Delivery Order W5J9JE10D0004-0005
Award Date 1/20/11
Potential Completion Date 3/21/12
Potential Value $4.9M
Federal Agency
Ultimate Awardee
Not listed PSC Category
Not listed Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Afghanistan
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
2
Legislative Mandate
Not listed National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The U.S. Army Corps of Engineers awarded a $6.94 million firm fixed-price contract to Rod Transport Inc. (doing business as Rod Construction) on June 5, 2023, for Phase II of the Dry Creek Ecosystem Restoration Project near Healdsburg, California. The contract, designated as a HUBZone set-aside, includes additional erosion control work as part of the broader ecosystem restoration initiative. Rod Transport Inc., an SBA-certified 8(a) small disadvantaged business and Hispanic American-owned...
- The U.S. Army Corps of Engineers awarded a $5.94 million firm fixed-price definitive contract to Advancia Remediation Services, LLC for the MCL Fish Passage Low Flow Channel Notching Phase 2 and City Culvert Bypass Piping project in Walla Walla, Washington. The contract, awarded on June 15, 2024, with an ultimate completion date of November 30, 2025, is designated as an 8(a) sole source set-aside, restricting competition to small disadvantaged businesses certified under the Small Business...
- Granite Construction Company was awarded a $48.4 million firm fixed price contract by the U.S. Army Corps of Engineers on June 23, 2023, for the construction of flood risk mitigation infrastructure in Wharton, Texas. The project encompasses the construction of approximately 12,350 feet of earthen levees averaging 8 feet in height along the Colorado River across three levee reaches and associated sump facilities. The scope of work includes interior drainage improvements such as box culverts,...
- Precision Construction LLC was awarded a $1,033,312 definitive firm fixed price construction contract by the United States Department of Agriculture National Resources Conservation Service Southeast Region to provide emergency watershed protection and stabilization services at four sites located in Hattiesburg, Forrest County, Mississippi. The contract will fund streambank stabilization work including earthfill, rock riprap, geotextile, concrete grout, and articulated mat installation to protect...
- Wadley Construction, Inc. was awarded a $2.5 million firm fixed price delivery order against a multiple award indefinite-delivery/indefinite-quantity (IDIQ) contract by the Department of the Interior Bureau of Reclamation. The delivery order is for civil site work with a period of performance through September 2026. No set-aside provisions were applied to this award. The Bureau of Reclamation oversees water and power infrastructure in the western United States, so this delivery order is likely...
- The U.S. Army Corps of Engineers Baltimore District awarded a $20.96 million firm fixed-price definitive contract to W.M. Schlosser Co., Inc. on September 5, 2023, for flocculation and sedimentation basin improvements at the Washington Aqueduct water treatment plant in Washington, DC. The project scope includes structural concrete repairs, modifications to existing framing and stairs, replacement of flocculators and residuals collection systems in basins 3 and 4, and installation of process...
- Seamair Construction, Inc., a Hispanic American-owned small disadvantaged business based in San Luis Obispo, California, was awarded a $3.5 million firm fixed-price definitive contract by the Army Corps of Engineers, Los Angeles District (ENDIST Los Angeles), on October 31, 2025. The work, to be performed in Corona, California, involves establishing a vegetation-free zone with a new multi-stage riprap swale, control structure, and junction, along with surveying and environmental controls to...
- The Department of the Interior Bureau of Reclamation awarded a $536,000 purchase order to The Westervelt Company's Westervelt Ecological Services Division for the delivery of 3.35 mitigation bank credits from the Cosumnes Floodplain Mitigation Bank in Gold River, California. The credits are required by DOI to offset environmental impacts from construction work on the Nimbus Dam fish passageway project. The sole-source award to Westervelt was in accordance with the Army Corps of Engineers Clean...
- The U.S. Army Corps of Engineers (USACE) Engineering District Sacramento awarded a $56,003,096.47 firm-fixed-price construction contract to Michels Construction, Inc. for the Tule River Basin Phase 2 project. The contract involves constructing a 10-foot high, 350-foot long reinforced concrete weir across the Success Lake spillway, as well as associated site work including widening the spillway, excavation, rock anchor installation, trench drain construction, and flood-proofing of recreation...
- This contract award, W912EQ15C0016, was made by the U.S. Army Corps of Engineers to Wadley Construction, Inc., a veteran-owned and service-disabled veteran-owned small business based in Las Vegas, Nevada. The $188,970.59 firm-fixed-price contract is for the provision of "R650 RIPRAP" services, which likely refers to some type of construction or repair work involving riprap (large stones used for erosion control). The contract has a completion date of November 28, 2015 and was set aside...
- W5J9JE10D0004Indefinite Delivery Contract
- W5J9JE10D0004-0005Delivery Order
CONSTRUCTION WADI MITIGATION
Posted 1/22/11
ContractNumber | Description | Subcontractor | Prime Award | Dollars Obligated | Updated At |
|---|---|---|---|---|---|
P007239S | S & B Infrastructure LTD | Delivery Order W5J9JE10D0004-0005 | $136.0k | 7/28/12 | |
P000422S | Faizi Masroor Construction Co Mpany | Delivery Order W5J9JE10D0004-0005 | $3.6m | 12/10/11 | |
P000007S | Unique Builders Construction Company | Delivery Order W5J9JE10D0004-0005 | $3.3m | 3/19/11 |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 3 | Close Out | ($200k) | 8/30/16 | |
| 2 | Other Administrative Action | $0 | 3/10/14 | |
| 1 | Change Order | ($703k) | 2/6/12 | |
| Not listed | Not listed | $5.8m | 1/22/11 |