Army Corps of Engineers (USACE) Engineering District Sacramento awarded a $56,003,096.47 firm-fixed-price construction contract to Michels Construction, Inc. for the Tule River Basin Phase 2 project. The contract involves constructing a 10-foot high, 350-foot long reinforced concrete weir across the Success Lake spillway, as well as associated site work including widening the spillway, excavation, rock anchor installation, trench drain construction, and flood-proofing of recreation...
- This is a firm fixed price delivery order issued under Contract W912DY08D0026 by the U.S. Army Corps of Engineers (USACE) to The Clement Group LLC, a minority-owned small business based in Alabama. The $4,294,189.92 contract is for the construction effort of the Rend Lake Spillway project, which includes replacing doors and frames, repairing sewer lines and water mains, and upgrading the electrical system at the USACE project office in Benton, Illinois. The work is being performed under the ARRA...
- The U.S. Army Corps of Engineers, Engineering District Omaha, awarded a $5.4M firm fixed-price contract to Royal Bridge, Inc., a small disadvantaged business based in Palm Harbor, Florida, for repair and painting services at the Gavins Point Spillway in Yankton, South Dakota. The contract, awarded November 8, 2024, with an ultimate completion date of May 21, 2026, is set aside exclusively for small businesses under NAICS code 237990 (Heavy and Other Civil Engineering Construction). Royal...
- The U.S. Army Corps of Engineers awarded a $280,153.92 firm fixed price delivery order to Lake Contracting, Inc. of Benton, Illinois for resurfacing the auxiliary spillway dam's west service boat ramp in Benton. No set-aside designation was applied to this contract. Work is to be completed by November 30, 2020 to restore the boat ramp, supporting the Corps' mission to maintain navigability of waterways and flood protection infrastructure. As the prime contractor, Lake Contracting will be...
- HDR GEI Joint Venture, a strategic partnership between HDR, Inc. and CH2M, was awarded a $2.67 million firm fixed-price delivery order on September 22, 2025, to update Water Control Manuals (WCM) for Oroville Dam in Oroville, California and New Bullards Bar Dam in Dobbins, California. The contract is funded by the U.S. Army Corps of Engineers, Sacramento District (ENDIST Sacramento) and is scheduled for completion by November 27, 2027. This delivery order was issued without a set-aside...
- W9126G07D0045Indefinite Delivery Contract
- W9126G07D0045-0014Delivery Order
RAY ROBERTS UNCONTROLLED SPILLWAY REPAIR
Posted 9/10/08
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 1 | Change Order | ($4k) | 4/6/12 | |
| Not listed | Not listed | $17.6k | 9/10/08 |