Task order - statement of work (SOW) task title: flightdeck interval management (FIM) display elements, information,&annunciations database extension 1.0 introduction/background: flightdeck interval…

Ended Awarded Last action

Contract number
NNL14AA67T
Awardee
Awarding agency
Obligated
$69,894

Award facts

Contract value 100% obligated
$69,894.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Full and Open Competition · 1 offer Multiple Award, Fair Opportunity
Pricing
Cost Plus Fixed Fee
Place of performance
Minneapolis, MN 55422, USA

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Other Administrative Action 2 $519
Other Administrative Action 1 -$519
Original award $69,894

Description

Task order - statement of work (SOW) task title: flightdeck interval management (FIM) display elements, information,&annunciations database extension 1.0 introduction/background: flightdeck interval management (FIM) operations, as described in the federal aviation administrations (FAA) next generation air transportation system (nextgen), aim to increase efficiency of operations by improving the consistency of inter-arrival rates. In the proposed FIM concept of operations, an aircraft that is equipped with ADS-b may be cleared by a controller to achieve and/or maintain an interval relative to another aircraft. Pilots are provided with a speed target and a location at which to achieve this speed (the achieve-by point), and a traffic-to-follow (TTF) aircraft identifier in order to achieve this interval. FIM operations are purported to increase throughput, reduce tactical maneuvering (especially vectoring), reduce controller workload, and reduce environmental impact by enabling optimized profile descents (AKA continuous descent arrivals). Future concepts of operations envision reduced interaction with controllers and increased automation. The question at hand is how technology, procedures, and pilot training should be designed to effectively support FIM operations. In recent years, FIM research has been conducted at NASA langley under the airspace systems program and at a small number of other laboratories and institutions. Under the prior NASA flight critical systems research (fcsr) contract / task order (i.e., NNL06AA05B, task order NNL13AB30T), NASA and the FAA sponsored the development of a citation database and associated multimedia relational database of FIM literature and flight deck interface design concepts. The objective of that prior award was to provide tools to the research community such that future research could benefit from a common and accessible repository of prior efforts, to facilitate comparison and summarization of research results, and to encourage the future incorporation of research results and design concepts in this repository. As part of the previous task order NNL13AB30T, NASA and the FAA identified additional functionality that would be beneficial to the research community. This new effort will augment the prior development of the literature database and the FIM concepts database. 2.0 scope & objective(s): 2.1 the scope of this effort is to augment the literature database and the FIM concepts database previously developed under task order NNL13AB30T, as defined by the specific tasks below. 2.2 the objective of this task order is to deliver updated databases and associated user interface mechanisms, extend the concepts and tools, provide presentation material, and develop a software migration plan for the aforementioned FIM literature and concepts database. 3.0 description of the work/tasks to be performed: the contractor shall perform the following tasks: 3.1 update database content & ensure version information available 3.1.1 at a minimum, the contractor shall conduct online database searches and contact research institutions/persons (with CC to tech POC) currently included in the databases to obtain publications and research notes completed since the prior literature review conducted under task order NNL13AB30T. Contacts accessed and results of this review {e.g., citations, papers (unless limited by copyright), presentations} shall be delivered (deliverable 4.2). 3.1.2 the contractor shall incorporate new reference documents in the literature database and new FIM concepts in the concept database to update the contents. If more than 20 reference documents and designs are identified, and if more than 3 additional concepts are identified, the NASA technical point of contact (tech POC) will communicate via email to the contractor PI the selected items to include. 3.1.3 the contractor shall ensure that users can

Quick answers

Who was awarded contract NNL14AA67T?

NNL14AA67T was awarded to Honeywell International Inc. by Langley Research Center (National Aeronautics and Space Administration) on February 20, 2014.

How much is contract NNL14AA67T worth?

The government has obligated $69,894 on NNL14AA67T.

Is contract NNL14AA67T an order under another contract?

Yes. NNL14AA67T is a delivery order under NNL13AA04B, an indefinite delivery contract, on Flight Critical Systems Research.

Was contract NNL14AA67T competed?

The extent of competition for NNL14AA67T was full and open competition. The government received 1 offer.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award