Task 2.1 design of the nozzle joint ATK tasks (WBS 2.0) begin with a design for the nozzle joint. ATK shall develop a mechanical design of sufficient detail for thermal and structural analysis of…
Ended Awarded
- Contract number
- NNC15TA48T
- Awardee
-
Alliant Techsystems Operations LLC UEI N9L2KCDZLN81 Part of Northrop Grumman Innovation Systems LLC
- Awarding agency
-
Glenn Research Center
National Aeronautics and Space Administration
- Obligated
- $49,421
Award facts
- Contract value 100% obligated
- $49,421.00 Current and potential, with all options
- Completion date 100% complete
-
- Current, with exercised options
- Potential, with all options
- NAICS code
- 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- PSC
- AR13 Space R&D Services; Space Flight, Research And Supporting Activities; Experimental Development
- Set-aside
- No set-aside
- Competition
- Full and Open Competition · 1 offer Multiple Award, Fair Opportunity
- Pricing
- Cost Plus Fixed Fee
- Place of performance
- Lake Ronkonkoma, NY 11779, USA
- Legislative mandates
-
- Walsh-Healey Public Contracts Act FAR subpart 22.6
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Modification | $49,421 | |
| Close Out | $0 |
Description
Task 2.1 design of the nozzle joint ATK tasks (WBS 2.0) begin with a design for the nozzle joint. ATK shall develop a mechanical design of sufficient detail for thermal and structural analysis of the joint. The mechanical design part files shall enable thermal/structural and computational fluid dynamics (CFD) analysts to work on a consistent geometry. Task 2.2 solid model of the nozzle extension at three different positions the NASA-optimized contours shall be used to develop the mechanical design of the nozzle extension. The pattern shall be laid out and mechanical designs shall be created for 3 different positions. These part files will be used in the CFD, thermal, and structural analyses of the nozzle extension in different nozzle shapes. These shapes will be used by NASA to determine the delivered ISP of the nozzle and to assess thermal and stress environments for the steady state operation. Task 2.3 preliminary evaluation of manufacturability the third part of ATK S task is a preliminary assessment of the manufacturability (availability of billets, approaches for handling such large parts, etc.).
Quick answers
Who was awarded contract NNC15TA48T?
NNC15TA48T was awarded to Alliant Techsystems Operations LLC by Glenn Research Center (National Aeronautics and Space Administration) on February 26, 2015.
How much is contract NNC15TA48T worth?
The government has obligated $49,421 on NNC15TA48T.
Is contract NNC15TA48T an order under another contract?
Yes. NNC15TA48T is a delivery order under NNC10BA03B, an indefinite delivery contract.
Was contract NNC15TA48T competed?
The extent of competition for NNC15TA48T was full and open competition. The government received 1 offer.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award