Delivery Order GS07F0141W-INR16PD00965

Award Date 8/30/16
Potential Completion Date 10/28/16
Potential Value $65K
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Loveland, CO 80537, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
10
Legislative Mandate
Not listed
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
<p>This is a firm fixed-price construction contract awarded by the U.S. Bureau of Reclamation, a civilian federal agency, to National Electric Coil Inc. to rewind Generator 1 and Generator 2 at the Flatiron Powerplant in Loveland, Colorado. The contract has a ceiling value of $11,590,492.13 and a completion date of June 30, 2017. There is no set-aside designation for this award.</p>
The Department of the Interior Bureau of Reclamation awarded a firm fixed price purchase order valued at $19,613.79 to B&amp;H International LLC to modernize the Mary's Lake Power Plant in Estes Park, Colorado. The contract involves updating controls from analog to digital utilizing specified Schweitzer Engineering Laboratories products, including RTU, PLC hardware, and other control system components. No set-aside designation was used for this sole source award, which was justified based on the...
This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers (USACE), Omaha District, to Electric Power Equipment CO. (EPECO) for a major rehabilitation project at the Garrison Power Plant in Riverdale, North Dakota. The contract, valued at $27,085.28, is for the replacement of the station service switchgear and dry transformer at the power plant. The contract does not have a set-aside designation and was awarded on May 11, 2010, with a completion date of...
The U.S. Bureau of Reclamation awarded a $1,187,039.23 firm-fixed-price definitive contract to ABB Inc., a foreign-owned for-profit manufacturer, to provide a static frequency converter controller for the Eastern Colorado Area Office's Mount Elbert Pumped-Storage Powerplant in Granite, Colorado. The contract was awarded on May 28, 2015, with a completion date of April 30, 2019. No set-aside designation was used. ABB Inc. has previously received direct federal contract awards from the U.S. Army...
GE Renewables US LLC was awarded a firm fixed price delivery order against the Department of the Interior Bureau of Reclamation's $14 million Indefinite Delivery Indefinite Quantity contract to provide rotor repair or replacement for a 130 megawatt generator at the agency's facility in Boulder City, Nevada. The $4.57 million potential value contract has an October 2023 completion date and was awarded in September 2021 without a set-aside designation. Major subcontractors include TCB...
The Army Corps of Engineers awarded Eaton Corporation a $396,732 firm fixed price purchase order to provide high resistance grounding equipment for five generator units at Fort Peck Dam in Montana. The solicitation sought to replace existing low impedance reactors and breakers with modern high resistance grounding systems and cable voltage suppressors to limit unit fault currents and reduce damage from single line-to-ground faults. Performance will take place at the Fort Peck Dam Powerhouse,...
The General Services Administration Public Buildings Service Region 8 awarded Electronic Metrology Laboratory, LLC, doing business as EML, a $9,000 firm fixed price delivery order contract to replace the water pump for the generator at the Byron White Courthouse in Denver, Colorado. Performance will take place at the courthouse location with an expected completion date of April 19, 2022. The award was made on December 20, 2021 under an unidentified contracting vehicle or program. No set-aside...
The Bureau of Reclamation, a civilian agency within the Department of the Interior, awarded a firm fixed-price contract worth $1,284,600.00 to Gardner Zemke Co, a small business contractor, to replace the medium voltage static frequency converter output switchgear at the Mount Elbert Powerplant in Leadville, Colorado. The work involves installing new medium voltage disconnect switches, modifying bus duct connections, and integrating new electrical protection relays. This contract was set aside...
The Department of Energy Western Area Power Administration (DOE WAPA) awarded Front Range Construction, Inc., doing business as M1 Mechanical, a $362,568 Firm Fixed Price definitive contract to provide PMOC LOVELAND HEAT PUMP REPLACEMENT services. The place of performance will be in Loveland, Colorado, and the period of performance is from September 22, 2022 through May 1, 2023. This contract was set aside for 8(a) Sole Source. M1 Mechanical will replace heat pumps as the prime contractor for...
<p>This is a firm-fixed-price purchase order awarded by the Colorado Region of a civilian federal agency to Power To The People, An Electric Service Company. The contract, with a ceiling value of $2,646.23, is for &quot;PUMPHOUSE LAUNCH 1 - EMERGENCY WIRING&quot; and has an ultimate completion date of March 23, 2018. The contract does not have a set-aside designation. No additional details about larger vehicles or major subcontractors are provided.</p>
  • GS07F0141W
    Federal Supply Schedule
  • GS07F0141W-INR16PD00965
    Delivery Order

PUMP GENERATOR RELAY UPGRADE - FLATIRON POWER PLANT, LOVELAND CO

Posted 8/30/16, 12:00 AM