Delivery Order FA820112D0025-0002

Award Date 6/26/13
Potential Completion Date 3/31/14
Potential Value $498K
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Bear River City, UT 84301, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This contract is a modification to an original statement of work (SOW) for a project at the White Sands Missile Range in New Mexico. The modification increases the size of the concrete launch pads, adds a cast iron pipe underneath the slab, and includes additional tie-downs and a continuous steel plate blast deflector. The contract was awarded to a prime contractor by the U.S. Department of Defense's Southwest Region on March 14, 2007 with a completion date of March 19, 2007. The contract is a...
This delivery order from the Department of the Air Force Materiel Command to Integrated Construction Management, Inc. is for repair and replacement of HVAC systems at Building 2 at South Base, Georgia. The firm fixed price contract valued at $794,203.77 runs from March 2 to May 5, 2020. Major subcontractors include CMS Construction & Management Services for concrete work, equipment installation and building sealing; D&R Global Enterprises for controls integration; Maloof Weathertight...
This is a firm fixed-price delivery order contract (W912DQ21D4009 | W9123822F0011) awarded by the U.S. Department of the Air Force to the prime contractor Burns & McDonnell Engineering Company, Inc. The contract has a ceiling value of $5,900,901.95 and an ultimate completion date of November 30, 2025. The contract was not set aside. The prime contractor, Burns & McDonnell Engineering Company, Inc., is a subsidiary of Burns & McDonnell, Inc., an engineering, architecture, and...
This is a $805,334.94 firm fixed price contract awarded by the U.S. Air Force Global Strike Command to James Talcott Construction, Inc., a for-profit construction services company. The contract is for the repair and replacement of the existing pneumatic and electrical/electronic HVAC controls with new direct digital controls at the Headquarters building on Malmstrom Air Force Base in Montana. The work is funded through the American Recovery and Reinvestment Act (ARRA) and is intended to...
This federal contract was awarded by the Department of the Air Force Materiel Command to Aptim Federal Services LLC, a global industry leader in critical infrastructure, resilience, program management, environmental services, sustainability and energy solutions. The contract is for the HIGH PRESSURE AIR SYSTEM UPGRADE - FOUNDATIONS project, with a potential value of $1,822,751.35, and a completion date of November 30, 2020. The contract is a Delivery Order under the Facilities Acquisitions for...
This is a $74,268,977.49 firm fixed-price design-build contract awarded by the U.S. Army Corps of Engineers' Albuquerque District to BL Harbert International LLC for the construction of an MQ-9 Formal Training Unit (FTU) Operations Facility at Holloman Air Force Base in New Mexico. The project includes a 6,970 square meter single-story facility with controlled space requirements, demolition of an existing building, utilities, site improvements, and several optional additions such as a mass...
This is a firm-fixed-price delivery order awarded by the U.S. Army Corps of Engineers (USACE) Los Angeles District to JF Engineering, Inc., an 8(a) sole source contractor, for the repair and replacement of HVAC systems in Building 1727 at Edwards Air Force Base in California. The contract has a performance period of 270 calendar days and a ceiling value of $1,526,705.00. The work includes demolition and installation of chillers, boilers, pumps, air handlers, and fan coil units, as well as...
The Department of the Air Force Materiel Command awarded a $509,232 firm fixed price delivery order contract to West Point Contractors, Inc. for RPR Missile Research and Development to support the construction of a drive-through bunker at Edwards Air Force Base in California. The contract has a period of performance from September 2020 through October 2021. As the Materiel Command oversees research, development, testing and evaluation programs for the U.S. Air Force, this delivery order was...
This is a definitive, firm-fixed price contract awarded by the Air Force Space Command (VPAFSPC-A) to Pacific TECH Construction, Inc., a minority-owned, small disadvantaged business. The contract, valued at $1,604,564.19, is for the repair of the HVAC system in the Motor Assembly Building at Cape Canaveral Air Force Station in Florida. The contract is funded through the American Recovery and Reinvestment Act (ARRA) and was awarded on an 8(a) sole source basis. The contract has an ultimate...
This is a firm fixed-price delivery order awarded by the U.S. Air Force's Global Strike Command to MW- All Star Joint Venture, a small business contractor. The contract is for the repair of the HVAC system, including 400Hz power and compressed air outlets, in the Aircraft Restoration Facility (Buildings 5205/5206) at Whiteman Air Force Base in Missouri. The work is being funded under the American Recovery and Reinvestment Act (ARRA) of 2009, with a ceiling value of $129,997.93 and a completion...

CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, LABOR, AND SUPERVISION NECESSARY TO DESIGN AND REPAIR THE MISSILE TEST THRUST BLOCK IN BUILDING 60000 AT UTTR. REPLACE ALL STEEL PLATES IN THE FACE OF THRUST BLOCK AND ON FLOOR TO INSURE THAT THE THRUST BLOCK WILL BE CAPABLE OF WITHSTANDING 1,000,000 POUND FEET OF THRUST WITH A 3.65 TO 1 SAFETY FACTOR AS ORIGINALLY DESIGNED. DESIGN AND INSTALL HVAC SYSTEM. PROVIDE NEW R18 INSULATION WITH COVER. ALSO PROVIDE FALL PROTECTION. ALL WORK SHALL BE IN ACCORDANCE WITH THE REVISED STATEMENT OF WORK DATED 23 MAY 2013 AND ALL ITEMS IN SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS. THE PERIOD OF PERFORMANCE FOR THIS PROJECT SHALL BE 145 CALENDAR DAYS FROM THE CONTRACTORS RECEIPT OF NOTICE TO PROCEED.

Posted 7/2/13