Delivery Order GS09P13KSD0022-GSP0914WK5004
Award Date 12/2/13
Potential Completion Date 2/26/14
Potential Value $9.6K
Federal Agency
Ultimate Awardee
Not listed PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Not Competed under SAP
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Los Angeles, CA 90012, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
1
Legislative Mandate
Service Contract Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The General Services Administration Public Buildings Service Region 9 awarded a $8,385 firm fixed price delivery order to Logzone Urban Jv2, LLC on September 13, 2022. The contract calls for the replacement of a contaminated water distribution pump at a federal building located at 312 North Spring Street in Los Angeles, California, with work to be completed by December 30, 2022. No set-aside designation was applied to this requirement to replace contaminated water distribution pump number one....
- The General Services Administration's Public Buildings Service Region 9 awarded a $617,551 fixed-price delivery order to Ponciano Construction, Inc. for plumbing riser replacement work at the Los Angeles Federal Building located at 300 N Los Angeles Street in Los Angeles, California. The delivery order was issued against the agency's Zone 3 Construction Services multiple-award contract vehicle for 2016 through 2021, with performance required by November 30, 2020. No subcontractors or set-aside...
- This is a firm-fixed-price contract awarded by the General Services Administration (GSA) to Pundir Group, Inc., an SBA-certified 8(a) Program participant and minority-owned small disadvantaged business. The contract is a Blanket Purchase Agreement (BPA) call under the GSA Multiple Award Schedule (MAS) and has a ceiling value of $11,834.32. The contract requires Pundir Group to cut and remove 100 linear feet of rusted and leaking steel pipe and replace it with new Type L copper pipe with brass...
- <p>The General Services Administration Public Buildings Service Region 9 awarded a firm fixed price delivery order for $21,787.32 to Logzone Urban Jv2, LLC on June 1, 2023. The order is for repair and replacement of chilled water piping at 312 North Spring Street in Los Angeles, California, with work to be completed by September 1, 2023. No set-aside designation was applied to this award to replace infrastructure at a GSA-managed federal building located in downtown Los Angeles.</p>
- This contract was awarded by the General Services Administration (GSA), Region 9, to the Pundir Group, Inc., an 8(a) certified, minority-owned small disadvantaged business. The contract, valued at $247,838.79, is for the replacement of sanitary waste lines at the 300 North Los Angeles Federal Building in Los Angeles, California. The contract is a Definitive Contract with a Firm Fixed Price pricing type and has an ultimate completion date of July 10, 2024. Pundir Group, Inc. will be the prime...
- <p>The General Services Administration Public Buildings Service Region 9 awarded a $7,365 firm fixed price delivery order to Logzone Urban Jv2, LLC of Los Angeles, California on November 10, 2021. The delivery order is for replacing corroded pipe at an unspecified GSA facility in Los Angeles, with work to be completed by December 10, 2021. No set-aside designation was used for this small order to replace corroded infrastructure at a GSA building in the Los Angeles area.</p>
- This delivery order for $3,690.32 was awarded by the General Services Administration Public Buildings Service Region 9 to Logzone Urban Jv2, LLC. The contract is for after hours labor to address a leak on the fifth floor of a federal building located at 312 North Spring Street in Los Angeles, California. No set-aside designation was applied to this firm fixed price contract, which has a period of performance through May 9, 2022. The Public Buildings Service maintains and operates thousands of...
- The General Services Administration's Public Buildings Service Region 9 awarded a $8,610.40 firm fixed price delivery order contract to ABM Industries Incorporated for operation and maintenance labor to support the 300 North Los Angeles Street sanitary waste line replacement project in Los Angeles, California. As the prime contractor, ABM Industries will perform the requested operations and maintenance services at the Los Angeles location from October 2, 2023 through December 29, 2023 to...
- This is a firm fixed-price definitive contract awarded by the General Services Administration (GSA) Region 9 to Ecogreen Services, LLC for the ARRA PLUMBING RESTROOM FIXTURES REPLACEMENT project at the Los Angeles U.S. Courthouse. The contract has a ceiling value of $132,873.88 and a completion date of March 31, 2011. The contract is not set aside for any specific business category. The project involves the replacement of plumbing and restroom fixtures at the Los Angeles U.S. Courthouse...
- The General Services Administration's Public Buildings Service awarded a firm-fixed-price delivery order to ABM Industries Inc., a Fortune 500 facility solutions provider, to install a drench drain with a perforated galvanized steel grate for a groundwater issue at the Federal Building located at 300 N Los Angeles Street, Los Angeles, CA 90012. The potential value of this contract is $128,695.60, with a completion date of September 30, 2019. No set-aside designation was used for this award. As a...
- GS09P13KSD0022Indefinite Delivery Contract
- GS09P13KSD0022-GSP0914WK5004Delivery Order
300-14-06A: REPLACE 4" SECTION OF CORRODED WASTE LINE ON 8TH FLOOR. FEDERAL BUILDING, 300 N. LOS ANGELES ST., LOS ANGELES, CA. 90012
Posted 12/2/13
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $9.6k | 12/2/13 |