Project #112819 the contractor shall furnish all labor, material, equipment and all operations necessary to provide on-call maintain and repair roads, parking lots, sidewalks, pavements and grounds in…
Ended Awarded Last action
- Contract number
- 0057
- Awardee
-
Diaz Enterprises Inc. UEI H23CW8L2UB75
- Awarding agency
-
AFLCMC Wright Patterson AFB
Lifecycle Management Center, Department of Defense
- Obligated
- $58,713
Award facts
- Opportunity
-
- FA860109B0005 Solicitation number
- IDIQ On-Call Maintain and Repair and Alter Roads, Parking Lots and Sidewalks, WPAFB Award Notice · Posted Jul 9, 2009
- Contract value 100% obligated
- $58,712.65 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- Funding agency
- Air Force Materiel Command Air Force, Department of Defense
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- PSC
- Z222 Maint-Rep-Alt/Hwys-Rds-Sts-Brdgs-Ra
- Set-aside
- Competitive 8(a)
- Competition
- Full and Open Competition after exclusion of sources · 2 offers Sealed Bid
- Pricing
- Firm Fixed Price
- Place of performance
- WPAFB, OH 45433, USA
- Legislative mandates
-
- Davis-Bacon Act FAR subpart 22.4
Award details come from SAM.gov/FPDS.
Description
Project #112819 the contractor shall furnish all labor, material, equipment and all operations necessary to provide on-call maintain and repair roads, parking lots, sidewalks, pavements and grounds in accordance with project number 112819 detailed specifications and drawings at wright-patterson AFB, OH 45433. A. Work location: area a facility 10837/fisher house II B. Work description: replace catch basin in chidlaw road with a deeper catch basin. Replace approximately 320 LF of existing 6 pipe with new 12 pipe, at new slope, to accommodate deeper catch basin. Provide a new catch basin where drain pipe turns 45 degrees, and also where surface elevation drops. Provide conduit from new transformer to connect back to secondary feed to the fisher house and secondary feed to the gazebo. Remove existing transformer pad and fence and provide 3 X 3 X 3 french drain where transformer SAT. Grade area to french drain and SOD. Performance period: 21 days C. Summary of work quantities: bid item description quantity 0003AE provide post 25 EA 0003AL provide post 1 EA 0003AS provide 4 PVC pipe, schedule 40 50 LF 0003AT excavation 275 CY 0003AU remove pavement 5 CY 0003AV remove structural concrete 2 CY 0003AW remove curb and gutter 30 LF 0003AX remove sidewalk 200 SF 0003AZ remove inlet 1 EA 0003BA provide select fill 90 CY 0003BG provide compacted aggregate 310 T 0003BN provide asphalt concrete, ODOT-448 10 T 0003BW provide curb and gutter 30 LF 0003BY provide concrete sidewalk 200 SF 0003DL provide topsoil, fertilizer and SOD 830 SY 0003DV provide 12 RCP storm pipe 330 LF 0003DZ provide inlet 1 EA
Quick answers
Who was awarded contract 0057?
0057 was awarded to Diaz Enterprises Inc. by AFLCMC Wright Patterson AFB (Lifecycle Management Center) on August 31, 2011.
How much is contract 0057 worth?
The government has obligated $58,713 on 0057.
Which agency awarded contract 0057?
AFLCMC Wright Patterson AFB (Lifecycle Management Center) awarded 0057, with funding from Air Force Materiel Command (Air Force).
Is contract 0057 an order under another contract?
Yes. 0057 is a delivery order under FA860109D0014, an indefinite delivery contract.
Was contract 0057 competed?
The extent of competition for 0057 was full and open competition after exclusion of sources. The government received 2 offers. It was set aside: Competitive 8(a).
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award