Recovery hofr pmis # 152763 the work of this contract consists of performing all necessary investigations, inspections, and studies, followed by the development of designs and preparation of…

Ended Awarded Last action

Contract number
INPT1790100001
Awardee
Awarding agency
Obligated
$37,809

Award facts

Contract value 100% obligated
$37,809.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
541310 Architectural Services
Set-aside
No set-aside
Competition
Full and Open Competition · 1 offer Multiple Award, Fair Opportunity
Pricing
Firm Fixed Price
Place of performance
Boston, MA 02210, USA

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Funding Only Action 1 · Hofr pmis #152763 the purpose of the modification was to delete the HVAC and generator work form the statement of work. -$10,330
Original award $48,139

About this award

This is a firm fixed-price delivery order awarded by the Northeast Region of the Department of the Interior to Bargmann Hendrie + Archetype, Inc., a for-profit organization, for $37,809.00. The work consists of investigations, inspections, studies, and the development of designs and specifications for several construction projects at the Home of Franklin D. Roosevelt (HOFR), including HVAC improvements, emergency generator replacement, and replacement of a handicapped lift. The contract does not have a set-aside designation.

Description

Recovery hofr pmis # 152763 the work of this contract consists of performing all necessary investigations, inspections, and studies, followed by the development of designs and preparation of contract specifications and class a cost estimates for all identified items in the project scope. Provide design, specifications and igce for the following construction projects: a. HVAC improvements 1. Remove the existing american automatrix digital direct control (DDC) system and install a system utilizing programmable thermostats with a software monitoring system. 2. Remove air handling system and associated piping on the second floor of the home installed as part of the 2001 mechanical upgrade. Reinstate all wood and plaster architectural fabric removed or damaged as part of the previous installation. RE-engage existing historic radiators on the second floor to provide heating. 3. Rehabilitate the existing air handling system serving the first floor of the home. Provide duct insulation to eliminate condensation. Provide dampers in supply ducts serving the first floor. B. Emergency generator 1. Replace existing emergency power diesel generator serving hofr. Generator is located in the adjacent boiler bunker building. 2. Replace distribution wiring from emergency generator to hofr. C. Lula handicapped lift 1. Replace the existing machinery, rails, switches and interlocks with new equipment in the existing shaft way. Lift is located in the home of FDR.

Quick answers

Who was awarded contract INPT1790100001?

INPT1790100001 was awarded to Bargmann Hendrie + Archetype, Inc. by Northeast Region (National Park Service) on December 11, 2009.

How much is contract INPT1790100001 worth?

The government has obligated $37,809 on INPT1790100001.

Is contract INPT1790100001 an order under another contract?

Yes. INPT1790100001 is a delivery order under INP09PC60860, an indefinite delivery contract.

Was contract INPT1790100001 competed?

The extent of competition for INPT1790100001 was full and open competition. The government received 1 offer.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award