Delivery Order FA890325D0034-FA890325F0198
- Not listed
- This is a firm-fixed-price contract awarded by the Air Education and Training Command to Sla+Cyntergy JV, a small business joint venture, to design a new 10,000 square foot Human Performance Training Center at Laughlin Air Force Base in Del Rio, Texas. The contract has a ceiling value of $1,066,164.80 and is set to be completed by July 27, 2024. Sla+Cyntergy JV is an architecture, engineering, and construction services provider that has been awarded over $9 million in prime federal contracts,...
- The U.S. Air Force's Air Education and Training Command awarded a delivery order valued at $67,572.63 on March 6, 2025, to Sla+Cyntergy JV for architect and engineering services at Altus Air Force Base, Oklahoma and Sheppard Air Force Base, Texas. This award represents a delivery order under a larger $20 million Indefinite Delivery/Indefinite Quantity (IDIQ) contract vehicle established with the joint venture for architectural and engineering services at these two Air Force installations. The...
- The U.S. Air Education and Training Command has awarded a delivery order valued at $63,515.51 to Sla+Cyntergy JV, a small business joint venture based in Wichita Falls, Texas, for architect and engineering services at Altus Air Force Base in Oklahoma and Sheppard Air Force Base in Texas. This delivery order falls under a $20 million Multiple Award Indefinite Delivery-Indefinite Quantity (IDIQ) contract vehicle established for architectural and engineering services at these two installations. The...
- The U.S. Air Education and Training Command awarded a Firm Fixed Price, Definitive Contract valued at $1,741,541.75 to Sla+Cyntergy JV, a small business joint venture, to provide design services for the renovation of Club XL at building 472 on the Commons. The contract has an ultimate completion date of August 16, 2025. This award is associated with Sla+Cyntergy JV's existing indefinite-delivery, indefinite-quantity (IDIQ) contracts with the Air Education and Training Command and Air Combat...
- The U.S. Air Force's Air Education and Training Command (AETC) awarded a $345,866 delivery order to Sla+Cyntergy JV on October 3, 2025, for architectural and engineering Title I design services at Sheppard Air Force Base in Texas. The contract requires the joint venture to furnish professional AE design services to complete work associated with Project VNVP261602, which involves the installation of HVAC system B2080 in accordance with the statement of work. This delivery order operates under a...
- The U.S. Air Force's Air Education and Training Command awarded a $369,277 delivery order to Sla+Cyntergy JV on March 10, 2025, for facility renovation and mechanical system replacement work at Sheppard Air Force Base in Texas. The project scope includes renovating the second floor of Building 960 to create space for the new Integrated Resilience Office, as well as a complete lifecycle replacement of the R22 heating, ventilation, and air conditioning system serving the entire building. The...
- The U.S. Air Education and Training Command awarded a $2.25M firm fixed-price delivery order to Per-Geesh TLI JV, LLC on September 25, 2025, for repair and restoration work on Laughlin Drive extending to Ribas Dominicci Circle at Laughlin Air Force Base in Del Rio, Texas. This delivery order is issued under a larger $9.75M Indefinite Delivery Indefinite Quantity (IDIQ) contract that Per-Geesh TLI JV, LLC secured with AETC on September 27, 2024, which provides a vehicle for multiple task orders...
- The Department of the Air Force Air Education and Training Command awarded a $333,808.86 firm fixed price delivery order contract to HDR And Tehama Joint Venture under the Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program (AE NEXT) master indefinite-delivery indefinite-quantity contract. The purpose of this project is for HDR And Tehama Joint Venture to complete a conceptual charrette at Laughlin Air Force Base to deliver a concept of...
- The U.S. Air Education and Training Command has awarded a $1.21 million firm fixed-price delivery order to Per-Geesh TLI JV, LLC for asphalt repair work in the first area from B53 to B206 at Laughlin Air Force Base in Del Rio, Texas. The contract, awarded on September 26, 2025, carries an ultimate completion date of September 18, 2026, and represents a task order issued under the vendor's existing $9.75 million Indefinite Delivery Indefinite Quantity contract with Air Education and Training...
- This is a firm-fixed-price delivery order contract awarded by the Air Education and Training Command (AETC), a defense agency, to Sla+Cyntergy JV, a small business joint venture. The $95,553.73 contract is for the renovation of portions of the second floor of Building 1900 at Sheppard Air Force Base in Texas to support a multi-unit consolidation effort. The contract has a period of performance through June 2025 and was awarded on March 11, 2025. Sla+Cyntergy JV is a small business joint...
- FA890325D0034Indefinite Delivery Contract
- FA890325D0034-FA890325F0198Delivery Order
Cyntergy-Sla JV was awarded a $1.11 million firm fixed-price delivery order by the Air Education and Training Command (AETC) for architect-engineering services supporting the design of construction documents for the repair of Building 507 at Laughlin Air Force Base in Texas. The project, designated MXDP241005, will provide 100% design documentation to facilitate the establishment of T-38 Talon swing space—temporary operational facilities that allow training operations to continue while primary facilities undergo renovation. The contract was awarded on September 12, 2025, with an ultimate completion date of September 11, 2026, and performance will be conducted in Del Rio, Texas. No small business set-aside designation was applied to this procurement. This engagement supports AETC's mission to develop military officers and enlisted personnel through flight training and technical instruction. The T-38 Talon is a primary jet trainer aircraft used across the Air Force training pipeline, making swing space infrastructure critical to maintaining uninterrupted training operations during facility repairs. The delivery order structure and firm fixed-price arrangement provide cost certainty for this design phase while the completion timeline allows for subsequent construction activities to address Building 507's repair requirements.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $1.1m | 9/13/25 |