Other functions. NASA has been implementing joint confidence level (JCL) since 2009. JCL formal policy, as written in NPR 7120.5E, states that projects are required to perform a JCL with the intent…

Ended Awarded Last action

Contract number
NNH12CG18D
Awardee
Awarding agency
Obligated
$37,710

Award facts

Contract value 100% obligated
$37,710.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Not Competed · 1 offer Only One Source
Pricing
Cost Plus Fixed Fee
Place of performance
El Segundo, CA, USA

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Other Administrative Action 1 · NASA has been implementing joint confidence level (JCL) since 2009. JCL formal policy, as written in NPR 7120.5E, states that projects are required to perform a… $0
Original award $37,710

Description

Other functions. NASA has been implementing joint confidence level (JCL) since 2009. JCL formal policy, as written in NPR 7120.5E, states that projects are required to perform a JCL with the intent that projects come in at 70% confidence. This 70% confidence is loosely based on work performed by CAD to understand the 'portfolio effect' of funding projects probabilistically with only respect to cost. Study would build on existing work to parametrically investigate the effect of funding projects at different confidence levels to examine if there is an 'optimal' confidence level to fund a portfolio of missions. 1. Contractor shall perform portfolio analysis on 3 hypothetical portfolios. A. Portfolio that is characteristic of current environment b. Portfolio that is flagship centric c. Portfolio where projects are all projects are relativity equal in size 2. Contractor shall use the sand chart tool, an existing methodology developed for portfolio assessments, to model portfolios that would be varied parametrically from 50% to 90% in 5% increments to determine which project confidence level posture performs the best portfolio effect. Portfolio effects will be measured as follows: a. Equal content, variable cost: cost to implement all total portfolio b. Equal content, variable time: time to launch total portfolio c. Equal time, variable content: number of missions launched in a x year period d. Program volatility: percentage of time that missions exceed the 15% cost growth or 6-month schedule growth threshold breach requirement 3. Contractor shall examine (3) various program/directorate reserve strategies. This task is similar to task 2, with the augmentation that there would be a directorate 'bank' that would hold values between a protect confidence level and the allocated funding confidence level. The strategies will be 'measured' consistently as task 2. One trip for one individual, 3 months after award, to washington D.C. To present findings.

Quick answers

Who was awarded contract NNH12CG18D?

NNH12CG18D was awarded to The Aerospace Corporation by Headquarters (National Aeronautics and Space Administration) on September 20, 2012.

How much is contract NNH12CG18D worth?

The government has obligated $37,710 on NNH12CG18D.

Is contract NNH12CG18D an order under another contract?

Yes. NNH12CG18D is a delivery order under NNH11CD21B, an indefinite delivery contract.

Was contract NNH12CG18D competed?

The extent of competition for NNH12CG18D was not competed. The government received 1 offer.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award