The Environmental Protection Agency Region 5 awarded a $536,562 firm fixed price delivery order to CH2M Hill, Inc. to conduct a pre-design investigation of the selected remedy defined in a focused feasibility study for a site located in Wayne, Michigan. CH2M Hill will perform the work over a 22-month period concluding in May 2022. Major subcontractors include Coleman Engineering Company for remediation services and Seaworks Group LLC for geophysical surveying and mapping services. The pre-design...
This is a task order awarded under the U.S. EPA Region 5's GREAT LAKES ARCHITECT AND ENGINEERING SERVICES (GLAES) II contract vehicle, with a ceiling value of $637,048.11. The task order is for pre-design investigation and remedial design support services related to the Monguagon Creek Upper Trenton Channel (MCUTC) site in Wayne County, Michigan. The prime contractor is Ch2M Hill, Inc., a large engineering and construction firm that provides environmental consulting, remediation, and...
The U.S. Army Corps of Engineers Engineering District Detroit awarded a Firm Fixed Price Delivery Order contract to URS Group, Inc. (doing business as URS) to provide engineering support services during the construction phase of the Sabin Dam Removal project in Madison Heights, Michigan. The potential value of the contract is $582,673.12, and it was awarded on March 12, 2018, with a completion date of March 6, 2020. URS is a subsidiary of the global design, engineering, and management firm...
This is a firm-fixed-price delivery order awarded by the Environmental Protection Agency (EPA) Region 9 to EA Engineering, Science, and Technology, Inc., PBC, a for-profit environmental consulting and engineering firm, for the purpose of preparing removal engineering design documents for a non-time critical removal action in Amador County, California. The award has a ceiling value of $24,976,591.34 and a completion date of January 27, 2025. No set-aside was used. Major subcontractors include...
This is a task order awarded under the EPA's Remedial Acquisition Framework: Design and Engineering Services (DES) contract, which is a $960 million Indefinite Delivery Vehicle (IDV) held by EA Engineering, Science, and Technology, Inc., PBC. The $1,742,645.54 task order provides for remedial investigation, feasibility study, and remedial design services at the former Eldorado Chemical Superfund site in Live Oak, Texas. The award was made to EA Engineering, a for-profit environmental...
This is a delivery order contract awarded by the U.S. Environmental Protection Agency (EPA) Region 9 to EA Engineering, Science, and Technology, Inc., PBC, a for-profit environmental consulting and engineering firm. The contract is for the Residential Removal Design (RD) of the Sulphur Bank Mercury Mine (SBMM) site in Clearlake Oaks, California. The contract, valued at $655,227.73, is a cost-plus-fixed-fee task order under the EPA's Remedial Acquisition Framework: Design and Engineering Services...
This is a $1,820,575 firm-fixed-price construction contract awarded by the U.S. Army Corps of Engineers (USACE) Detroit District to Great Lakes Dock And Materials, L.L.C., a certified Small Business Administration (SBA) HUBZone firm. The contract is for the repair and replacement of an offloading platform and trestle at the Saginaw Bay Confined Disposal Facility (CDF) in Essexville, Michigan. The work includes demolition, disposal, pile driving, and construction of a new replacement trestle...
This is a time-and-materials task order contract for remedial design services at the Ten-Mile Drain Superfund Site in St. Clair Shores, Michigan. The contract was awarded by the U.S. Environmental Protection Agency (EPA) Region 5 to Jacobs Engineering Group Inc., a large engineering and professional services firm, with a ceiling value of $2,768,210.24. The contract is part of the EPA's Superfund and Great Lakes Architecture & Engineering Services (SFGLAES) program and will support the...
The U.S. Army Corps of Engineers, Detroit District awarded Luedtke Engineering Company a $2,010,849 firm fixed price contract to perform maintenance dredging of the Saginaw River federal navigation channel in Bay City, Michigan. The solicitation sought a contractor to mobilize dredging equipment to the site and dredge between station numbers 80+00 Bay and 174+00 Bay, optionally between 76+00 Bay and 80+00 Bay, placing up to 180,000 cubic yards of dredged material in the Saginaw Bay Confined...
This federal contract is a delivery order awarded by the U.S. Environmental Protection Agency (EPA) Region 10 to the prime contractor CH2M Hill, Inc. under the EPA's Remedial Acquisition Framework: Design and Engineering Services (DES) indefinite delivery/indefinite quantity (IDIQ) contract. The $2,034,364.25 award is for oversight support of the remedial design and remedial action at the former ASARCO Tacoma Smelter Facility in Tacoma, Washington. The contract does not have a set-aside...