Delivery Order GS06P14GXD0011-47PG0322F0050

Award Date 7/29/22
Potential Completion Date 11/26/22
Potential Value $41K
Federal Agency
Region 6
Awardee
I & L FMS
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
St. Louis, MO 63102, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
Not listed
Legislative Mandate
Service Contract Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The General Services Administration Public Buildings Service Region 6 awarded a $38,538 fixed-price delivery order to I & L FMS to perform facility maintenance and repair services at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. Under the contract, I & L FMS will repack seals on Fire Pump 3, replace the backflow preventer, repair damaged fencing, and repair a leaking heat exchanger at the courthouse facility. The period of performance is from July 31, 2023 through...
This federal contract award to HOF Construction Inc., a general contracting firm based in St. Louis, Missouri, provides for the release, remodeling, and renovation of restrooms, chambers, offices, and courtrooms on the 23rd and 26th floors of the Thomas F. Eagleton U.S. Courthouse in St. Louis. The $1,322,076.00 fixed-price delivery order was issued by the Administrative Office of the U.S. Courts and has a completion date of March 29, 2019. This work is not set aside for any particular...
The General Services Administration's Public Buildings Service Region 6 awarded a $4,082.97 firm fixed price delivery order to I&L FMS to repair the fire alarm system at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. Under the contract, the prime contractor I&L FMS will furnish all necessary labor, materials, equipment and supervision to repair the fire alarm system located at 111 South 10th Street in St. Louis, with work to be completed between July and December 2023....
The Department of Justice Offices Boards and Divisions US Attorney's Offices awarded a $52,400 firm fixed price delivery order to HOF Construction Inc. to remove walls around a printer room and closet and add three electrical floor boxes on the 20th floor of the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. The delivery order was issued against PBS Region 6 Construction Services 2019 indefinite-delivery indefinite-quantity multiple award contract. Performance will take place in...
The Department of Justice United States Marshals Service awarded HOF Construction Inc. a $210,843.60 firm fixed price delivery order for renovations at the Thomas F. Eagleton United States Courthouse located at 111 South 10th Street in St. Louis, Missouri. The renovations are to be completed by March 28, 2021 at the specified courthouse location. No set-aside designation was applied to this contract action. HOF Construction Inc. will serve as the prime contractor to deliver the renovations for...
This is a firm-fixed-price delivery order contract awarded to HOF Construction Inc., a small business construction company based in St. Louis, Missouri. The contract, valued at $5,984,069.50, is for the renovation of U.S. Courts space on floors 1 and 3 of the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. This includes replacing the breakroom sink and faucet. The contract was awarded on December 15, 2023, with a completion date of March 7, 2026. It is funded by the Administrative...
This firm-fixed-price delivery order was awarded by the General Services Administration (GSA) Heartland Region 6 to HOF Construction Inc., a small business construction services provider based in St. Louis, Missouri. The $220,815 contract is for repairs to the Thomas F. Eagleton United States Courthouse in St. Louis, Missouri, to return the En Banc Courtroom to its original condition following a pipe freeze incident. The contract was issued under the GSA Heartland Region 6 Design Build...
The General Services Administration's Public Buildings Service Region 6 awarded a $33,216 firm fixed price delivery order to J.E. Novack Construction Company, doing business as J.E. Novack, to repair and reroute the makeup line for the glycol cooling tower that froze at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. The delivery order was issued against the agency's previously awarded PBS Region 6 Construction Services 2019 indefinite-delivery/indefinite-quantity multiple award...
The General Services Administration's Public Buildings Service Region 6 awarded a $26,010 delivery order contract to Oculus Inc. to conduct a sprinkler system study at the Thomas F. Eagleton United States Courthouse located in St. Louis, Missouri. The firm fixed price contract runs from August 23, 2021 to February 28, 2022 and calls for Oculus to analyze the courthouse's sprinkler system and provide any necessary recommendations for maintenance or upgrades. As the federal government's premier...
The General Services Administration Public Buildings Service Region 6 awarded a firm fixed price delivery order contract valued at forty-five thousand six hundred dollars to Cimmaron Electric Inc. to complete sanitary and storm drain repairs at the Whittaker Courthouse located at 400 E 9th St. in Kansas City, Missouri. Work is to be performed at the specified location and be completed by January 20, 2022. No set-aside designation was applied to this award to address needed plumbing...
  • GS06P14GXD0011
    Indefinite Delivery Contract
  • GS06P14GXD0011-47PG0322F0050
    Delivery Order

PERFORM RESTORATION OF USDC COMBINED CHAMBERS DUE TO A RUPTURED SPRINKLER PIPE AT THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO.

Posted 7/29/22