Delivery Order NNL10AA04B-NNL12AA10T

Award Date 10/20/11
Potential Completion Date 12/31/11
Potential Value $34K
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Cost Plus Fixed Fee
Place of Performance
Calverton, MD 20705, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
1
Legislative Mandate
Not listed
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This federal contract award was issued by the National Aeronautics and Space Administration (NASA) Langley Research Center to ATK Space Systems Inc., a division of Northrop Grumman Corporation, to conduct an analytical study on the allowable run time for the 8-Foot High Temperature Tunnel (8 HTT) mixer liner and Mach 5 High Dynamic Pressure (M5HIQ) nozzle at temperature levels exceeding the nominal design. The $1,430,731.11 cost-plus-fixed-fee task order is not set aside and is part of the...
This is a $199,694 firm-fixed-price purchase order awarded by the National Aeronautics and Space Administration (NASA) to Analytical Services & Materials, Inc. (AS&M), a woman-owned small business, under the Small Business Innovation Research (SBIR) Program Phase III. The purpose of this task is to develop a computational simulation of the key components of the National Transonic Facility (NTF), a high Reynolds number cryogenic transonic wind tunnel operated by NASA. The simulation...
This is a task order contract awarded by the Marshall Space Flight Center, a civilian agency within NASA, to Kratos Sre, Inc., a subsidiary of Kratos Defense & Security Solutions, Inc. The $65,999 task order is for "Materials Testing Supporting Integral Throat Entrance for Solid Rocket Motors Investigation." This task order is part of a larger $10 million single-award Indefinite Delivery Contract (IDC) issued by the Marshall Space Flight Center for testing and analysis of launch...
This task order was awarded by the National Aeronautics and Space Administration (NASA) Langley Research Center to The Boeing Company under the Basic and Applied Aerospace Research and Technology (BAART) Indefinite Delivery/Indefinite Quantity (IDIQ) contract vehicle. The objective of this $558,048.00 Cost Plus Fixed Fee task order is to evaluate Flexible Thermal Protection System (FTPS) layups and materials at simulated atmospheric reentry flight conditions using an arc jet test facility for...
This is a Cost Plus Fixed Fee task order awarded by the National Aeronautics and Space Administration (NASA) Langley Research Center to Cornell Technical Services LLC, a small business located in Columbia, Maryland. The purpose of the task order is to develop a Safety Analysis Report (SAR) for the Mars 2020 project, which will document the response of space nuclear power sources to potential launch and reentry accident scenarios, and quantify the associated radiological risks. The SAR and...
NASA Langley Research Center awarded a $148,690 firm-fixed-price delivery order to Advanced Technologies, Inc. (ATI), a small business, for the fabrication of a Hypersonic International Flight Research Experiment 5A (HIFIRE-5A) model made of 15-5 stainless steel. This order is part of the Reliance Consolidated Models V (RECOM V) indefinite-delivery, indefinite-quantity (IDIQ) contract held by ATI with NASA Langley. ATI is an aerospace engineering company that specializes in designing and...
This contract was awarded by the National Aeronautics and Space Administration (NASA) Langley Research Center to Advanced Technologies, Inc. (ATI), a small business, to design, analyze, and fabricate a multi-propeller model system to be incorporated with an existing mobile model test stand for the Low Speed Aeroacoustic Wind Tunnel (LSAWT). The $150,050.00 firm fixed-price delivery order is part of the Reliance Consolidated Models IV (RECOM IV) indefinite-delivery/indefinite-quantity (IDIQ)...
This is a firm fixed-price purchase order awarded by the National Aeronautics and Space Administration (NASA) Shared Services Center to Westmoreland Mechanical Testing & Research, Inc. (Wmt&R), a for-profit subchapter S corporation, for tensile and fatigue cryogenic and elevated temperature mechanical testing. The period of performance is from the date of award to 12 weeks after material arrival, with a potential value of $190,121.41. The contract does not have a set-aside...
This federal contract award, with ID NNL16AA02B|80LARC17F0069, was issued by the Langley Research Center, a civilian agency, to Alliant Techsystems Operations LLC, a subsidiary of Northrop Grumman Corporation. The scope of this $9,589,904.00 cost-plus-fixed-fee delivery order is to procure materials and fabricate an 8-foot high temperature Mach 6 nozzle. This nozzle is a component required for a larger research and technology development effort, specifically the Basic and Applied Aerospace...
This is a cost-plus-fixed-fee delivery order contract awarded by NASA Langley Research Center to Advanced Technologies, Inc., a small business aerospace engineering company based in Newport News, Virginia. The contract is for the design and analysis of a 3-rotor blade section that will be used to investigate transonic drag rise and avoid dynamic stall on a general rotor model system in wind tunnel testing. This is a preliminary design effort to help the government understand the practical...
  • NNL10AA04B
    Indefinite Delivery Contract
  • NNL10AA04B-NNL12AA10T
    Delivery Order

SMAAART TASK ORDER: SOW TASK TITLE: WELD REPAIR THERMAL AND STRUCTURAL ANALYSIS FOR THE MACH 5 HIGH DYNAMIC PRESSURE NOZZLE AT NASA LANGLEYS 8 HIGH TEMPERATURE TUNNEL 1.0 INTRODUCTION/BACKGROUND: THE 8 HIGH TEMPERATURE TUNNEL (HTT) AT NASA LANGLEY RESEARCH CENTER (LARC) IS A TRUE ENTHALPY, TRUE PRESSURE, BLOW-DOWN, HYPERSONIC TEST FACILITY THAT IS UTILIZED BY RESEARCH ENGINEERS TO PERFORM HYPERSONIC AEROTHERMODYNAMIC AND PROPULSION SYSTEM TESTING. THE FACILITY PROVIDES TEST CONDITIONS AT MACH 7, MACH 5, MACH 4, AND MACH 3. FOR TESTING AT EACH MACH NUMBER, SEPARATE CONVERGING-DIVERGING NOZZLES ARE REQUIRED TO BE INSTALLED. EACH FACILITY CUSTOMER SELECTS THEIR DESIRED TEST CONDITION AT THE NOMINAL MACH NUMBER AND THE FACILITY STAFF DETERMINES WHAT CONTROLLED CONDITIONS ARE REQUIRED TO MEET THE CUSTOMER S OBJECTIVES. ONE OF THE CONVERGING-DIVERGING NOZZLES AVAILABLE FOR USE BY THE FACILITY CUSTOMERS IS DESIGNATED THE MACH 5 HIGH DYNAMIC PRESSURE NOZZLE (M5HIQ). THIS NOZZLE WAS DESIGNED AND BUILT BY ATK UNDER NASA CONTRACT/TASK ORDER NNL05AA06B, NNL06AA60T. THIS NOZZLE IS REQUIRED TO CONDUCT MISSILE RADOME TESTING BY THE NAVAL AIR WARFARE CENTER AND IS ALSO REQUIRED FOR FUTURE TESTING OF HYPERSONIC ENGINES. RECENTLY, DAMAGE IN THE FORM OF A LARGE SURFACE CRACK WAS FOUND ON THE M5HIQ NOZZLE. THIS LARGE CRACKED HAS CAUSED THE FACILITY TO HALT TESTING OPERATIONS FOR THE NAVAL AIR WARFARE CENTER. BECAUSE THE NOZZLE IS SUBJECTED TO EXTREME TEMPERATURES DURING OPERATION, THE CRACK MUST BE REPAIRED PRIOR TO RESUMING TESTING OPERATION REQUIRING THAT PARTICULAR NOZZLE. NASA WILL CONTRACT THROUGH ITS FABRICATION DIVISION FOR THE WELD REPAIR OF THE NOZZLE CRACK ONCE THE THERMAL / STRUCTURAL ANALYSIS REQUIRED UNDER THIS SOW IS COMPLETED. THIS SOW ANALYSIS WILL REQUIRE RESEARCHING THE INCONEL 800H BASE METAL AND THE WELD FILLER METAL MATERIAL PROPERTIES AT ELEVATED TEMPERATURES AND PERFORMING THERMAL AND STRUCTURAL ANALYSIS OF THIS WELD JOINT TO ESTIMATE THE LOW CYCLE FATIQUE LIFE OF THE REPAIRED NOZZLE. THE WELD JOINT EXPERIENCES TRANSIENT MECHANICAL PRESSURE LOADING COUPLED WITH EXTREME THERMAL TRANSIENTS WHICH COMBINE TO MAKE THIS ANALYSIS COMPLEX. IN ADDITION, THE DATABASE FOR THESE MATERIALS ARE EXPECTED TO BE INCOMPLETE, SO TECHNICAL REASONING BASED ON THE BEST AVAILABLE DATA WILL BE REQUIRED TO COMPLETE THE EFFORT. THE ANALYSIS OF THE WELD JOINT IS REQUIRED TO MEET NASA SAFETY STANDARD LPR 1710.15. THE M5HIQ NOZZLE WAS ORIGINALLY DESIGNED BY ATK-GASL AND THEY POSSESS FEM GRIDS, TUNNEL OPERATING CONDITIONS, AND OTHER THERMAL AND STRUCTURAL ANALYSIS TOOLS THAT CAN BE UTILIZED TO EVALUATE THE WELD REPAIR LOW CYCLE FATIQUE LIFE. THIS ANALYSIS IS CRUCIAL TO THE SAFE RETURN TO TESTING OPERATIONS FOR THE NAVAL AIR WARFARE CENTER. 2.0 SCOPE/OBJECTIVES: THE SCOPE OF THIS TASK ORDER IS TO CONDUCT A THERMAL AND STRUCTURAL ANALYSIS OF THE REPAIR WELD JOINT LOCATED IN THE NASA LARC 8 HTT. THE OBJECTIVE(S) OF THIS TASK ORDER ARE TO: DELIVER A REPORT SHOWING THE LOW CYCLE FATIQUE LIFE FOR THE WELD REPAIR DEPICTED IN THE GOVERNMENT-FURNISHED DRAWING (GFI 5.1). 3.0 DESCRIPTION OF THE WORK/TASKS TO BE PERFORMED: THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASKS: 3.1 THERMAL / STRUCTURAL ANALYSIS REPORT: 3.1.1 THE CONTRACTOR SHALL CALCULATE THE LOW CYCLE FATIGUE (LCF) LIFE OF THE NOZZLE USING THE GOVERNMENT FURNISHED DRAWING NASA LD-1268149 M5HIQ WELD REPAIR DRAWING (GFI 5.1) DEPICTING THE WELD REPAIR JOINT GEOMETRY. THE CONTRACTOR SHALL USE THE THERMAL AND STRUCTURAL LOADS FROM THE ORIGINAL NASA CONTRACT/TASK ORDER NNL05AA06B, NNL06AA60T. CONCURRENTLY, NASA WILL BE EXECUTING THE WELD REPAIR. THE CONTRACTOR SHALL CALCULATE THE LCF OF THE WELD REPAIR UNDER THE FOLLOWING TWO CONDITIONS: 3.1.1.1 NO NON-DESTRUCTIVE INSPECTION OF THE WELD JOINT IS CONDUCTED DURING THE WELDING. 3.1.1.2 100% X-RAY INSPECTION OF THE WELD JOINT IS CONDUCTED AFTER COMPLETION OF THE WELDING.

Posted 10/20/11, 12:00 AM